Guest rooms, service corridors and staff areas all compete for the same few square metres in a hotel fit-out, and the laundry corner is usually the last item on the drawing list. Choosing stacked laundry units early means the cabinetry follows the room instead of the room being trimmed around equipment bought off a shelf. This guide covers what to check before you specify, how to keep the whole floor consistent, and where the coordination work usually goes wrong.

Start with the stack, not the cabinet

A stacked arrangement only works if the machines above and below are compatible as a pair. Before you draw the joinery, confirm three things about the appliances themselves: whether the dryer is vented or condenser, which side the door opens on, and how the manufacturer says the two units may be joined. Vented dryers need a duct route to an external wall or a riser, and that route decides where the unit can sit in the plan. A condenser model gives you more freedom because it needs power and a drain rather than a duct.

Door handing matters more than most project teams expect. In a narrow corridor alcove, a left-hinging machine facing a right-hinging one can leave no usable standing space. Fix the handing on the appliance schedule first, then let the cabinet doors open around it. Access panels should face the side someone will actually stand on when a machine needs servicing.

Measure the room as built, not as drawn

Tiled finishes, waterproofing, rendered walls and insulated service shafts all eat into the dimensions on a drawing. Take field measurements at floor level, mid-height and ceiling level, because renovated buildings rarely give you the same number twice. Then check the vertical services: soil stacks, water risers, electrical boards and air-conditioning drains that sit behind the wall the unit is planned against.

Our stacked laundry units are made to measure, so the carcass is built to the opening you send us rather than to a standard module. That flexibility only pays off if the dimensions you send are taken after the wet trades have finished and the floor finish height is confirmed. Where the room changes between order and handover, tell us before production starts.

Plan the storage around the wash cycle

A laundry corner that only holds two machines fails in daily use. Working from the cycle makes the layout obvious: soiled items arrive at one end, clean linen leaves from the other, and detergent, spare linens and cleaning supplies need a home between loads.

  • A hamper section at reachable height, so staff or residents are not carrying baskets across the room.
  • Shelving above or beside the stack for detergent and supplies, kept clear of the machine access panel.
  • Deep storage for spare linen, sized to the bed sets actually used on the floor.
  • A closed section for anything you would rather not see in a guest-facing corridor.

If the same room also has to carry household or linen storage, a laundry and storage combo does that in one run of joinery instead of two separate pieces fighting for wall space. Where the room is too shallow for a full stack enclosure, compact laundry solutions keep the footprint smaller and free up circulation.

Match finishes to housekeeping, not just to the mood board

A laundry unit in a hotel is cleaned daily with strong products, and it sits in a room where humidity rises every time a machine runs. Specify surfaces that wipe clean without marking, edges that will not lift at the seams, and hardware that survives being pulled with wet hands. Dark floors show lint; pale doors show scuffs. Choose the trade-off deliberately rather than by default.

Then match the carcass to the rest of the floor. Wardrobes, vanities, tall cabinets and laundry units specified from one finish list look like one building instead of several purchases assembled later. Our custom minimalist bedroom wardrobes are made to measure in the same way as the laundry joinery, with sizes, internal layouts, door styles and surface finishes set per project, so a back-of-house unit can carry the same panel colour and handle detail as the guest room cabinetry at the end of the corridor.

Coordinate the wet and electrical work before production

The most expensive mistakes in this part of the job are not cabinet errors. They are a tap left on the wrong side, a socket behind the machine with no room for its connector, or a drain run that cannot fall correctly to the stack. Before we build anything, the services should be positioned against the confirmed unit drawing: supply and waste locations, isolator positions, and the path any dryer duct will take.

Where the laundry corner sits inside a bathroom wall line, coordinate it with the rest of the bathroom sanitary fixtures schedule at the same time. Vanities, tall cabinets, mirror cabinets and laundry units all share the same walls, the same floor levels and the same trades, so specifying them in one pass avoids two different teams cutting into the same surface.

Order by room type, not by whole-building quantity

A single line item covering every laundry corner in the building almost always hides differences that appear on site. Group the order by room type and record each group separately: room width and depth, machine pair and handing, vented or condenser dryer, door swing direction, hamper side, storage configuration, panel colour and hardware. That schedule is what lets us produce made-to-measure units in one production run and lets your site team check deliveries against a drawing they can actually read.

Sample one room type first. A mock-up reveals door clashes, service access problems and finish mismatches while changes are still cheap, and it gives the client something physical to sign off before the remainder is manufactured.

What to send with your enquiry

  • Room dimensions taken on site after finishes, plus the floor finish height.
  • The appliance pair you intend to use, with door handing and venting method.
  • Service locations: water supply, waste, isolators and any duct route.
  • Storage requirements per room type, including linen volumes.
  • Panel colour and hardware references from the wider joinery schedule.

Send those details and we can return a unit designed for the room rather than an approximation of one. Because the work is made to measure, dimensions, layout, materials and finishes are confirmed with you before production begins, so what arrives on site matches what your drawing shows.

Stacked laundry units are a small part of a hotel fit-out and a large part of how the building runs afterwards. Settle the machines first, then the services, then the joinery, and specify them alongside the rest of the floor's cabinetry so the finished building reads as one design.