A bidet quotation looks simple on paper — model number, quantity, destination port. In practice the line item that costs the most to get wrong is the one nobody specified: the waste connection behind the fixture. Before a floor standing bidet 1038F can be priced and packed, we need a short list of facts from your side. Send them with your first enquiry and the quotation comes back comparable item to item, without a change order after the drawings are issued.
1. The fixture itself: model, quantity and suite
Confirm the model code exactly as it appears on your schedule — 1038F in this case — and state quantities per room type rather than one lump total for the building. The 1038F is a freestanding ceramic bidet fixed to the wall through its back support, with an ergonomic curved body and a glossy glaze that resists dirt and limescale. It is designed to sit alongside the matching toilet of the same 1038 series, so tell us whether you want it as part of a complete sanitary suite or as a standalone replacement. Suites priced in one pass are easier to keep consistent across guest rooms and villas.
If your project uses more than one bathroom layout, list each variant separately. A wall hung ceramic bidet 1004F for compact guest bathrooms and a floor standing unit for master bathrooms are different quotations with different packing lists, and mixing them in one line creates ambiguity about what ships when.
2. Waste outlet and rough-in — the number that decides fitment
State whether the waste connection on site is a floor outlet or a wall outlet, and give the rough-in dimension from the finished wall face to the centre of the connection. This is where quotations go wrong most often. On the matching 1038A two piece toilet, for example, the catalogue records both an S-trap floor option and a P-trap wall option with different rough-in figures — the same kind of choice applies across the range, and the exact dimension must come from your technical sheet, not from a drawing scale.
Also confirm the finished floor level. A freestanding unit sits on the completed floor, so if tiling or screed is still to be laid, tell us the intended build-up height; otherwise the fixture arrives ready for a floor that is 20 mm lower than the one you will actually have.
3. Taps, controls and water supply
Bidets are quoted as ceramic bodies unless the rest of the set is stated. So tell us:
- whether tapware and controls are included in your enquiry or supplied locally by others;
- the number and type of tap holes required, and whether a single mixer or separate hot and cold supplies are planned;
- hot water source per bathroom — instantaneous, storage, or central plant — because it affects the specification you write into your own bill of quantities.
If you also need shower sets, basins and other sanitary ware from the same supplier, send those enquiries together. Our bathroom sanitary fixtures range covers floor standing and wall hung WCs, wash basins and bidets, and coordinating them in one order keeps glaze colour, series styling and shipping consolidated.
4. Finish consistency across rooms and phases
Ceramic is fired in batches. For anything beyond a handful of pieces, tell us the total quantity for the whole project even if you will take delivery in phases. That lets us plan firing so guest wing A and guest wing B match, instead of matching two whites that were produced months apart. Where a project needs non-standard sizing or detailing, say so at enquiry stage — our custom & OEM service covers bespoke dimensions, finishes and branding, and a modification agreed before tooling costs far less than one requested after production has started.
5. Quantities, phasing and packaging
Give us quantities by room type, the delivery address or addresses, and whether goods should arrive in full container loads or consolidated mixed containers. Ceramic fixtures are fragile freight; we pack for the handling they will actually meet, including on-site storage conditions. If your site has restricted access — narrow villa staircases, a hotel with lift booking windows, a fit-out running while other trades are on site — mention it now, so pallet sizes and carton counts are set to suit unloading rather than to suit the packing plant.
6. Destination, documents and delivery terms
For an international order we need the discharge port or door address, your preferred Incoterms, and the paperwork your customs broker will ask for: commercial invoice, packing list, and any certificate of origin required at destination. Australian buyers should also confirm who handles import clearance and duties on their side. Our logistics and door-to-door delivery service covers sea, air and rail freight forwarding, customs paperwork and container loading plans, but the import-side obligations differ by project and are confirmed case by case rather than assumed.
7. Installation sequence and after-sales contact
Tell us where you are in the programme. A quotation for a design-stage project should include technical drawings for your services coordinator to check; a quotation for a job already on site needs only the confirmed specification. We support both — from turnkey furniture and building materials packages that run from design through production, delivery and installation, down to a single sanitary line supplied against your own schedule. Name the person on site who will receive goods and sign them off, and we will direct shipping documents and follow-up to that contact instead of to the buyer's inbox.
What the quotation returns
With those seven items in hand, the reply is a proper tender document rather than a price: unit rates by room type, packing and container breakdown, freight option with its delivery term, technical drawings for the trap and rough-in you specified, and a production schedule aligned to your phases. What we deliberately do not do is quote a fixture on a model code alone and hope the plumbing matches. Send the details once, and the same numbers hold from order through to handover.
Preparing a bathroom schedule and want it checked before you order? Contact SANTERSON with your room list and rough-in dimensions, and we will price the sanitary suite against your drawings.