An outdoor swim spa rarely fails on the water side. It fails on the coordination around it: a shell that arrives after the deck, a heat pump ordered at the wrong capacity, or a power feed sized for the standard unit when the site needs the longer variant. The Outdoor Swim Spa WS-S06CT-L is a configurable model, so the bill of materials is yours to define. This guide walks through how we build that bill for a villa pool deck or a small resort block: what belongs on the quantity sheet, which items follow the model rather than the room count, and where coordination between product lines usually breaks down.
Start with the base unit, then separate standard from optional
The catalogue specification for this model gives a shell of 6670 × 2380 × 1400 mm, with one control system, one swim training system, one water pump, one filter pump, 31 jets, four LED lights and a total power figure of 8.35 kW. Treat those numbers as the reference point for your quantity sheet rather than as a fixed delivery list. Before any order is raised we confirm two things: which equipment is included in the selected configuration, and what electrical supply the site can provide.
Once that baseline is agreed, split the remaining items into three groups on your own sheet — one column for each:
- Per-unit essentials: control system, pumps, jets and lighting as configured. Quantities here follow the model, not the room count.
- Site-dependent options: heat pump sizing, insulation, steps, sand filtration and UV sterilization. These depend on climate, water volume and maintenance routine, so the quantity is per unit but the specification is per project.
- Civil and trade items you supply locally: foundation or plinth, access route, power feed, drainage and any enclosure. These do not appear on the spa packing list, which is why they get missed.
Optional accessories in this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs written confirmation against the specific unit it attaches to, rather than a generic line on a purchase order.
Build the quantity sheet in one pass, not three
For a single-unit installation the arithmetic is simple. It stops being simple once a project has two or more units, because every repeated unit also repeats its electrical load, its delivery window and its commissioning visit. For a multi-unit order we list each unit on its own row with four fields: model code, dimension variant, selected options, required-on-site date. A swim-spa block at a resort is rarely uniform — one unit may sit indoors against a wall, another exposed on a terrace.
Two checks are worth doing at this stage rather than after the deposit:
- Footprint versus access. A shell of 6670 mm length has to reach the pad. Compare the delivery route, gate width and turning space against the assembled dimensions, not against the plan drawing.
- Cumulative power. At 8.35 kW per unit, two or three units on one distribution board changes what the electrical contractor has to design. Give them the total connected load early.
If a longer or shorter shell suits the deck better, the same range includes closely related configurations such as Outdoor Swim Spa WS-S06CT, so compare dimensions before locking quantities. Where the space is irregular — a courtyard, a rooftop terrace, an existing pool surround — a bespoke shell shape may be the cleaner answer; see our Customizable Shape Outdoor Spa for square, round, oval and curved configurations.
Coordinate the spa with the rest of the outdoor package
A swim spa is used as part of a terrace, not on its own. Loungers, shade and storage are specified around it, and if those items come from different suppliers with different lead times, the spa sits installed while the deck stays unfinished. We handle outdoor furniture for villas and resorts in the same production and shipping cycle as the water features, so one delivery window covers both.
Material matching is the second coordination task. Frame finishes, slat colours and upholstery fabrics read differently under pool lighting than they do in a sample book. Where the spa cabinet, the Aluminum Sling Sun Lounger Collection and any pergola or daybed need to sit in one visual scheme, request the finishes together and check them side by side before production starts.
On a full villa or small hospitality project the same logic extends indoors. Grouping bathroom sanitary fixtures, flooring, wall finishes and joinery into one procurement package means one set of drawings governs everything, and site levels, waterproofing and service points are resolved once instead of per trade. Our turnkey solutions cover that scope from design through handover.
Sequence the order so one stage does not wait on another
A workable sequence for a swim-spa project looks like this:
- Confirm the site condition: pad level and load path, access route, power availability, and whether the unit is indoor or outdoor.
- Fix the model and dimension variant against those conditions, then list options per unit.
- Issue one quantity sheet covering spa, options and the matching outdoor furniture, with a single required-on-site date.
- Confirm electrical and plumbing arrangements on both sides before production begins — an unconfirmed supply specification is the most expensive source of delay.
- Ship together where possible. Freight by sea, air or rail with door-to-door delivery keeps customs paperwork and arrival dates under one plan; see logistics and door-to-door delivery.
- Book commissioning and inspection while the goods are in transit, not after. Installation and after-sales support covers inspection, snag lists and spare parts.
What to send us when you request a quotation
A quotation for this model comes back accurate when it carries the following: site photographs or a marked-up plan showing the pad and access route; the number of units and any variant differences between them; your option list per unit; the available electrical supply; and the required-on-site date. With those details the quantity sheet and the specification are settled in one exchange instead of five.
SANTERSON has been manufacturing furniture and building materials since 2008, and swim spas are one part of a wider catalogue spanning outdoor furniture, sanitary fixtures, wall and ceiling finishes, flooring and joinery. If your project needs the spa coordinated with the rest of the build rather than ordered as an isolated purchase, send us the drawings and quantities and we will price it as one package.
Figures quoted above are catalogue values for the referenced model. Confirm included equipment, option compatibility and electrical requirements for your selected configuration before ordering.