A 7-metre swim spa is not something you can correct on site. Once the acrylic shell is formed, the cabinet is framed and the equipment bay is wired, changes become rework or a machine that does not fit the deck it was bought for. That is why the confirmation stage matters more than the order itself. Below is the checklist we work through with buyers before Outdoor Swim Spa WS-S07M goes into production.

1. The shell, the footprint and the access route

The catalogue entry for this model lists 7000 × 2200 × 1480 mm. Treat that as the starting reference, not as a site measurement. Before production we ask for:

  • the internal length and water depth you actually want, since swim length and seating depth pull in different directions;
  • the finished external dimensions after cladding, steps and any handrail are added;
  • the delivery route — gate width, turning radius, crane or crane-free lift, and whether the unit travels as one piece or in sections;
  • the structural support under the footprint, including point loads when the shell is full.

If the spa sits on a terrace or a first-floor deck, send the framing drawing with the order rather than after it. Structural questions raised late are the most expensive ones to close.

2. Water features: what is included and what is optional

The specification shown for WS-S07M lists water jets, LED lighting, ozone, a waterfall and four water columns, with 40 jets in total, two pumps dedicated to the water features and one filter pump. Not every feature shown on a product page belongs in your configuration, and not every option is compatible with every shell. Confirm in writing:

  • which jets are fitted, where they sit relative to seating and the swim lane, and which ones you want removed or added;
  • whether the waterfall and water columns are wanted at all — they change pump count, power draw and the equipment bay layout;
  • the control system arrangement and how many zones it operates;
  • sanitation choice: ozone as standard, with UV sterilisation listed among catalog options.

A swim training system is not listed in the captured specification for this model. If you want continuous swimming against a current, say so at the confirmation stage so we can tell you plainly whether it fits this shell or whether another model in the range does it better.

3. Power, heating and insulation

Total power for the catalogued configuration is 10.75 kW. That single number decides several things at once, so we confirm each of them before production:

  • supply voltage and phase at the site, and whether an electrician has sized the circuit, breaker and cable run to match;
  • the heat pump option — size, and whether it runs on the same supply or needs a separate one;
  • insulation package for the shell and cabinet, which matters far more in cool nights and winter use than in mild climates;
  • where the equipment bay is placed, how it is reached for service, and how noise is kept away from bedrooms and neighbours.

Send a photograph of the switchboard and the intended power run with your confirmation. It saves one round of questions and prevents an electrician discovering the wrong cable on installation day.

4. Finish, surround and how it joins the rest of the exterior

A swim spa reads as part of the terrace, not as a separate object. We match cabinet cladding, step material and edge detail to the surrounding deck, pergola and outdoor furniture so the finish does not clash. If your project already includes outdoor furniture or a hardtop structure from us, we align the material and colour references at the same time, which is easier than matching them later. The wider swimming pool and swim spa range also covers shorter and longer shells, so if the 7-metre length turns out to be too much for the site, a closer sibling model can be quoted against the same detail drawings.

5. Documentation before the shell is formed

Production starts when three documents are agreed: dimensioned drawings showing the finished unit and equipment bay, an equipment list naming every pump, jet, light and control item in your configuration, and a delivery plan stating how the unit reaches its final position. Everything else — custom and OEM requirements, packaging, container loading and door-to-door arrangements — is settled around those three.

Our service runs from design consultation through production, logistics and installation support, so the same team that confirmed your equipment list also follows the shipment and the handover. Details of that workflow are on the services page.

Before you sign off

Send us the site photographs, the deck or slab drawing, the switchboard details and a marked-up list of the features you want kept. We return dimensioned drawings and an itemised equipment list for your approval, and production begins only after that approval. If you are comparing this model with another length in the range, ask for both quotations against the same feature list — that is the only fair way to compare a swim spa.

Figures quoted above are the catalogued values for the configuration shown on the product page; confirm the specification of your own configuration before ordering.