A double basin countertop looks simple on a drawing: one slab, two sinks, some taps. In production it is the point where four separate decisions meet — slab size and seam position, cut-out geometry, tap and waste locations, and how the vanity carcass below carries the weight. When those decisions are still open at order stage, you fix them later on site, usually with a grinder and a delay.
The Santerson Double Basin Countertop is made to order rather than picked from fixed sizes: finish, layout and dimensions are specified per project. That flexibility only pays off if the brief you send is complete enough to be priced and cut without guesswork. Here is what a manufacturer needs from you before it can quote accurately.
1. The wet geometry, drawn once
Send a dimensioned elevation and plan of the wash area, not just a mood image. On that drawing mark the four things that decide fabrication:
- Overall run length, depth and slab thickness, plus whether the countertop returns into a wall or wraps a corner.
- Basin centres from each end wall, and the clear distance between the two basins — this is what determines whether elbows and bottle traps clash under the slab.
- Tap, soap dispenser and overflow/waste positions, with the tap set-back from the front edge.
- Backsplash or upstand detail, and whether you want a square edge, bullnose, mitred thickened edge or a built-up drip edge.
If your Santerson Undermount Basin is being fixed under the slab, the cut-out dimensions and the corner radii have to be stated explicitly, because they follow the basin you choose rather than the other way round. An above-counter Santerson Vessel Basin (Above Counter) changes the brief again: smaller cut-out, but a raised rim that affects tap height and reach.
2. Slab material, slab sheet, and where you want the seam
State the material family first — stone or engineered surface from the Santerson Stone & Marble Surfaces range, ceramic-integrated tops, or a wood and laminate finish that matches your joinery. Then say what you actually care about within that family: veining direction, whether the two halves of a long run must come from the same block or batch, and how much variation is acceptable.
For runs longer than a single slab, tell the factory where you want the joint and let them propose the alternative. A seam hidden under a basin rim reads badly when two people stand at the sinks at once; a seam sitting between basins can be polished flat and read as a design line. Flag this in writing so it is resolved on paper.
Ask for a material confirmation step before cutting: a slab image or batch reference against your specification, with the finish you expect on cut faces and under edges. This single step prevents most disputes about colour and edge appearance.
3. Say how it will be supported
A double top spanning two basins behaves differently from a single-basin top: the unsupported span is longer, and the load path runs through the carcass between the cut-outs. Tell the manufacturer which of these you are building on:
- a floor-standing vanity under the full run;
- a wall-hung carcass, or an Santerson Integrated Countertop Vanity supplied as one matched unit, where the fixing detail and load rating need confirming before the slab arrives;
- bracket-and-batten support on masonry, with a tiled or paneled return.
Also state whether you want the countertop supplied together with the vanity as one unit or shipped separately for local installation. That decision changes packing, crating and who is responsible for final alignment.
4. Give the site constraints up front
The details that cause rework are rarely on the product page — they are on site: finished floor level, the depth of a window reveal over the basin, where the existing soil and waste stack sits, whether the tapware you have already bought is wall-mounted or deck-mounted, and whether mirror cabinets or bathroom fixtures above the top set their own height limit. Send photos and a measured sketch of the room alongside the wash-area drawing.
If the same detail repeats across several bathrooms or units, say how many and whether they are identical. Identical sets can be templated once and produced together; near-identical ones should be surveyed individually before anyone commits to a repeat dimension.
5. What you should receive back
A manufacturer working from a complete brief replies with more than a price. Before production, expect:
- a fabrication drawing with cut-outs, tap holes, edge profile and seam position marked to dimension, for your sign-off;
- the material and finish reference you are buying, stated in the same words on the order and the packing list;
- the basin, waste and trap specification that the cut-outs were designed around;
- packing and crate dimensions against your access route — stairwells, lifts, door widths;
- for a project order, who handles delivery, installation support and snag rectification afterwards.
SANTERSON works as a one-stop furniture and building materials supplier, so the same team can carry the countertop, the vanity below it, and the surrounding joinery through design, production, delivery and installation rather than leaving you to coordinate three vendors. Where a standard configuration does not fit, custom furniture and OEM manufacturing covers bespoke dimensions, finishes and detailing.
Before you send the enquiry
Check these are all answered in your message: overall dimensions with thickness; basin model and its cut-out requirement; tap and waste positions; edge profile; material and finish reference; support method; quantity of identical sets; site access for delivery. Anything missing becomes a question back — or worse, an assumption made on your behalf.
Send that package to SANTERSON and the first reply should already be a drawing you can approve, not a list of unknowns.