A quotation for a teak-look aluminum outdoor bench & integrated picnic table set comes back quickly once the buyer has supplied four things: where the furniture will sit, how many units and seat positions are required, which dimensions and finishes the design calls for, and how the goods will reach site. Send those details in one enquiry and you receive a costed specification; send half of them and you receive a follow-up question instead.
That gap is where most outdoor furniture enquiries stall. Our outdoor furniture for villas and resorts line is built to order rather than held in stock, so the production sheet has to be written from your drawings and site notes before a cost can be fixed. The checklist below is the same one our project team works through, so you can prepare the enquiry on your side and shorten the round trip.
Information checklist before you enquire
- Installation setting — poolside, rooftop, garden, courtyard or coastal balcony
- Configuration and quantity — bench with side tray, integrated picnic table, or both
- Dimensions and clearances — overall length, seat count, site drawing if space is tight
- Finish references — slat tone, frame coating code, cushion fabric
- Delivery terms — destination, target on-site date, port or door-to-door
Start with the installation setting
Tell us where the pieces will live: poolside, rooftop terrace, garden lawn, clubhouse courtyard, a coastal balcony or a shared community area. The setting drives three decisions in the quotation.
- Frame and surface treatment. Aluminium is the base material across this group, which removes the oiling and sanding routine that solid timber demands outdoors. A seaside or salt-spray location still calls for a different coating specification from an inland courtyard, so we need to know if the site is coastal.
- Cushion and soft-goods choice. Bench seating used beside an infinity pool needs quick-drying, removable covers; a shaded garden bench can carry a heavier fabric.
- Anchoring and floor condition. Fixed picnic tables with attached benches sit differently on a paved terrace, a timber deck or a lawn. Send the paving or deck detail so we can specify how the frame is fixed.
State the configuration you actually need
This product group covers two distinct items that share one teak-effect slat look, and buyers often ask for both in a single order. The minimalist bench pairs seating with a small side tray for drinks and towels. The integrated picnic table carries fixed benches on an X frame for group meals. Confirm which of the two you want, or how many of each, before we price anything.
Then give us the numbers that shape the production sheet:
- Quantity per configuration, and whether the order will be split across phases or buildings
- Overall length and seat count you need, plus any clearances from walls, planters or railings
- Whether the table top is fixed or must accommodate parasol holes, trays or service openings
- Stacking, moving or storage requirements for seasonal rearrangement
Dimensions are adjustable on these sets. Where a site drawing shows a tight bay or a curved planter edge, send the drawing; we size to it rather than asking you to fit a standard module.
Specify finishes, slat tone and hardware
"Teak-look" covers a range of tones and slat profiles. To avoid a colour mismatch against existing joinery or decking, send one of the following: an RAL or paint code, a sample photograph of the reference surface taken in daylight, or the tone used on another item already specified for the project. Also confirm the frame coating — dark powder coating is common, but lighter tones suit pale paving better.
Related pieces in the same slat language are worth quoting together, because matching tones across two suppliers is where projects lose coherence. Our aluminum & teak-look slat outdoor dining set and adjustable sun lounger uses the same teak-effect surface for pool decks, and the L-shaped aluminum outdoor corner sofa set with teak-look slat tops extends it into lounge areas. Quoting these as one package keeps the tone, the coating and the delivery window aligned.
Add the commercial and delivery details
The rest of the quotation depends on logistics rather than design. Please include:
- Destination port or site address, and whether you need door-to-door delivery or collection at port
- Target on-site date, working backwards from handover or opening
- Packaging preference for the container — flat pack, part assembled or fully assembled
- Whether your own brand marking, labels or packaging are required
- Who handles import clearance and duties at destination
Our furniture logistics and door-to-door delivery service covers freight booking, packing lists, commercial documents and container loading plans. Tell us the delivery term you intend to buy on and we will price against it instead of guessing.
What you receive back
With the setting, configuration, finish and delivery information in hand, the reply includes an itemised unit price by configuration, the applicable lead time, a packing list with volumes for freight planning, and drawings or photographs of the proposed build for your approval before production starts. Where dimensions or tones are still open, we mark those lines as provisional so nothing is committed to the factory without your sign-off.
If you are furnishing several outdoor zones at once — benches, dining, loungers and shade structures — send the full zone list rather than one item at a time. As a custom furniture manufacturer we can consolidate those lines into one production run and one shipment, which is normally where the real saving sits.
Send your drawings, quantities, finish references and delivery address to our project team, and we will return a costed specification for the bench and picnic table set against your site conditions.
Product dimensions, coating options, packaging terms and delivery arrangements are confirmed case by case on the order drawings. Import duties, local building requirements and installation responsibilities should be checked against the rules applying at your destination before the order is placed.