A door schedule that lists only widths and heights is one of the quickest ways to end up with joinery that arrives on site and does not hang cleanly, does not close against the floor covering, or does not sit flush with the wall panel systems beside it. Interior hinged doors look like the simplest line in a fit-out bill of quantities, yet they sit at the junction of structure, floor build-up, ironmongery and finish selection — which is exactly where coordination errors appear.
This guide sets out what we need from a project team to specify Standard Interior Hinged Doors for villas, hotels and offices: the measurements that have to be taken on site rather than read off a drawing, the project inputs that decide the make-up of the leaf and frame, and the checks that keep the order consistent from production through to handover.
Our interior hinged doors are made to measure, with material and finish options and a layout tailored to each project. That flexibility is useful only when the information reaching the factory is complete, so dimensions and selected specifications are confirmed for every opening before production starts.
Measurements that must come from site conditions
Drawings show design intent. Doors are made for the opening that actually exists, after the wet trades, floor build-up and wall finishes are complete. These are the figures we ask for on every opening.
| Input | What to record | Why it matters |
|---|---|---|
| Opening width | Width at the top, middle and bottom of the structural opening; note the smallest figure and any variation across the opening | An out-of-square or plastered-over opening changes the frame size and how the leaf sits in the reveal |
| Opening height | Height at the left, centre and right, measured from finished floor level where that level exists | Floor build-up added after the drawing is issued reduces clear height under the leaf |
| Wall thickness / reveal depth | Completed wall build-up at each side of the opening, including plaster, cladding or panelling | Sets frame depth so the architrave and any adjacent textured wall panels sit flush |
| Floor finish and threshold | Final floor covering, its thickness, and whether a threshold or continuous sill is required at the opening | Determines clearance under the leaf and any ventilation gap at the base of the door |
| Clear opening required | Minimum clear width the leaf must leave when open, plus the swing direction and which face the hinges sit on | Affects leaf size, frame position and furniture layout in a compact room |
| Leaf count and configuration | Single or paired leaves, and any fixed panel above or beside the opening | Paired and combined openings need their own frames and junction details |
| Head height and ceiling line | Distance from finished floor to soffit or ceiling, and whether the door head meets a panel system or a plain finish | Tall openings and full-height designs are made to measured clear height rather than a catalogue module |
| Adjacent services and fixings | Position of skirting, trunking, wall switches, door stops and wall-mounted items near the opening | Prevents handles, stops and ironmongery colliding with finishes already set out on site |
| Room-by-room identification | Every opening tagged to a room or zone number that matches the rest of the joinery schedule | A door order for a multi-unit project is only traceable if each opening carries a unique reference |
Project inputs that shape the specification
Alongside dimensions, the following decisions come from the design team or the client brief. Each one changes what we produce and how it is quoted.
- Project type and duty level. A private villa, a hotel guest room and a busy office corridor place different demands on leaf construction, ironmongery grade and surface wear. State the use of each space rather than assuming one specification covers the whole building.
- Leaf style and panel detail. Flat slab, single or multiple panels, glazed or solid — the interior door range includes quiet, plain faces as well as decorative interior doors, so confirm whether the design calls for a flush face or a patterned one.
- Flush detailing. Where the brief asks for a door that reads as part of the wall, we need to know this early. Flush and concealed designs in the range — such as flush hinged doors and flush interior doors — affect frame type, wall build-up and the finishing sequence, and must be resolved before surrounding panelling is fixed.
- Material and finish. Veneered and solid-timber options can be coordinated with cabinetry elsewhere in the project; painted and laminated faces are specified by colour and sheen. Send finish samples or reference the joinery schedule where doors must match wood veneer hinged doors, wardrobes or built-in units in the same room.
- Ironmongery assumptions. Hinges, handles, lock bodies, closers and door stops — including who supplies them and their cut-out positions. Ironmongery is a common source of rework when it is settled after the leaves are machined.
- Acoustic and privacy expectations. Where a room needs to limit sound transfer between spaces, say so at specification stage; construction, seals and detailing follow from that requirement rather than being added afterwards. Related acoustic panels can be coordinated in the same package.
- Quantities by type. How many openings share each size and finish. Grouped quantities support production planning and make unusual one-off sizes easy to identify in a schedule.
- Delivery address, phasing and site access. Which opening groups are needed first, the delivery point, container or pallet arrangements, and any lift or stair constraints for moving long leaves into the building.
How the information moves through the order
Once the measurements and inputs above are gathered in one document, the sequence is straightforward and mirrors how we handle other built-in work on villa and hospitality projects.
- Schedule review. We check each opening for missing dimensions, conflicting swing directions and sizes that sit outside normal proportions, then return a list of questions rather than filling gaps with assumptions.
- Made-to-measure sizing and configuration. Leaf sizes, frame depths and layouts are set to the measured openings, with the selected material and finish recorded against every reference.
- Confirmation before production. Dimensions and selected specifications for each project are confirmed with you in writing. This is the point at which changes are inexpensive; after it, they rarely are.
- Production and quality control. Doors, frames and architraves for one opening are produced and packed as a set, labelled with the room reference from your schedule.
- Logistics and handover. Freight arrangements, packaging and container loading follow the project plan, with on-site support covering inspection and snags at installation. See our services for how design, custom/OEM work, logistics and after-sales support fit together.
Three checks before you send the schedule
- Measure after plaster, screed and floor build-up are complete — or state clearly which levels are still provisional.
- Give every opening a unique reference that matches your joinery and finishes schedules.
- List the ironmongery for each door type, including who supplies it, before machining is confirmed.
Where hinged doors are not the right answer
Send us the plan view of the room, not only the opening. Where furniture or circulation blocks a swing arc, sliding, pocket and folding options in the same finish range keep the appearance consistent while freeing up floor area — wooden sliding doors, wood veneer pocket doors and classic folding doors are specified with the same measurement discipline. For wide openings that need to open fully, paired hinged leaves or slim-frame modern slim frame French doors may suit better than a single oversized leaf.
Getting an accurate quotation
A complete enquiry for interior hinged doors contains the measured schedule, the finish references, the ironmongery list and the delivery plan. With those four items we can price the package accurately and flag anything unusual before production is committed. As a one-stop furniture and building materials supplier, SANTERSON produces doors as part of a wider fit-out package alongside cabinetry, panelling, vanities and lighting, so one schedule can cover finishes that have to match each other on site.
Send us your door schedule. Share the opening dimensions, room references, finish selections and quantities, and we will return a made-to-measure specification for your review before anything enters production.
Contact: santerson@qq.com · Phone/WhatsApp: +86-13928214007 (PHILLIP) · Enquiry form: santerson.com/contact
Product dimensions, material and finish availability, ironmongery compatibility and delivery arrangements are confirmed for each project; figures on drawings are treated as provisional until the site schedule is agreed.