Integrated lighting inside a cabinet looks simple on a specification sheet: a strip of light, a driver, a switch. In practice it is one of the few bathroom and joinery items where the product, the electrical work and the installer all sit in different hands. When something stops working two years after handover, the buyer needs to know who answers the call, who supplies the part and how the part reaches site. Before you place an order for Santerson Integrated Cabinet Lighting, here are the after-sales questions worth putting in writing.
1. What exactly is covered, and for how long
Our Installation & After-sales Support service covers on-site installation, inspection and snag rectification, warranty coverage, spare parts or replacement, and ongoing maintenance. Ask us to state, in the order confirmation, which of those apply to the lighting components themselves — the light source, the driver or transformer, the sensor or switch — and what the coverage period is for each. A light module and its driver usually carry different terms, and a warranty written against "the cabinet" may not read the same way as one written against "the lighting".
Get these in writing: the covered parts listed separately; the start date of the period (dispatch, delivery or handover); what voids the cover; and whether labour for access and removal is included or charged.
2. Which electrical specification was supplied, and is it on file
Integrated cabinet lighting is configured per project — finish, layout and dimensions are set to suit each space, and the electrical details follow from that configuration. Two identical-looking cabinets in a villa can carry different drivers because one feeds from a switched mirror circuit and the other from a separate socket behind the vanity. Request the as-built record for your order: input voltage, output voltage and wattage per run, driver model and maximum load, dimming method if any, and the IP rating for any fitting sitting in a splash zone. Keep that sheet with the project file.
Ask us to confirm compatibility between the driver, the dimmer or switch on your site, and the cable route shown on the cabinet drawing — before production, not after installation.
3. Are spare parts still available in three years
A discontinued light module is a real problem when the strip is rebated into a shelf or a wardrobe carcass; replacing it can mean removing joinery. Ask whether the light source and driver are standard items we hold stock of, or part-specific to your run. Where a fitting is project-specific, ask what the replacement path is: an identical module, a compatible substitute with the same cut-out, or a full section replacement. For larger orders, buying a small spare set at the same time as the main order is usually cheaper and simpler than sourcing it later.
Ask for the driver and module model numbers on the packing list, so site staff can quote them if a fault appears after handover.
4. Who installs, and who is responsible if installation causes the fault
Most cabinet lighting failures trace back to installation: an overloaded driver, a cut-and-rejoin in the wrong place, a sensor mounted against metal, or a cable crushed by a door hinge. Our service includes on-site installation and site coordination, but on many projects the local contractor connects the circuits. Decide before order confirmation where our responsibility ends and yours begins, and record it. If your electrician is doing the connection, ask us for a simple wiring and mounting diagram for that specific configuration so the local team is not guessing.
Agree who tests the lighting and when — ideally a powered test at the factory before crating, plus a documented test on site after fixing, signed off on the snag list.
5. How a fault is reported and how quickly it moves
Ask for one named contact for after-sales rather than a general inbox, and ask what evidence they need: photographs, the order number, the configuration sheet, a short video of the fault. That single question — "what do you need from me to start" — removes most of the delay in cross-border claims. Response times vary with the fault type and where the site is, so treat any stated turnaround as something to confirm for your project rather than assume.
Confirm whether replacement parts ship with the next consolidated container or as a separate parcel, and who handles customs paperwork for that small shipment.
6. How replacement parts travel and what they cost to land
Our Logistics & Door-to-Door Delivery service handles freight by sea, air and rail, along with the paperwork side of shipping. For a driver sent to a villa in Melbourne or a bathroom fit-out in Perth, the practical questions are different from those for a full container: which mode is used for a small parcel, who prepares the commercial invoice, whether duties and local delivery sit with us or with you, and what the realistic door-to-door window is. Ask these before ordering, so an after-sales part does not stall on an import form.
7. What happens when lighting is ordered together with cabinetry
Cabinet lighting rarely travels alone. A Santerson Floating Vanity, an LED Mirror Cabinet and a run of shelving with built-in lighting may all be on one purchase order, made by different workshops. Ask how after-sales is handled across that mix: one warranty claim covering the package, or separate claims per supplier line. Also ask whether the same contact handles a cabinet defect and a lighting fault, because split ownership is where small problems sit unresolved.
A short pre-order checklist
- Covered parts listed separately, with the coverage period and start date for each.
- As-built electrical sheet for your configuration: voltage, wattage, driver model, dimming method, IP rating where needed.
- Confirmation that driver, switch or dimmer and cable route are compatible with the site circuit.
- Spare-part availability stated for the light module and driver, plus a spare set on the same order where sensible.
- A written split of installation responsibility between our team and your contractor, with mounting and wiring diagrams.
- One named after-sales contact and the evidence they need to open a claim.
- Shipping mode, paperwork owner and landed cost for small replacement parcels.
- How claims work when lighting is bought together with vanities, mirror cabinets or shelving.
Integrated cabinet lighting is a small line item that fails loudly. Sorting out these seven points while the order is still being confirmed costs nothing; sorting them out after the tiles are on the wall costs a great deal. Send us your cabinet drawings and circuit notes, and we will confirm the lighting configuration and the after-sales terms in writing before production starts.