Built-in shelving is one of the few elements in a villa or hospitality fit-out that has to be right before the first wall is closed up. A metal-frame modular system is fixed to the structure, carries services behind it and sets the geometry for everything around it. This guide walks procurement teams through the information worth putting into a project brief when specifying Santerson Metal Frame Modular Systems, so quotations, shop drawings and site preparation line up from the start.

What the product actually covers

Santerson Metal Frame Modular Systems sits in the Modular Shelving Systems collection. The published description is deliberately open: it is a configurable metal-frame shelving system for residential wall-system projects, where layout, dimensions, material and finish are specified to suit each space, with made-to-measure sizing. In other words, you are buying a coordinated system built around your drawings rather than a fixed catalogue item.

Two practical consequences follow. First, the brief has to carry dimensional and finish information, because there is no single standard size to default to. Second, comparison between suppliers should be made on configuration and scope, not on a headline unit price — two quotations for "the same" wall can differ widely depending on what each one includes.

Scope definition: where the modular system stops

Most disputes on joinery packages come from scope boundaries that nobody wrote down. State clearly in the brief which of these the metal-frame package carries and which sit with other trades:

  • Frame, shelves and fixings supplied by the modular system, versus backing, blocking or structural support provided by the builder.
  • Adjacent cabinetry — wardrobes, media walls or kitchen units that abut the shelving and must align in finish and module depth.
  • Integrated lighting, power and data runs behind or within the frame, including who supplies the drivers and who terminates the cables on site.
  • Wall finishes that meet the frame: plaster, timber panelling or stone returns, and the expected tolerance at that junction.

A short scope table attached to the enquiry, with a "supplier / builder / not in scope" column for each line, removes most of the back-and-forth later.

Dimensions and tolerances to state in the brief

Because sizing is made to measure, the brief should give finished dimensions rather than rough openings. For every wall run, record:

  • Finished floor-to-soffit height at the high point and the low point, not a single nominal figure — slab and ceiling levels vary along a run.
  • Clear width of the wall, plus the position of any column, skirting, architrave or door reveal that interrupts it.
  • Required shelf depth and clear opening heights for the items being stored: books, display pieces, glassware and equipment all need different spacing.
  • Setting-out dimensions from two fixed reference points on site, so the shop drawing can be checked against reality before production.

Where a design intent drawing exists, attach it — but ask for setting-out dimensions to be taken from site. Design-stage drawings and as-built conditions rarely agree exactly, and catching that gap before manufacturing is far cheaper than resolving it on site.

Frame, shelf and finish selection

The system lists material and finish options rather than one fixed specification, so the brief should name what each space needs. Worth pinning down:

  • Frame profile and colour, and whether the frame should read as a visible design feature or stay visually quiet against the wall finish.
  • Shelf material and edge detail, and how it relates to the joinery palette used elsewhere in the project — matching a veneer or laminate already specified for wardrobes keeps the package coherent.
  • Surface treatment for the environment involved. A study or bedroom wall has different exposure from a bathroom or a wet area, and hardware choice follows that exposure.
  • Expected loading per shelf bay. The published listing does not fix load ratings, so intended loading belongs in the brief and the confirmed specification should be returned for approval.

If the same metal-frame language runs through other parts of the project — Santerson Metal Frame Shelves in bathrooms, or Santerson Floor to Ceiling Modular Systems in living areas — say so in the brief. Ordering these as one coordinated package keeps profiles, finishes and hardware consistent across rooms and reduces the number of separate submittals a consultant has to review.

Lighting and services coordination

Shelving with lighting built in needs its electrical decisions settled early. Santerson Integrated Lighting Systems, also part of the Modular Shelving Systems collection, covers integrated lighting within configurable shelving; where that is the intent, the brief should specify:

  • Light position per bay — shelf underside, vertical channel, or concealed cove — and the required colour temperature and dimming behaviour.
  • Driver location and access. Drivers need to sit behind a reachable cover, not be buried behind a fixed panel.
  • Switching and control interface, and whether the shelving circuit is shared with room lighting or runs separately.
  • Electrical specification and compatibility to be confirmed for the selected configuration, since these vary by option.

Ask for a services drawing showing cable routes and driver positions alongside the joinery drawing. Reviewing both together is how conflicts with studs, conduits or sprinkler lines get resolved on paper instead of on site.

How to structure the enquiry itself

SANTERSON works as a manufacturer and one-stop supplier covering design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales service. Structuring the brief around those stages means fewer re-work cycles once production starts. A practical structure:

  • Project summary: building type, room list, target programme dates and delivery location.
  • Package schedule: every shelving run by room, with setting-out dimensions, elevation reference and quantity.
  • Finish schedule: frame profile and colour, shelf material, edge treatment, and the finishes it must coordinate with elsewhere.
  • Services schedule: lighting positions, control method, driver access requirements.
  • Scope table: what the supplier carries versus the builder, as set out above.
  • Delivery and site conditions: delivery address, access constraints, storage available on site, and the installation window.

For enquiries covering several villas or repeated unit types — a housing development, for example — group identical configurations and state clearly which rooms repeat. Repeat modules are where made-to-measure work still delivers real efficiency, because one approved detail carries across multiple bays.

Reviewing quotations on the same basis

When quotations come back, compare them against a single checklist rather than against price alone:

  • Does each quotation confirm the same dimensions and finish codes, or has one substituted something to hit a number?
  • Is freight, packaging and duty included, and on which delivery terms? Landed cost is what matters for comparison.
  • What installation support is included, and what does the local builder still need to do?
  • Which items are stated as confirmed specifications versus options still to be settled?

Where a supplier's own pages give differing figures for matters such as factory area or export share, ask for the current numbers in writing instead of repeating them in your project documentation. The same discipline applies to lead times, warranty terms and response commitments: get them stated in the quotation for this project.

Before production: approval points that protect the programme

  • Shop drawings signed off against site-verified dimensions, with the setting-out references shown.
  • A physical finish sample of frame and shelf surface approved under the actual lighting condition of the room.
  • Services coordination drawing signed by both the joinery supplier and the electrical contractor.
  • Written confirmation of the final specification, including load capacity for the bays carrying heavier items.

Those four approvals are the practical difference between a shelving package that arrives ready to install and one that generates snags at handover. If you are assembling a brief for a villa or hospitality project, send the room schedule and finish intent to SANTERSON and request shop drawings plus a confirmed specification before committing to production.