A two tone lacquer wardrobe is one of the easiest ways to make a bedroom or dressing room feel planned rather than furnished. The contrast between a lighter door face and a deeper carcass, or the other way round, reads as joinery instead of flat-pack. It is also one of the easiest items to get wrong on a quote request, because a line reading "two tone lacquer wardrobe, one wall length" tells the factory almost nothing about what has to be manufactured. The difference between a rough estimate and a price you can actually sign usually comes down to five pieces of information.

Start from the opening, not from a catalogue size

Our Two Tone Lacquer Wardrobes are made to measure: sizing, finish and internal layout are specified per project, which is what allows a wardrobe to sit into an alcove, run under a sloped ceiling or wrap a corner without scribe strips on site. To price that properly we need the wall-to-wall and floor-to-ceiling dimensions of each opening, taken at a few points rather than one, plus the position of skirting, architraves, switches, radiators and any services running through the wall. If the room is being plastered or re-flooring after measurement, tell us the finished line you are building to — that single note removes most of the on-site adjustments later.

Say which two tones, and where each one sits

"Two tone" describes a combination, not a colour. A useful quote request states the door face colour and sheen, the carcass colour and sheen, and whether the interior matches the exterior or is kept in a plain light tone. Lacquer is where this matters most: the same colour at matte and at high gloss behaves differently under bedroom lighting, and it also sits differently against High Gloss Lacquer Wardrobes or Matte Lacquer Wardrobes elsewhere in the same property. If you are matching an existing finish, send a reference sample or a paint code and note the substrate it was applied to; a colour chip on paper and the same colour sprayed over panel edges do not always read the same once installed.

Specify the door system before you specify the interior

The door system decides the clearance in front of the unit and often the internal layout too. Hinged doors need a swing path; sliding doors save that space but limit how wide an opening you can reach into at once; a walk-in arrangement changes the whole geometry again. Tell us which you are planning — for example Two Tone Hinged Wardrobes or Two Tone Sliding Door Wardrobes — and give the distance from the wardrobe face to the opposite wall. That one measurement decides whether a bed can be walked around, whether an en-suite door still clears, and whether a mirror panel is workable on the door face.

Send the internal layout as a room-by-room list

Interiors are where two quote requests for identical external dimensions end up at different prices. Rather than writing "lots of shelves", list what has to be stored: hanging lengths for long garments, drawer counts, shelf heights for folded stacks, space for a vacuum or an ironing board, and whether lighting inside the carcass is wanted. If some storage belongs outside the bedroom — a linen bay, a utility tall unit, an under-stair store — send it with the same request so the joinery is specified as one set of matching runs instead of several unrelated orders.

  • Hanging: single or double hang, and the length of the long-garment bay
  • Drawers: number, whether internal or external, and any soft-close requirement
  • Shelves: fixed or adjustable, and what depth of item sits on them
  • Open sections: display niches or glass-fronted bays, if the bedroom scheme uses them
  • Integrated lighting: sensor type and where the cable can be routed

Give us the project context in writing

Quantity, delivery location and programme shape the quotation more than most buyers expect. A single villa wardrobe and a bedroom-floor replication on a residential development are made to different documentation standards, and matching joinery across units is a production-planning question rather than a discount question. Our Custom & OEM Service covers bespoke finishes and textures alongside OEM manufacturing with flexible minimum order quantities, so trade and developer enquiries should state unit counts and any phasing. For freight we handle sea, air and rail forwarding, packaging and container loading, customs paperwork and door-to-door delivery; the destination port or site address and your preferred Incoterms let us quote landed cost rather than ex-works only.

What we ask for Why it changes the price
Measured openings and finished floor levels Determines panel sizes, scribing and whether corner or angled units are needed
Door face and carcass colours with sheen level Lacquer coats, colour matching and gloss level drive the finishing cost
Door system and room clearance Hardware set, panel weights and safe access all follow from this
Internal layout list per unit Drawer stacks, hanging rails, glass panels and lighting are priced as items, not lump sums
Quantity, destination and programme dates Batch planning, container loading and freight mode all depend on these

What you get back from us

Once the above is in hand, we work through design consultation and space planning, material selection and product specification, then manufacturing with quality control before shipment — the sequence set out on our One-stop Solution page. You receive an itemised quotation tied to the layout you sent, drawings for sign-off, and a production schedule you can plan the rest of the fit-out around. If your project also needs built-in furniture beyond the bedroom — media walls, vanity units, kitchen cabinetry — sending those drawings in the same enquiry usually produces a more accurate total than three separate orders placed months apart.

Note on verification: confirm the finished dimensions, selected colours and hardware for each unit before production is released. Lacquer colour should be approved against a sprayed sample rather than a printed chip, and room dimensions should be re-checked once plastering and flooring are complete.

If you have drawings ready, send them with your measurements and destination; if you do not, start with photographs of the wall, the room dimensions and a list of what has to fit inside. Either way we can come back with a quotation that reflects the wardrobe you actually need rather than an approximation.