A bidet is one of the smallest fixtures in a bathroom specification and one of the easiest to get wrong. The Wall Hung Bidet 1004F, Modern Ceramic Wall Mount Bidet for Bathroom looks simple on a schedule: wall mounted, vitreous ceramic, rectangular with softened corners. What decides whether it lands correctly on site is a short list of checks — drainage type, rough-in dimension, fixing method, faucet supply, and how the fixture sits within the rest of the sanitary suite. This guide walks through those checks in the order a buyer or specifier normally meets them.

Start With What the Product Page Actually States

The published description for model 1004F gives four usable facts. It is made of solid vitreous ceramic with a smooth glossy glaze that resists stains and mineral deposits. It is wall-mounted and fixed with a back panel, which leaves the floor beneath it clear. Its outline is a rounded square rather than a sharp rectangle, so it reads softer in a small room. And its listed overall size is 545×360×410 mm.

Those points already answer part of a typical specification query. The floating look is not cosmetic only: the empty floor line under the bowl is what makes mopping and sanitising the bathroom floor straightforward, which is why wall-hung ceramics keep appearing in boutique hotel restrooms and villa bathrooms rather than only in showrooms.

The Specification Sheet to Request Before You Order

Marketing copy is a starting point, not a technical document. Before any quantity is confirmed — one bathroom or a whole floor of guest rooms — ask the supplier for the current technical data sheet and check these lines against your drawings.

  • Overall dimensions — confirm 545×360×410 mm against your clearances, especially the distance to the adjacent WC and to any vanity or shower screen.
  • Drainage type and rough-in — wall drain or floor drain, and the exact offset from the finished wall. This is where a ceramic fixture most often arrives on site and fails to fit.
  • Waste connection height — the waste must be set to the level your wall-hung arrangement expects, measured from finished floor level rather than structural slab.
  • Fixing detail — model 1004F is described as fixed with a back panel. Confirm what fixing hardware and support arrangement the sheet specifies for your wall build: masonry, timber stud, or steel stud with a concealed frame.
  • Faucet provision — tap hole position and number of holes, plus whether mixer taps and hoses are included or supplied separately.
  • Glaze and colour — confirm the glaze finish and colour code match the sample you approved, and that the same code applies across the suite you are ordering.
The dimensions shown on a product page are published figures for that model. Treat them as reference values until you hold the current technical sheet for the batch you are buying; sheets get revised, and a fixture ordered from an outdated PDF is a costly mistake.

Wall Hung or Floor Standing: Decide From the Wall, Not the Look

Both wall-hung and floor-standing ceramic bidets appear in the same catalogue, and the choice is a construction decision disguised as a style one. The table below compares the two arrangements using the descriptions published for the SANTERSON models.

ConsiderationWall Hung Bidet 1004FFloor Standing Bidet 1038F
Support structureFixed to the wall with a back panel; needs a wall that can carry the load and the correct support arrangement behind it.Freestanding body fixed to the wall at the back; less dependence on a fully reinforced wall zone.
Floor cleaningFloor under the bowl stays open, so mopping reaches the whole area.Base meets the floor, leaving a perimeter line to keep clean.
Visual effectFloating, light appearance; suits compact and contemporary bathrooms.Conventional, solid presence with an ergonomic curved body.
Suite pairing in the cataloguePart of the 1004 group, alongside Washdown One Piece Toilet 1004A and Wall Hung Ceramic Basin 1004B.Described as matching the 1038 series toilet, such as Wall Hung Toilet 1038W.
Typical useEuropean-style bathrooms, villas and boutique hotel restrooms.Home bathrooms, hotels and villa renovations where a floor-mounted layout is already set.

If the pipework and framing are already fixed for a floor drain and a back-to-wall pan, a floor-standing bidet is usually the lower-risk choice. If you are setting out a new bathroom and want that open floor line, plan the wall zone, support frame and waste before the ceramic is ordered.

Specifying a Bidet for Hotel and Villa Projects

For a project buyer, one bidet is really a line in a larger sanitary schedule. Three practical points carry most of the value.

  1. Order the suite together. Glaze colour, ceramic tone and profile radius vary between series more than buyers expect. Keeping bidet, WC and basins in one series keeps the bathroom consistent — the 1004 group covers wall-hung bidet, one-piece toilet and wall-hung basin, while the 1038 group covers its own matching set.
  2. Confirm quantities by room type. Guest bathrooms, master ensuites and public restrooms usually take different fixture sets. Locking the schedule by room type before production avoids mixing series mid-project.
  3. Put rough-in on the drawing, not in an email. The drainage type and offset for every bathroom should sit on the plumbing layout that both your site team and the factory work from. That single drawing prevents most ceramic-fixture failures.

SANTERSON supplies these fixtures as part of a wider furniture and building materials scope, so bidets, basins, vanities, lighting, cabinetry and flooring can be specified through one turnkey project programme rather than split between several vendors. The company's project services cover design consultation and space planning, material selection and product specification, manufacturing and quality control, then logistics, site coordination and handover — the stages a fixture passes through from schedule to installed.

Questions Worth Asking the Supplier in Writing

  • Which technical data sheet applies to this order, and what is its revision date?
  • What drainage arrangement does 1004F require — wall or floor waste, and what offset?
  • Is the support frame and fixing hardware included, or supplied by the local plumber?
  • Are faucet, hoses and waste set included with the bidet?
  • What packaging is used for ceramic freight, and how are breakages handled on arrival?
  • What spare-part availability applies to this series after handover?

Written answers to those six questions are worth more than any brochure. They settle the responsibility split between factory, freight and local trades before anyone is standing in a finished bathroom holding a bowl that does not fit.

To confirm dimensions, rough-in and current availability for the Wall Hung Bidet 1004F, or to price it as part of a wider sanitary package, contact SANTERSON through the contact page with your room schedule and plumbing layout.