A freestanding open wardrobe is one of the easiest built-in items to get wrong, and almost all of the problems start before the factory opens a drawing. What you send the manufacturer decides whether the first production drawings come back usable or whether you end up trading emails over a small dimensional discrepancy. Below is the shortlist of what to specify for freestanding open wardrobes, and how to phrase it so a made-to-measure quotation is comparable between suppliers.
Why the brief matters more for open wardrobes than for closed ones
A wardrobe with doors hides its carcass. An open wardrobe does not: every shelf edge, hanging rail, upright and fixings detail is on show, and the unit stands in the room as a piece of furniture rather than as joinery. That changes what has to be settled at the specification stage — visible edge treatment, back panel behaviour, dust access, and how the unit relates to the floor and ceiling it does not actually enclose.
The second reason is commercial. Open wardrobe ranges are made-to-measure: sizing, material and finish options, and layout are specified per project rather than picked from a fixed catalogue size. If your enquiry only says "walk-in robe, open, 3 m wide", every supplier quotes a different interpretation, and the comparison you thought you were making is not one.
The seven items to state in writing
- Room datum, not furniture guesswork. Give overall width, height and depth against a fixed reference line in the room — which wall, which corner, where the finished floor level sits. Note out-of-plumb walls, skirting to be scribed or removed, and any ceiling bulkhead, downlight or air grille inside the wardrobe footprint.
- Freestanding versus fixed. Say explicitly whether the unit is a standalone piece that may be relocated later, or a unit to be fixed to wall and/or floor. Freestanding open wardrobes are supplied as self-supporting carcasses; fixing requirements change the base detail, the back structure and what has to arrive on site before the unit.
- Layout zones with quantities. Hanging sections by garment length (short-hang double rail versus full-height long hang), shelf count and shelf spacing, drawer banks, shoe or bag shelves, a mirror or bench zone. State which zones you want adjustable and which are fixed.
- Structure and material family. Board type, carcass colour, door-free front finish, edge banding or solid-edge treatment, and whether an aluminium-framed open wardrobe is wanted instead of a board carcass — the two behave differently on site and price differently.
- Back panel instruction. For open wardrobes this is not a detail to leave to the factory: state whether the back is a finished face in the carcass colour, a recessed panel, or omitted where the unit reads against the wall. This single line changes both appearance and cost.
- Hardware exposed to view. Rail diameter and finish, visible brackets, integrated lighting and where its transformer sits, soft-close on drawers only or throughout, handleless versus a pull profile.
- Site constraints for delivery and install. Lift or stair dimensions, maximum package size that fits the access, floor protection requirements, and whether the fit-out is one trade visit or two.
A compact brief template you can copy
| Field | What to write |
|---|---|
| Project / room | Apartment, villa guest room, hotel bedroom — one line each. Bedroom layouts in a serviced-apartment or hotel programme repeat, so say how many identical rooms the detail covers. |
| Opening dimensions | Width × height × depth at three points (left, middle, right), plus finished floor level and ceiling height. |
| Unit type | Freestanding open wardrobe; freestanding with a return; corner open wardrobe; or modular open wardrobe built up from standard modules. |
| Zones | Example: 2 × full-height hang, 1 × double short-hang, 5 shelves (3 adjustable), 3-drawer bank, top shelf for luggage. |
| Finish | Carcass, front/edge, back panel face, and the reference you want matched — sample, RAL/NCS note, or an existing finish on site. |
| Hardware & lighting | Rail finish, drawer runners, integrated lighting with switch or sensor, and who supplies the electrical first fix. |
| Access & install | Lift size, package limits, install window, and whether you need installation support or a local trades fit-out from your side. |
| Commercial terms | Quantity, split deliveries if the site needs them, Incoterms you want quoted on, and packing standard for export freight. |
How this works with a custom & OEM manufacturer
With a factory that handles bespoke joinery directly, the exchange normally runs in stages: your brief and any drawings, then shop drawings and quotation for your sign-off, then production and shipment. That middle stage is where you should expect pushback — a good manufacturer will query a wide unsupported shelf spanning a hanging zone, or point out that a top shelf above a full-height hang is unusable at your ceiling height. Silence at drawing stage is the warning sign, not agreement.
For multi-unit work, ask for one prototype or first-article unit approved before the balance is released. It costs you time on the front end and removes most of the argument later. If you are buying under your own brand, custom & OEM service also covers finish and branding details, so state that requirement in the first email rather than after pricing.
Where the wardrobes travel internationally, add freight to the brief early. Packaging standard, container loading plan and door-to-door delivery scope are all easier to arrange before production than after. The logistics and door-to-door delivery arrangements — sea, air or rail, customs paperwork, shipment tracking — should be agreed against the same drawing set you signed off, so the packing list matches what the site expects.
Related open wardrobe types worth pricing side by side
Different rooms suit different structures, and quoting two or three options in one enquiry usually produces a better answer than asking for one:
- Minimalist open wardrobes — clean lines and simple carcass detailing, typically specified for modern bedrooms and apartment programmes.
- Metal frame open wardrobes — a slim metal structure carrying shelves and rails, useful where you want visual lightness against glass or a feature wall.
- Wall mounted open wardrobes — carcass off the floor, which changes the loading path to the wall and needs a clear statement of wall construction in your brief.
- Open modular wardrobes — repeatable modules that suit several identical bedrooms, and ease later reconfiguration.
- Wood tone open wardrobes — where the wardrobe has to read as furniture next to beds and sideboards rather than as built-in joinery.
- Glass open wardrobes — display-forward detailing for boutique retail and suite dressing areas, with the cleaning and handling implications that follow.
Questions to expect back from the factory
Can you send photographs of the room?
Yes — send them with dimensions written on the photo. A measured drawing plus three photos taken from the corners of the room resolves most ambiguity in one round.
What if the floor is not level?
Tell the manufacturer the range you measured rather than an average. Freestanding units take adjustable feet or a scribed plinth; wall-mounted units need the fixing layout set from the true line. Both decisions come from your measurement, not theirs.
Should I specify the internal layout or leave it to them?
Specify what you actually store, then ask for a comment on span and spacing. The storage pattern is yours; the structural judgement is theirs. A brief that hands over both usually ends with a unit that looks tidy and does not work.