A clear glass aluminium frame wardrobe usually arrives on site in three separate systems — the carcass and shelves, the aluminium-framed leaves, and the glass infill. If those three travel as one mixed bundle, the buyer inherits the damage risk. The questions below are the ones worth putting to a supplier before the order is placed, not after the container has been discharged.
1. Are the frame, the glass and the carcass packed separately?
Glazed door leaves are the part that fails in transit: a leaf loaded flat against a carcass panel takes point loads on the glass edge wherever the frame is not fully supported. Ask the supplier to confirm in writing that glazed leaves travel upright in their own racking, that the glass is separated from board panels by a cushioning layer, and that no glazed unit shares a bundle with loose shelves or hardware. For Clear Glass Aluminum Frame Wardrobes, the glass is fully transparent, so an edge chip or a star crack shows immediately once the doors are hung — there is no tint to hide it.
2. How is each unit identified against the room schedule?
Wardrobe orders on villa and apartment projects rarely consist of one repeated item; each unit has its own width, height, door count and internal layout. Confirm that every carton carries a label matching the shop drawing — unit code, room or apartment number, left/right handing of the doors, and total pieces per unit. A packing list that only states a piece count gives the site team nothing to reconcile against, and mixed-up leaves are one of the slowest snags to resolve on a finished installation.
3. What protection is used for the frame finish?
Anodised and powder-coated aluminium profiles scratch where they rub, and the marks sit on the visible face of the door. Ask whether profiles are interleaved or edge-protected, whether the finished faces are kept away from strapping and banding, and whether corner protectors are used on tall leaves. If your project mixes tints — Frosted Glass Aluminum Frame Wardrobes in the bedrooms, Smoked Glass Aluminum Frame Wardrobes elsewhere — confirm that each tint is packed and labelled as its own group, so nothing has to be sorted on site.
4. How will the shipment be loaded, and how is damage recorded?
Ask how the glazed units are blocked and braced inside the container, and where they sit relative to heavier cabinetry. The supplier's logistics service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork, shipment tracking and door-to-door delivery; that scope is worth confirming item by item for your own consignment rather than assuming it. Agree in advance how damage is documented — dated photographs against the carton labels before unpacking, and a marked-up copy of the packing list — because a claim filed after the pieces have been moved into the apartments is much harder to support.
5. What happens to a part that arrives damaged?
With made-to-measure joinery there is no shelf replacement, so ask which parts can be re-manufactured and shipped separately, and how the replacement is identified against the original order. The installation and after-sales service on site lists inspection and snag resolution, warranty coverage and spare parts or replacement; get the current terms for your project in writing before production starts, along with what is excluded.
What to have in writing before production is released
Packaging points to confirm on the purchase order
- Glazed leaves packed upright, separated from board panels and hardware.
- Finished aluminium faces interleaved, with corner protection on tall leaves.
- Carton labels tied to the shop-drawing unit codes, including door handing.
- Packing list showing pieces per unit, not just a total count.
- Loading plan for the container, stating where glazed units sit.
- Agreed damage-reporting method and the replacement route for made-to-measure parts.
SANTERSON manufactures Clear Glass Aluminum Frame Wardrobes to project-specific dimensions, layouts and finishes. Send the room schedule and drawings with your enquiry, and state your packaging requirements in it — that is where the conversation about how the wardrobes travel should start.
Packaging, freight terms, warranty coverage and response arrangements vary by consignment; confirm them for your order before production is released.