A Santerson Storage & Display Combo looks simple on a drawing: open shelves, closed cabinets and a screen in one wall. It is exactly that simplicity that creates trouble later, because the specification has to carry dimensions, storage logic, finishes and services at the same time. The listing sits in the Media & TV Walls collection and is made to measure, with finish, layout and dimensions specified per space. Nothing about it arrives pre-decided, so alignment between designer and buyer before production is what keeps the wall working on site.

Read this first: our product pages list made-to-measure sizing, material and finish options, and a layout tailored to the project. They do not publish fixed dimensions or standard module sizes for this system. Confirm every dimension, material, hardware item and electrical point for your own project before we start production.

What the product listing actually promises

The description covers a configurable storage and display combination within Media & TV Walls, intended for residential wall system projects. Three things are open by design: the finish, the layout and the dimensions. The note on the page asks buyers to confirm the storage configuration for each project.

That wording matters in a procurement sense. A fixed catalogue item comes with a size you design around. This system is the other way round — you supply the opening, the use case and the look, and the wall follows. So the specification conversation should start with what the household or hospitality space needs to hold, not with which shelf pattern appears in the photograph.

Where designers and buyers usually drift apart

In projects we have delivered, disagreements about a media wall rarely surface at quotation stage. They appear during installation, when someone asks where a component is meant to sit. The five gaps below are the ones worth closing in writing.

  • Storage logic before elevation. A designer draws proportions; a buyer knows the objects that must live there — consoles, books, glassware, cables, board games. If the closed-to-open ratio is decided by eye rather than by inventory, the wall looks right and stores badly.
  • Screen size versus screen type. A niche cut for one television may not suit a replacement of different depth or mounting method. Agree the display category, its mounting approach and the ventilation path early, then set the opening around it.
  • Services behind the wall. Power points, low-voltage cabling, aerial or network runs and any lighting feed need positions on the drawing before panels are made. Adding them afterwards means cutting into finished components.
  • Finish continuity across trades. The same veneer, lacquer or laminate has to match what another supplier is producing for doors, wardrobes or kitchen cabinetry in the same build. Send finish samples and reference codes rather than colour names.
  • Substrate and site conditions. A wall system fixed to stud, masonry or an existing finished surface behaves differently. The fixing method and load path should be confirmed by the site team, not assumed from a rendering.

A specification sheet both sides can sign

Use this as a working checklist. When each line has one named owner and a confirmed value, the drawing and the order mean the same thing.

Opening and envelopeFinished width, height and depth; ceiling and skirting treatment; out-of-plumb allowance agreed with the site team.
Layout splitWhich sections are closed, glazed or open; shelf positions; drawer versus door for each bay.
Media zoneDisplay category and size range, mounting method, ventilation, remote signal path, cable routing.
ServicesPower point locations, low-voltage runs, lighting feed and switching — coordinated with the electrical contractor.
Materials and finishBoard material, surface code or sample reference, edge treatment, hardware type and brand where required.
Fixing and accessSubstrate, fixing method, load assumptions, clearance for maintenance of equipment behind panels.
Scope handoverWho supplies the television and devices, who runs the cables, who connects and tests on site.

The last row is the one most often skipped. A media wall spans three trades — joinery, electrical and AV — and an unclear handover leaves a completed cabinet with nothing connected to it.

Choosing the right system in the collection

Media & TV Walls is not a single product. If the brief calls for something different, these related listings may fit better — and it is cheaper to decide now than to change mid-production:

If storage sits away from the screen, an integrated wall may be the better starting point — Santerson Mixed Open & Closed Storage and Santerson Integrated Media Storage follow the same made-to-measure approach.

How our team closes the gap

Because these systems are custom-built, we work from your drawings rather than selling you a standard size. Interior Design Services cover space layout planning, furniture layouts and 3D visual renderings, plus coordination of drawings and production with on-site guidance. Where the wall forms part of a wider fit-out, our Turnkey Solutions team carries the same information through cabinetry, doors, wardrobes and finishes so that one specification governs the whole apartment or villa.

Production follows a confirmed detail sheet. We manufacture to the agreed dimensions, materials and hardware, then arrange freight and door-to-door delivery for the package. On arrival, installation support covers fitting, inspection of snags and handover. For buyers who need the wall built to their own drawings and finish codes, our Custom & OEM Service handles bespoke material finishes and textures alongside prototyping.

Practical note for overseas buyers: specify the wall on metric dimensions, state the substrate at each fixing point in writing, and name the party responsible for electrical work in your market. Import terms, duties and delivery scope are confirmed case by case rather than assumed from marketing pages.

Questions we receive most often

Can the wall be matched to kitchen cabinetry in the same apartment?

Yes, provided the finish is fixed by sample or code rather than by colour name. Send the reference to us with the drawing and we will match the board surface and edge treatment accordingly.

Do you supply the television and audio equipment?

Our scope is the joinery, its services provision and installation of the wall itself. Equipment is usually sourced locally so that warranties and service apply in your country. Decide who supplies it before we set the niche dimensions.

What information do you need to quote?

A dimensioned elevation or floor plan showing the wall, the intended storage split, the display category and mounting method, plus finish references. From that we can confirm materials, hardware and a price for your configuration.

Send us your elevation. Share drawings, photographs of the space and the objects the wall must hold, and our team will come back with a layout proposal, material options and a quotation for your specific Santerson Storage & Display Combo configuration.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or through our contact page. Enquiries receive a response within 24 hours. Business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).