An outdoor swim spa arrives on a flatbed, gets craned or rolled into place, and then has to be levelled, wired, filled and commissioned before anyone swims a lap in it. For the Outdoor Swim Spa WS-125AⅢ-U, most of the schedule risk sits in the weeks before the shell leaves the factory, not on the delivery day itself. The planning below follows how we run these orders from quotation through handover.
Start with the site, not the catalogue
The catalog dimensions for this model are 5500 × 2300 × 1350 mm. Before anything else, walk the intended position with a tape measure and check three things: the clear route from the truck drop-off to the final location, the load rating of any deck, terrace or slab under the footprint, and where the power feed and control system will sit. A shell that fits the plan on paper can still fail to reach the position if a gate, side passage or overhead beam is in the way.
Write those site conditions into your enquiry. We build the packaging, lifting notes and freight quote around the access you describe, so a late change of position usually means re-quoting rather than simply moving a date.
Confirm the configuration before production closes
The WS-125AⅢ-U is part of our configurable outdoor swim and hydrotherapy range. The equipment shown on the product page for this model is a control system (1 set), 4 water pumps, 1 filter pump, 23 jets in total and 1 LED light, with a total power figure of 11.85 kW. Optional catalog items include UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps.
Every one of those options changes the electrical load, the plumbing runs and sometimes the position of plant equipment, so the configuration has to be signed off before production. Note that the closely related Outdoor Swim Spa WS-125AⅢ shares the same shell size but is listed with different equipment and power figures. Treat each model code as its own specification sheet rather than assuming the two are interchangeable.
| Model | WS-125AⅢ-U |
| Catalog dimensions | 5500 × 2300 × 1350 mm |
| Jet total | 23 pcs |
| Pumps | 4 water pumps, 1 filter pump |
| Total power | 11.85 kW (as listed for this configuration) |
| Features shown | Water jets, LED lighting, Ozone |
Please confirm the included equipment and the electrical requirements for your selected configuration with us in writing before production starts, and have a local electrician size the supply and protection to that confirmed load. Electrical work on site should be carried out by a licensed installer working to the rules that apply at your address.
Agree the freight terms and who does what
Our logistics and door-to-door delivery service covers sea, air and rail forwarding, customs paperwork, packaging and container loading, shipment tracking and delivery to the site address. Commercial invoices, packing lists and certificates of origin travel with the consignment.
What still needs naming in your own plan is the division of labour on the ground:
- Who books the crane, hiab or spreader bar if the shell has to be lifted over a wall or onto an upper terrace.
- Who prepares the base — slab, footings or deck reinforcement — and when it will be cured and level by the delivery window.
- Who runs the power feed, conduit and isolation switch to the plant position.
- Who handles import clearance and any permits your council or building authority requires for a structure of this size.
Put these responsibilities into one page with names and dates. Import terms, duties, insurance cover and transit time are settled case by case on the quotation, so match the delivery date to what your base contractor and electrician can actually commit to.
Sequence the site works backwards from the arrival date
A practical order of work, counted back from the week the spa lands:
- Before production closes: configuration signed off, dimensions and access confirmed, electrical target load agreed with your electrician.
- During production: base constructed and cured, conduit and cable pulled to the plant position, deck or paving around the footprint finished so the crane does not damage new work.
- In the delivery week: lifting gear booked, route cleared, site contact available with keys and gate codes.
- After set-down: levelling, connection of power and control system, filling, then a commissioning run covering jets, filtration, lighting and the ozone system before handover.
Insulation and heat pump options are worth deciding early if the spa will be used year-round, because both affect how the plant compartment is arranged and how much clearance it needs for servicing.
Handover and what happens afterwards
Our installation and after-sales support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. On a swim spa the useful handover record is short: the as-built configuration list, the commissioning readings, the control system settings, and any site-specific notes about access to pumps and filters for future servicing.
Keep that record with your project file. Spare pump, jet and lighting parts are supplied against the confirmed configuration, so a specification sheet that matches what was actually built saves weeks if something needs replacing later.
Planning several units or a wider package
Swim spas are frequently ordered alongside other outdoor and interior items on the same project. Under our turnkey solutions we coordinate production, shipment batches and site installation across furniture, fixtures and building materials, which keeps one delivery window rather than several unrelated arrivals.
If you want the range reviewed in full, the swimming pool and swim spa category lists the available models, including longer layouts such as the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool.
Send us the model code, your site access notes and the target installation month, and we will confirm the configuration, packaging and freight plan against that date.