A proposal for Santerson Glass Folding Doors usually arrives looking complete: a rendering, a set of dimensions, a finish name and a price. What it often leaves out is the information that decides whether the opening will actually work once the panels reach site. Use the checklist below to read the document line by line before you sign anything.

1. Confirm the opening, not the drawing

These doors are made to measure for each project, so every number in the proposal should trace back to a site record rather than a design intent. Ask which dimension set was used — finished floor to finished ceiling, or structural opening — and where the floor finish allowance sits. A folding door needs room for the stacked panels at the parked end, and that stack depth changes with the number of leaves you choose.

  • Request a dimension sheet that shows width, height, panel count, panel width and parked stack depth for your opening.
  • Ask who measured the opening: your site team, or the manufacturer working from architectural drawings alone.
  • Check that the proposal states tolerances and how out-of-plumb or out-of-level walls will be handled during installation.

2. Read the specification for what is missing

Material and finish options are listed as configurable, which is useful — but a proposal that says only “glass” or “aluminium frame” has not specified anything yet. Push each line item down to a level your site team can inspect on delivery.

Line in the proposalWhat a workable answer looks like
GlassGlass type, thickness and build for each leaf, plus which leaves are fixed and which operate
Frame / finishNamed finish system and colour reference, with a physical sample you keep as the delivery benchmark
HardwareHinges, rollers, handles and locks itemised separately, with the operating hand of each active leaf marked on the layout
Track and thresholdWhether the door is top-hung or bottom-tracked, and how the threshold meets your floor finish
LayoutA panel-by-panel diagram showing fold direction and parking side for every opening

If a hardware item is bundled into the unit price rather than listed, ask for it to be broken out. Bundled hardware is where substitutions quietly happen.

3. Check how the proposal handles the rest of the door schedule

Folding doors rarely stand alone in a villa or hospitality package. The same wall usually carries hinged, pocket and sliding leaves, and each is quoted separately. Compare your Windows and Doors schedule as one document: consistent frame profiles, matching finish references and aligned sightlines across door types are what make the joinery read as built-in rather than purchased.

Where a room needs the opening to disappear completely, ask whether Santerson Glass Pocket Doors or Santerson Flush Sliding Doors is the better answer for that specific opening, and get both priced. A proposal that offers only one door type for every opening is not yet a design response.

Santerson Glass Folding Doors installed as a full-height glazed opening
Santerson Glass Folding Doors — layout, dimensions and finish are set per project.

4. Test the commercial terms against your programme

Made-to-measure joinery locks you into a sequence: drawings signed, panels produced, then shipped. Read the proposal for the approval gate — which drawing version becomes production-approved, and what happens if a dimension changes after that point. Then check how the doors sit inside the wider order.

  • Ask how the doors are packed and loaded relative to fragile items in the same container, and how panel edges are protected.
  • Confirm who inspects for transit damage on arrival and what evidence is expected when a claim is raised.
  • Get spare parts availability in writing: rollers, hinges and handles are the components you will need years later, not at handover.

5. Verify installation responsibility before signing

A folding door fails more often through installation than through the panels themselves. The proposal should say plainly whether installers attend site, whether your contractor follows supplied fixing details, or both. Ask for the sequencing too: floor finishes, wall finishes and threshold details all have to be resolved before the track goes in.

Ask for a snag list format and a named contact for post-installation adjustment. Panel alignment on a folding set is corrected after handover as the building moves, and you want that route defined while the proposal is still open for negotiation.

Red flags worth stopping over

  • A single price covering an entire door type with no per-opening breakdown.
  • Finish described by photograph only, with no sample reference on the order.
  • No parked stack depth shown for the proposed panel count.
  • Hardware listed as “included” with no itemisation.
  • Installation and after-sales both described as “available” but neither assigned to a party.
A useful test: hand the proposal to your site foreman, not your designer. If they cannot set out the opening, order the floor finishes and install the track from that document alone, the specification is not finished — send it back.

Send us your door schedule

Share the openings, finish references and programme dates for your project and we will return a proposal with dimensions, panel layouts, itemised hardware and installation scope set out for each opening.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact page