A parquet floor rarely fails because the oak is wrong. It fails because the drawing, the subfloor and the fixing method were never agreed in writing. If you are specifying European Oak Engineered Parquet Flooring for a villa or apartment handover, the quality of your enquiry pack decides how accurate the quotation is and how many revisions you go through after production starts. The list below is what we ask project buyers, contractors and designers to send us before a custom parquet order is priced.
1. The floor plan, not just the room name
Send the measured plan for every room that receives parquet: internal dimensions, the direction you want the planks or blocks laid, and where the runs start. Parquet is a pattern material, so the layout drawing changes the order quantity more than plain plank flooring does. Please mark door thresholds, column bases, fireplaces, fixed joinery and any room where the floor continues into a hallway, because those transitions decide whether we produce long boards or short modules.
Also state the total square metres per room plus a cutting allowance you are comfortable with. We quote to your figure; if you want us to calculate the quantity from the plan, say so in the enquiry and we will confirm our working before production.
2. Pattern, format and board size
Name the pattern explicitly. Our current European oak ranges cover straight plank layouts as well as geometric ones, for example European Oak Herringbone Engineered Wood Flooring and European Oak Parquet Engineered Wood Flooring. A herringbone block, a Versailles panel and a chevron are not interchangeable: each has its own module size, laying direction and waste profile.
For each space, give us the plank width and length or the block module you want, plus whether boards should be square-edged or micro-bevelled. If you have a reference photo from another project, attach it — but label it as inspiration, not as a specification.
3. Construction: wear layer and core
Tell us the traffic level of the space and how long you expect the floor to last, then we can match the build. The European oak products listed on our site use a 3mm solid oak top layer over a multilayer base, a construction chosen because the cross-piled layers resist movement better than a single lamella when humidity swings between seasons.
If your project needs a different wear-layer thickness or board format from what is published, send that as a custom request and we will confirm feasibility, tooling and price before any sample is cut. Never assume a thicker wear layer is available simply because the species is the same.
4. Colour, grade and finish
Colour language is where most misunderstandings begin. "Light oak" means something different to a designer in Sydney and a painter in Foshan. Send a target colour reference (a physical sample you already hold, or an RAL/NCS code), and state whether natural knots, mineral streaks and sapwood are acceptable or must be excluded. Our published descriptions range from light and bleached tones through honey, deep brown and smoked antique finishes, so grade selection has to be written down rather than inferred.
Specify the surface treatment as well: brushed or smooth, lacquered or hardwax oil, matte or satin sheen. For hospitality corridors and villas with heavy footfall, we recommend a factory-applied wear-resistant finish and will confirm which finishes are offered on the format you have chosen.
5. Subfloor, moisture and underfloor heating
This section prevents most site problems. Please report the subfloor type (screed, plywood deck, existing floor), its measured moisture content at the time of survey, its level tolerance, and whether underfloor heating is present and what maximum surface temperature it is set to. Some of our light-tone European oak parquet descriptions state compatibility with underfloor heating; where your system differs from what we publish, we check the build before confirming.
Tell us who prepares the subfloor and who installs. If your installer needs a specific adhesive, primer or acoustic underlay, name it in the enquiry so we can confirm compatibility with our board construction instead of discovering a conflict on site.
6. Samples, approval and sign-off
Before any production run, request physical samples of the exact pattern, colour and finish you have specified, laid out on site under the actual lighting. Ask us to quote sample cost and courier separately so approval does not delay the main order. Once a signed sample is returned with your project number, that reference becomes the standard we produce against.
7. Commercial and logistics details
Include destination city and port, Incoterms you want priced, target delivery date on site, and how many separate drops you need. Villa and apartment handovers often need flooring staged by floor or by unit rather than one bulk container; that changes packing, labelling and pallet configuration, so it belongs in the enquiry rather than in a later email. Our Logistics & Door-to-Door Delivery service covers freight arrangements and paperwork, but duties, local import conditions and site access should be confirmed for your specific destination.
If the parquet is part of a wider package — Custom Built-in Kitchen Cabinets, doors, wardrobes and vanities from the same fit-out — say so at the start. Ordering flooring together with joinery lets us match veneer tones and align production dates, which is where a one-stop solution earns its keep.
A short enquiry template you can copy
- Project name, address and contact; installation start date.
- Measured plan per room, laying direction, transitions and total m² plus allowance.
- Pattern (plank, herringbone, parquet panel), module or plank size, edge profile.
- Wear layer, core construction, board format for custom builds.
- Colour reference, knot and sapwood rules, brushing, sheen, finish type.
- Subfloor type, measured moisture content, level tolerance, underfloor heating details.
- Adhesive, primer or underlay your installer intends to use.
- Sample request, destination port, Incoterms, number of delivery drops.
Send those seven items and a manufacturer can reply with a firm quotation, an honest lead time and a production standard your site team can check on arrival. Send only "oak parquet, 120m²" and you will get a guess — one that usually gets corrected after the containers are already booked.
Working on a villa or apartment handover? Contact SANTERSON with your plans and target finish, and we will quote the parquet build, samples and delivery arrangement for your project.