A double vanity looks simple on a room schedule: one unit, two basins, one countertop. On site it becomes the point where joinery, stone, ceramics, plumbing, electrics and wall finishes all meet at once. That is why Santerson Double Vanity specifications need to be documented before production starts, not sorted out during installation. Below is the documentation set our project team works through with architects, builders and procurement officers on villa and hospitality bathroom packages.

What the product actually is

Santerson Double Vanity sits in the Vanities collection within our bathroom sanitary fixtures range. It is a configurable unit, not a fixed catalogue size: dimensions, materials, finishes and internal layout are made to measure for each project space. The same approach applies across the collection, including Santerson Floating Vanity and Santerson Integrated Countertop Vanity.

Because the size is set per project, the specification you send us matters more than a model number. Two identical bathroom plans can produce different vanities once basin type, wall construction and storage needs differ.

Practical point: on made-to-measure joinery, an undocumented dimension is not a small risk — it is a remake. The items below are fixed at order confirmation, which is why we recommend one consolidated specification sheet per bathroom type.

Item 1: Room dimensions and clearances

  • Finished wall-to-wall width at the vanity wall, plus ceiling height, both measured after final floor and wall finishes are accounted for.
  • Door swing, drawer pull-out and walkway clearances, so a full-height mirror cabinet or adjacent tall unit does not foul the door.
  • Clear distance from each basin centre to the side wall — this drives comfortable elbow room when two people use the vanity at once.
  • Set-back for taps and any deck-mounted accessories relative to the countertop edge and splashback.

Item 2: Wall structure and fixing method

State what is behind the finish lining: timber or steel studs, masonry, or a framed cavity with noggins. For a wall-hung design, record the load path, the position of reinforcement, and whether waste and supply pipes run inside the same cavity. A floating configuration changes both the fixing detail and the trap arrangement, so this belongs in the drawing set, not in an email thread.

Item 3: Basin type, tapware holes and countertop build-up

Confirm which basin style is used — undermount, vessel above counter, or an integrated top — and give the exact basin units so cut-outs, tap hole positions and overflow provisions match. For a paired layout we also confirm Santerson Double Basin Countertop details: countertop material, edge profile, thickness build-up and basin spacing.

Item 4: Storage layout per bathroom type

Record the internal configuration for each unit in a room-by-room schedule rather than assuming one layout fits every bathroom. Guest powder rooms, main family bathrooms and guest-room ensuites usually need different drawer stacks, shelf heights and provisions for tall storage such as Santerson Open Shelf Tall Cabinets.

Item 5: Lighting, mirror cabinets and electrical points

Mirror placement, vanity lighting and any mirror cabinet must be dimensioned together with the vanity so cables, isolators and switch plates land where the joinery expects them. We confirm these before production because an isolated electrical point relocated after tiling is expensive to correct.

Item 6: Finishes, hardware and matching joinery

Specify door profile, substrate, surface finish, colour reference, edge treatment and hardware for each unit. Where vanities are ordered alongside kitchen cabinets and other built-in joinery, record the shared finish references so tones match across rooms instead of being matched by eye on site.

Item 7: Site conditions, delivery stage and inspection

  • Delivery stage agreed in writing: whether units arrive before or after wall and floor finishes, and where they are stored on site.
  • Access route, lift or stair dimensions and any size limit for the longest unit in the batch.
  • A snag and acceptance record at handover, covering alignment, door and drawer adjustment, seals and finish condition.

Our installation and after-sales support covers on-site fitting support, inspection and snag lists, spare parts and replacement. Response-time and warranty terms vary by project and configuration, so the applicable terms are confirmed in your quotation rather than assumed from website copy.

Item 8: The commercial record

Keep one document trail for the batch: order confirmation with the approved specification drawings, packing list per unit and per room, shipping documents, and a written change log. Every revision to size, finish or basin choice should be dated and reconfirmed before it reaches production.

How we support this as one package

Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. Bathroom joinery is coordinated with the rest of the fit-out through our turnkey interior project solutions, from space planning and material selection through production, quality control and site coordination. Where a project needs non-standard sizes, profiles or finishes, our custom and OEM service covers bespoke design, prototyping, material and finish choices and private labelling.

Freight is arranged by sea, air or rail with customs paperwork, packing and container loading coordinated for the whole order — see logistics and door-to-door delivery. Import terms, duties and transit arrangements are confirmed per destination. Published villa projects in Willoughby, Perth, North Turramurra, Melbourne and Sydney show the kind of residential work we coordinate; scope details for each case are available on request.

Before you send the enquiry

Send the bathroom layout drawings, the room schedule with quantities per unit type, your preferred basin and tapware selections, and the finish references you want matched. With those inputs our interior design services team returns a specification drawing for each vanity, including double-sink layouts, so your project team approves dimensions once instead of chasing corrections during installation.

Start with the Vanities collection page, or send your drawings through our contact page for a specification review.