Two-tone veneer wardrobes look deceptively simple: two wood tones, a clean front, a made-to-measure box. The reason quotations for the same-looking wardrobe can differ so much is that almost everything that decides price, durability and fit sits behind the door face. Before you approve an order, put these questions to your supplier and get the answers in writing.
1. Which two tones, and where does one stop and the other start?
"Two tone" describes a combination, not a fixed recipe. Establish which species or grain cut appears on the door face, which on the carcass visible parts, and which on reveals, shelves and interior panels. Then confirm where the transition line falls on each elevation — at a reveal, at a shadow gap, or across a continuous panel.
- Request physical veneer samples for both tones together, viewed in the room's own light as well as daylight.
- Ask whether the grain direction runs vertically or horizontally on each surface, and how the joints are booked or matched across adjacent doors.
- Confirm that interior surfaces are finished to the same standard as exterior ones, or agree explicitly where they are not.
Our Two Tone Veneer Wardrobes are made to measure, with finish and layout specified per project, so the tone split is set on your drawings rather than chosen from a fixed catalogue option.
2. What is the substrate behind the veneer, and how are edges handled?
Veneer is a face; the board underneath decides how the panel behaves over years of humidity change and hinge loads. Ask what substrate is used for doors, carcass and shelves, and what thickness each one is.
- How are edges finished — veneer-wrapped, solid timber lipping, or edge banding? Which edges get which treatment?
- Are door panels balanced with a matching back face so they stay flat?
- What is the finishing system, and how many coats on faces versus edges?
These details explain most of the price gap between two similar-looking quotations, and they are exactly what a buyer cannot see once the wardrobe is installed.
3. Who measured the opening, and how are site irregularities resolved?
A made-to-measure wardrobe only fits if the opening was surveyed with the floor, wall and ceiling finishes in place. Ask whether measurements were taken on site or supplied from architectural drawings, and whether out-of-square walls, skirting, cornices, light switches and door swings were recorded.
- Will scribes, filler panels or a squared carcass be used to close uneven reveals?
- Which trades are responsible for the wall face, flooring and trim, and in what order do they work relative to installation?
- Is there a re-measure before release into production, and who signs off the final cut list?
Where we supply joinery on villa and apartment projects, this survey and drawing sign-off is part of the workflow, because a single unrecorded skirting return can hold up an entire fit-out.
4. What is inside the carcass, not just on the front?
Storage layout is where a wardrobe earns its keep day after day, and it is cheap to change before production and expensive to change afterwards.
- How much hanging height for long garments, and are rails at more than one level?
- How many drawers, at what heights, and with soft close as standard or optional?
- Are shelves adjustable, and are their spans stiff enough for the intended load?
- Is there provision for interior lighting, and where does the transformer and switch live?
- How are doors specified — hinged, sliding or bi-fold — and what clearance and track strength does each need?
If your bedroom plan also needs matching cabinetry, ask whether the same supplier can produce built-in furniture in the same veneer and finish, so tones and reveals match across rooms instead of being re-sourced from different workshops.
5. How are hardware, tolerances and moving parts specified?
Ask for hardware by brand and model, not by adjective. "Soft close" or "premium hinges" means nothing comparable across two quotations.
- Hinge type, load rating and whether they are adjustable in three directions after installation.
- Runner make, extension and load rating for each drawer; handleless grooves or profile pulls versus applied handles.
- For sliding configurations, track material, wheel specification and the service access needed for adjustment.
- Which hardware items are stocked as spares, and how replacements are ordered later.
6. If the project is overseas, how does the wardrobe travel and arrive?
For an order crossing an ocean, packaging and sequencing matter as much as the panel specification. Ask what the packing standard is, how panels are protected at edges and corners, and how crates are marked against room or elevation numbers so the site team can find each part.
- Sea, air or rail consolidation, and which incoterms the price is quoted on.
- Who prepares commercial documents, and who handles import clearance at your end.
- How shipments are tracked, and what happens if a panel arrives damaged.
We handle freight forwarding, packaging and container loading, customs paperwork and door-to-door delivery as part of the project scope, so the joinery does not become an orphan consignment sitting at a port.
7. Who installs it, and what happens after installation?
Clarify responsibility before order placement: does the price include installation, or delivery only? If local labour is used, who briefs them on the drawings, and who resolves snags — the supplier, the builder or the installer.
- What inspection list is signed off at handover, and how are defects recorded?
- What warranty applies to panels, hardware and workmanship, and what is excluded?
- How are spare parts and future additional modules ordered — will a later batch match the original tone?
Ask specifically about re-ordering: veneer batches vary, so get a written statement on whether future additions can be matched to the original specification or should be ordered together in one production run.
8. What exactly is included in the quoted price?
Put both quotations side by side against the same checklist and see what disappears. The commonly omitted items are scribe panels, plinths, toe kicks, back panels, interior finishes, hardware upgrades, lighting provision, packing for export, delivery to floor level, and installation consumables.
- Is the quotation itemised per elevation, or one line for "wardrobe as drawing"?
- Are drawings, survey and a sample door included, or charged separately?
- What payment stages apply, and what is released at each stage?
A supplier that works on whole-project fit-outs can usually quote the wardrobe alongside turnkey interior project solutions, which keeps cabinetry, doors, panelling and finishes under one accountable scope instead of several separate contracts.
9. Can the supplier show how they have handled this detail before?
Ask for photographs or drawings of completed two-tone work, including the awkward parts: internal corners, ceiling reveals, transitions to other joinery. If custom work is involved, ask what their custom furniture design and prototyping service covers — sample doors, mock-up elevations, material boards — and what it costs.
A sample door in your two selected tones, viewed on site, is the cheapest quality control step available before a full production run.
Send us your floor plan, an elevation of the wall and the tone you are considering, and we will come back with a specification and quotation that answers each of the questions above on paper — so you can compare it against any other offer line by line.