A door schedule is where project coordination either holds together or quietly falls apart. By the time interior doors reach the top of the list, wall finishes, flooring, joinery and ironmongery have already been specified by different people on different dates. This article walks through how we place Santerson Wood Veneer Hinged Doors into a whole-project materials schedule, so the doors arrive matching the joinery, the floors and the openings that were actually built.

Why wood veneer hinged doors need scheduling, not just selecting

Wood veneer is a thin slice of real timber over an engineered substrate. That gives it the grain and depth buyers want on a hinged door leaf, while the engineered core keeps the leaf flatter and more dimensionally stable than a wide solid-timber panel would be in conditioned interiors. The same characteristic drives the scheduling discipline: veneer is finished per batch, so grain figure, tone and sheen are agreed from physical samples rather than from a colour code on a drawing.

Our hinged door collection is specified project by project. The page for this range states three things we build the schedule around: made-to-measure sizing, material and finish options, and layouts tailored to the space. Nothing in that list can be fixed before openings are surveyed, which is why doors belong in the materials schedule early and get revised as the drawings develop.

Step 1 — Group doors with the joinery that sits beside them

A hinged door leaf rarely stands alone. It reads against skirting, architraves, wardrobe fronts and cabinetry in the same sightline. When veneer doors are scheduled separately from interior fixtures, you get two batches of "oak" that do not match under site lighting.

We schedule the wood-finish package as one line group: door leaves and frames, veneer wardrobe fronts, and any panelled walling that abuts a door reveal. The same veneer batch, the same finish build-up and the same sheen are then applied across the group. Where a project calls for concealed or flush detailing, we align the door schedule with Integrated Door & Paneling so the leaf and the panel run on one continuous grain logic.

Step 2 — Survey openings against the finished floor level

Made-to-measure sizing only works if the measurement refers to the completed condition. Our door schedule records, for each opening:

  • structural opening width and height, plus the tolerance each side
  • finished floor level, including the flooring build-up and any threshold detail at the doorway
  • wall make-up at the reveal — plasterboard, panel or stone — which sets the frame projection
  • leaf orientation, hinge hand, and whether the leaf swings into or out of the room
  • ironmongery preparation: hinge positions, lock body, and any concealed closer or magnetic lock

Flooring is the item most often left out of door dimensions. On a villa job with engineered wood flooring laid over screed and underlay, the door undercut and the threshold need the finished level, not the slab level. We take the flooring schedule and the door schedule in one review pass so the two sets of numbers are agreed once, by both trades.

Step 3 — Lock veneer and finish with approved samples

Before any leaf is pressed, we issue physical samples for approval: the veneer species and cut, the grain layout (matched, quarter-matched or random), the stain or bleaching if specified, and the lacquer sheen. The approved sample becomes the reference in the schedule, with a sample number and date against every door line.

This is also where veneer variants get used deliberately rather than by accident. Our wardrobe range shows how broad the veneer palette is — Natural Oak Veneer, Walnut Veneer and Smoked Veneer are separate schedules in their own right, and the same distinction applies to door leaves. A schedule that simply says "oak veneer, matt" is not a specification; it is an argument waiting to happen on site.

Step 4 — Schedule the operating type per opening, not per floor

The same veneer can be ordered across three operating types, and mixing them deliberately keeps a plan workable without breaking the finish language:

  • Hinged — the default for bedrooms, bathrooms and store rooms where a clear swing path exists.
  • Wood Veneer Pocket Doors — for corridors and wardrobe runs where a swinging leaf would eat circulation space; the pocket reveal and frame need to be built in from the framing stage.
  • Wood Veneer Folding Doors — for wide openings, dressing-room entrances and service areas that occasionally open up.

Each type carries different frame details, floor guides and wall preparations, so the schedule states the type per opening. Changing a hinged leaf to a pocket door after the stud work is set is a wall rebuild, not a substitution.

Step 5 — Sequence production, packing and delivery by zone

Doors are one of the last trades through the door and the first thing every inspector looks at, so they should be one of the last packages delivered. We produce them after openings are confirmed on site, then pack by zone with each leaf and frame labelled to the schedule line it belongs to — not bundled by size. For international shipments this is also where paperwork is aligned: packing lists, commercial invoices and container loading planned so the door package lands when the fit-out team needs it, coordinated through our logistics and door-to-door delivery service.

Hinges, closers and lock bodies ship either with the leaves or to a named holding point on site. Either way the schedule says which, because ironmongery arriving after installation has started is the most common cause of veneer doors being hung late and handled roughly.

Step 6 — Hand over the schedule as the snag list

The finished materials schedule doubles as the inspection record: line by line, opening by opening, with the approved sample reference beside each door. That gives the installing team and the client's representative one document to sign off against — leaf alignment, gap consistency, finish continuity at reveals, and ironmongery operation.

If you are assembling a materials schedule for a villa or hospitality project now, send us the door list together with your flooring and joinery schedules. We will return made-to-measure sizing, veneer and finish samples for approval, and a door package that lines up with the rest of the woodwork — supported by our custom & OEM service and project services.