A quotation for a built-in media wall can look complete on the surface: a product name, a price, a picture. For a Santerson Storage & Display Combo, that is exactly where problems start. The listing sits in the Media & TV Walls collection and is described as a configurable combination of storage and display, with finish, layout and dimensions specified to suit each space. Because nothing about the unit is fixed, two quotations carrying the same product name can describe two very different pieces of furniture. Work through the checks below and make sure every point appears in writing before you sign.

1. The dimension sheet, not the dimension line

Configurable wall systems in the Media & TV Walls collection are built to project-specific dimensions. A quote that states a single overall width and height tells you almost nothing about how the unit will sit in your room. Ask for a scaled elevation drawing that shows overall width, height and depth, plus the split between open display niches and closed storage, and where the television aperture sits relative to the finished floor.

Then check that drawing against your own site survey. Ceiling heights in refurbished villas rarely run level from one end of a wall to the other, and a full-height unit only works if the out-of-level allowance is stated on the quote — whether the fitter will scribe and pack on site, or whether the carcass is being cut to suit at the factory.

2. The material call-out, panel by panel

"Melamine board" is not a specification. For any storage and display combination, the quote should name the substrate and the surface separately for each visible part: cabinet carcass, door fronts, open shelf panels, the TV recess surround and any internal fittings. The Media & TV Walls collection is listed with finish, layout and dimensions specified per project; check that the surface you are buying — melamine, lacquer, acrylic, veneer or a glass front — is named for every part. Those finishes behave very differently around a warm television and against a lit display niche.

Also check that the edge banding is included and matched, and ask which face of the panel is finished where the unit meets a wall. A visible return edge quoted as "unfinished" is a site problem you will pay for twice.

3. Hardware, load ratings and door behaviour

Display shelving fails quietly when it is loaded with books, ceramics and glassware. The quote should state shelf span, the thickness of the shelf panel at that span, and whether a support rail or concealed bracket is included. For doors, confirm the opening method — hinged, sliding, pocket or lift-up — the hinge and runner brand or grade, and whether soft close is standard or an extra line item. If you want a handleless look, say so on the request, because profile handles and recessed pulls are priced differently.

4. Lighting and electrical provisions

Integrated lighting is where a display unit either looks intentional or looks like an afterthought. If your quote includes LED strips or lit niches, it should list the fitting type, the driver location and access, the cable runs, and who supplies the electrician's first fix. Drivers hidden inside a closed cabinet need an access point; if that is not drawn, nobody has thought about it yet.

Even where lighting is excluded from the quote, ask for the TV power and data positions to be shown on the drawing. A media wall built around assumed cable locations is a frequent cause of rework on site.

5. Scope boundary: what travels and what does not

Read the exclusions as carefully as the inclusions. For a project order, the practical questions are whether measurement, packing, freight, insurance, unloading and installation are inside the price or outside it, and at which point responsibility for damage passes to you. The site's logistics and door-to-door delivery service is described as covering freight forwarding, export paperwork and container loading, but the Incoterm written into your quotation decides where your cost risk begins. Confirm it in writing rather than assuming the price is delivered.

6. Finishes: sample first, then reference

Never approve a colour from a screen or from a photograph of another project. Ask for a physical sample of the exact panel — surface and edge — before production starts, and once it is approved, have the quote reference that sample by code and date. This single step removes most colour disputes on veneer, lacquer and high-gloss fronts.

Reading the quotation line by line

Line itemWeak quote wordingWording you can act on
DimensionsOverall size stated in text onlySigned elevation drawing with aperture positions and out-of-level method
Materials"Board with finish"Substrate and surface named per component, edge banding included
Hardware"Quality hinges and runners"Type, grade, soft-close status, load rating for open shelving
ElectricalNot mentionedFittings listed, driver access shown, first-fix responsibility named
Delivery"Price ex works" buried in notesIncoterm, insurance split and unloading responsibility stated up front
FinishesColour name onlyApproved physical sample referenced by code and approval date

Where this fits in a whole-room package

A storage and display combination is rarely ordered alone. In villa and apartment work it usually sits alongside tall cabinets, full height media walls for the main living space, and integrated lighting that has to match across rooms. Ordering these together from one turnkey project supplier keeps panel thickness, finish codes and hardware consistent — and it means one drawing set to coordinate instead of three.

If the same manufacturer also produces your kitchen cabinetry and wardrobes, ask them to issue a single finish schedule for the whole dwelling. Veneer matched across a media wall and a wardrobe line is a good reason to consolidate orders; separately sourced units in "similar" oak are how matching problems get made.

Before you sign: ask the supplier to restate, in one page, the dimension drawing reference, the per-component material call-out, the hardware schedule, the electrical scope and the Incoterm. If any of those five cannot be put on one page, the quotation is not finished yet.

Questions worth putting to the supplier

Can the unit be built in sections for a narrow stair or lift?

For full-height systems going to an upper floor, confirm the maximum single-piece size and how the unit is jointed on site. A visible joint in the wrong place changes the whole look.

What happens if my wall is not square?

Ask which method is quoted: a factory-cut scribe, an on-site trim, or a filler panel finished to match. Each has a different cost and a different finish result.

How are internal fittings specified?

Drawers, adjustable shelves, cable ports and any display lighting inside the closed section should each appear as a priced line, not as "as required".

Send your drawings to SANTERSON and the quotation can be returned answering these points item by item, with a physical finish sample approved before production is scheduled. Enquiries go through the contact page.