A walnut solid wood wardrobe rarely fails at the handover meeting. It fails in the months before that, in the gap between a designer's rendering and the joiner's shop drawing — when nobody wrote down which face of the carcass is visible, what the timber actually contains, or who signs off the sample. If you are specifying Walnut Solid Wood Wardrobes for villas, serviced apartments or hospitality guest rooms, the documentation pack is the cheapest quality control you have. Here is what experienced procurement teams put in writing before a purchase order is released.
Start with the specification record, not the quotation
Every wardrobe line on your schedule needs an owner and a version number. That sounds administrative, but it is what stops three suppliers quoting against three different interpretations of one drawing. For each wardrobe type in the project, record:
- The room or unit reference, plus the wardrobe type code used consistently across drawings, quotations and packing lists.
- The revision number of the drawing the quotation is priced against, and the date that drawing was issued.
- Who inside your organisation accepts the specification, and who accepts the delivered goods. These are often different people, and ambiguity here causes most handover disputes.
SANTERSON's own project workflow runs from consultation and design through production, logistics, installation and after-sales, so a clean specification record also gives your supplier something concrete to price against. Their Custom & OEM Service covers bespoke finishes and prototyping, but bespoke only works when the brief is unambiguous on paper.
Write down what "solid wood" means on this project
This is where most confusion enters a walnut wardrobe order. "Solid wood" in a catalogue title does not automatically mean that every component — shelves, drawer boxes, back panels, carcass interior — is a single piece of timber. Nor does it tell you how the species is identified. Before comparing prices, require each bidder to state, line by line:
- Which components are solid timber and which are engineered or panel-based substrates, and why.
- The species name as it will appear on the packing list and commercial invoice, not just a trade name.
- The construction method for doors, panels and drawer boxes, since these drive both cost and movement in service.
This matters more than it seems when you are buying across a range. A project that mixes Walnut Veneer Wardrobes with solid wood carcasses needs one documented rule about which element carries the visible walnut face, otherwise matching tones between rooms becomes a negotiation instead of a check.
Fix the finish schedule before production starts
Walnut reads well or badly depending entirely on the finish. Document the finish as a physical reference, not an adjective. In your schedule record:
- The sheen level for each surface, and whether interior surfaces carry the same finish as the visible faces.
- The application method, because sprayed, wiped and lacquered finishes on the same species look different under site lighting.
- How colour variation across the batch is handled — what is accepted, and against which approved sample.
- The care product recommended by the manufacturer for routine cleaning of the delivered units.
Sign a physical sample before production, not a photograph on a screen. Record the sample's reference code and where it is stored on site; at handover that sample is your evidence, and a signed-off board settles arguments faster than any specification paragraph.
Lock dimensions against the site condition, not the architectural drawing alone
Walnut Solid Wood Wardrobes in the SANTERSON catalogue are made-to-measure, with layout, finish and dimensions specified per project. That flexibility is an advantage only if the dimensional record reflects the room as it will actually be built. Document:
- Finished floor levels and finished wall faces, with the floor build-up confirmed by the builder rather than assumed.
- Out-of-plumb and out-of-square allowances, and who is responsible for making good before installation.
- Clearance for doors and drawers in relation to skirting, architraves, switches and adjacent joinery.
- Any interface with lighting, curtains or built-in seating that has to be coordinated with another trade's drawing.
Where the fit-out also includes Santerson Integrated Cabinet Lighting, record the cable route, driver location and access panel before the carcass is built. Retrofitting wiring into a finished wardrobe is one of the most common avoidable site variations on joinery packages.
Specify the interior layout in the buyer's language
Suppliers draw hanging rails and shelves; end users care about coats, suitcases and ironing boards. Translate the brief into a documented layout schedule so that what is manufactured matches how the room will be lived in:
| Document | What it must state | Why it prevents rework |
|---|---|---|
| Interior layout schedule | Rail heights, shelf counts and depths, drawer positions, shoe and luggage zones per unit type | Stops generic layouts being delivered into rooms with different storage needs |
| Hardware schedule | Hinges, slides, handles and any soft-close items, with brand or grade and quantity per unit | Makes substitutions visible at quotation stage instead of at handover |
| Door and opening schedule | Hinged, sliding or open configuration per unit, plus swing direction and clearance | Prevents doors that clash with beds, switches or neighbouring joinery |
| Interface notes | Flooring threshold, skirting treatment, lighting and cornice details | Assigns responsibility to a named trade before the package is ordered |
| Approved sample log | Sample code, date approved, approver, storage location | Gives site a physical benchmark for inspection and handover |
Keep the hardware schedule separate from the carcass description. Hardware is where value engineering quietly happens, and it is also the part most likely to need replacement spares years later — a documented grade makes that enquiry straightforward rather than a search through old emails.
Document transport, storage and handover as part of the order
Timber joinery is damaged more often in the last fifty metres than in production. Add a delivery and handling record to the purchase order covering:
- Packaging method and protection of visible faces, recorded against the packing list so each crate can be traced to a room.
- On-site storage conditions agreed with the builder — flat, dry, indoors, and acclimatised before installation.
- The inspection point: what is checked on arrival, who signs, and how damage is reported and photographed.
- The snag list format for installation defects, with a named responsible party for each item.
For international orders this record extends to freight. SANTERSON's Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork and container loading, but your own documentation should still state the delivery terms in force for each shipment, who handles customs clearance, and where responsibility transfers. Their Installation & After-sales Support page lists on-site installation, inspection and snagging — agree in writing how those visits are scheduled against your programme, so joinery does not arrive before the room is ready for it.
Keep one document set that survives the project
The final record should be readable by someone who was never on the job — a facilities manager, a future owner, an insurer. At close-out, hand over:
- As-built drawings for every wardrobe type, marked with actual dimensions and any site changes.
- The finish schedule with approved sample references, plus the recommended cleaning regime.
- Hardware details needed to order replacement hinges, slides or handles.
- Supplier contact route for spares and service, and the warranty terms as actually written in the contract.
If a project coordinates wardrobes alongside other built-in elements — Custom Minimalist Bedroom Wardrobe units, kitchen cabinetry or media walls — keep them in one document set with consistent codes. Fragmented records across several packages is how duplicate orders and orphaned spares requests happen.
Questions buyers ask us most often
Should the specification name a single walnut species?
Name what your project actually requires and require the supplier to confirm in writing what they will supply, including how it appears on shipping documents. Species naming is a contractual matter, not a catalogue detail, and vague wording is where disputes begin.
Is one approved sample enough for a multi-unit order?
Approve a sample for each finish type in the project, and log it. For larger orders also agree how tonal variation within the batch will be assessed against that sample, so acceptance at delivery is not left to opinion.
When should dimensions be frozen?
After floor build-ups and finished wall faces are confirmed by the builder, and before production release. Made-to-measure joinery ordered against unfinished levels is a common source of site variations.
Do we need separate documentation for hardware?
Yes. A hardware schedule listing grade, brand where required and quantity per unit protects you from silent substitutions and makes future spare-part enquiries much faster.
Before you release the purchase order
A walnut wardrobe package is straightforward to procure when six things are written down and signed: what the timber contains, which finish was approved, which dimensions reflect the built condition, how the interior is laid out, what hardware is fitted, and how goods are delivered, inspected and handed over. Everything else in the negotiation follows from those.
If you would like a specification reviewed against our Solid Wood Wardrobes range before ordering, send your drawings and finish schedule to SANTERSON — Contact Us. We work from your documentation, so the quotation reflects exactly what your site will be asked to inspect.