A set of internal doors looks simple on a schedule line: quantity, size, finish. On site it becomes the item every other trade has to work around — flooring, skirting, wall finishes, ironmongery, handover dates. That is why the classic panel hinged door is one of the easiest places in a villa or hotel fit-out to lose time and money. Below is what a project buyer should actually verify before placing the order with a supplier.

Why this line item causes more rework than its price suggests

Panelled hinged doors sit at the junction of three things that rarely stay still on a project: the opening dimensions, the wall finish thickness, and the design intent for the reveal. A door ordered against unfinished drawings has to absorb whatever the builder leaves behind — and absorbing it usually means packing out frames on site, re-tinting or re-veneer-ing an edge, or swapping ironmongery that no longer lines up with the leaf.

Classic panel styles make this worse in a specific way. The mouldings, stiles and rails are profiled work, so a cut, a trim or an on-site adjustment is visible; you cannot sand it away the way you can with a plain flat face. If the supplier ships to nominal sizes and the openings move by even a few millimetres, the fix is not cosmetic.

1. Does the supplier build to your schedule, or sell you a catalogue size?

This is the first question, and it filters out most of the market. Ask directly whether height, width, leaf thickness and frame depth are set from your door schedule for each opening type, and whether the same door can be produced in different sizes across floors or unit types without a tooling charge.

A supplier working project-to-project will take the schedule as the starting point. On our side that is exactly how this range runs — Classic Panel Hinged Doors are made to measure, with the material, finish and layout specified per project rather than fixed to a stock size. The same applies across the wider door range, from Standard Interior Hinged Doors for high-volume residential and hotel room corridors to Flush Hinged Doors where the door is meant to disappear into a finished wall.

What to ask for in writing: confirmation that each opening on your schedule gets its own dimensioned drawing, and confirmation of who signs it off before production starts.

2. How far can the finish actually be matched?

On a villa or hospitality job the door rarely stands alone. It has to read as one system with the wardrobes, wall panelling, skirting and joinery. A supplier who makes all of those in the same factory can match the veneer species, grain direction, lacquer sheen and edge detailing across the package. A supplier who only makes doors will hand you a close-but-not-exact colour and leave your site team to defend it.

Concretely, ask for: physical finish samples in the species and sheen you have specified, not printed charts; the make-up of the core and facing construction for the leaf; and how the same finish is carried through to architraves, casings and any matching panelling. Our door programme is built alongside our cabinetry and wall-panel ranges, which is why pieces such as Wood Veneer Hinged Doors and Decorative Interior Doors can be specified to sit with the rest of the built-in package instead of next to it.

3. What is included in the price — leaf, frame, or both?

Door pricing is only comparable when everyone quotes the same scope. Before comparing numbers, put every quote into one table:

Scope item What to confirm per supplier
Leaf Construction, thickness, number and profile of panels, edge detail, face direction (left/right hand) per opening.
Frame / casing Frame depth matched to the actual wall build-up, including plasterboard layers, insulation and finish thickness.
Ironmongery preparation Hinge positions, lock and latch mortices, strike plates — cut in the factory to your ironmongery schedule, or left for site?
Architrave / skirting return Whether trims are supplied with matching finish, and how they are packed.
Packaging and marking Opening number on each bundle, protection for finished faces, and packing suited to ocean freight rather than a local delivery.
Spares A defined allowance of spare leaves or frames for post-handover replacement in hotel and rental stock.

The two rows that cause the most arguments are frame depth and ironmongery preparation. Frame depth has to be given by you, from the wall build-up drawings — not guessed by the supplier. Ironmongery cut in the factory is far cleaner than mortising a panelled leaf on site, but only if your ironmongery schedule is frozen before production.

4. Approval samples and the drawing loop

For a classic panel design, ask for one approved reference door — a full leaf with frame in the specified finish — before the batch is released. It settles three arguments at once: how deep the mouldings read, how the sheen looks under the actual lighting, and how the panels sit relative to the handle line. Then confirm the number of drawing revision rounds included in your order, and what a change costs after sign-off.

5. Freight, sequence and site readiness

Doors imported for an overseas project arrive months before the openings are finished, so storage and sequencing become your problem unless the supplier plans them with you. Ask how delivery is split — by floor, by unit type, by block — and whether the packing list matches your door schedule line by line so the site team can find each leaf without unpacking everything.

Freight handling also changes the specification. Finished faces, glass lights and moulded profiles need different crating from flat-pack casings. We handle freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery as part of the package (see Logistics and Door-to-Door Delivery), but transit terms, duties and delivery scope are agreed project by project rather than assumed.

6. Who answers when the door does not fit?

The last test of a supplier is what happens after the container lands. Ask who attends the site inspection and snag list, how replacement leaves are produced for an opening that moved on site, and how spares are supplied years later for hotel or rental stock. A door line bought as part of a wider built-in package has a real advantage here: one party is accountable for doors, joinery, panelling and the fixings they share, instead of three suppliers each pointing at the next.

Before you place the order: send your door schedule, wall build-up sections and ironmongery schedule to the supplier, and ask for a dimensioned drawing plus one physical finish sample back. If a supplier cannot return both without a charge, that is your answer — however good the price looked.

7. Do you need a door supplier, or one party accountable for the whole fit-out?

This is the question that decides how many interfaces your site team has to police. Every separate supplier adds a boundary — doors against joinery, joinery against wall panelling, panelling against flooring — and on an imported project those boundaries are where defects get argued about for months.

If your project also needs cabinetry, wardrobes, wall panelling, flooring or bathroom fixtures, sourcing the doors together with those trades removes a whole category of interface problems. That is how we work on villa and hospitality projects — one one-stop furniture and building materials supplier covering design coordination, custom/OEM production, logistics and installation support, with the door range specified as part of the same built-in package. Browse the full Windows and Doors collection to see which door types are available for project-specific sizing and finishes.

If your project also needs cabinetry, wardrobes, wall panelling, flooring or bathroom fixtures, sourcing the doors together with those trades removes a whole category of interface problems. That is how we work on villa and hospitality projects — one one-stop furniture and building materials supplier covering design coordination, custom/OEM production, logistics and installation support, with the door range specified as part of the same built-in package. Browse the full Windows and Doors collection to see which door types are available for project-specific sizing and finishes.