A swim spa is one of the few outdoor amenities on a villa or resort schedule that carries structural, electrical and water-treatment requirements at the same time. Before a project team signs off on Outdoor Swim Spa WS-115FⅬ, the approval pack should answer four practical questions: does the footprint fit the prepared base, can the site supply the power the unit needs, which items are included in the quoted configuration, and who handles delivery, setting and commissioning. Confirming these on paper, rather than after the container is booked, is what keeps a wet-area item off the critical path.
Start with the footprint and the base
The catalogue lists WS-115FⅬ at 5000 × 2200 × 1250 mm. Treat that as the envelope to plan around, not as the finished installation dimension. On site the team still needs working clearance for access and maintenance, plus space for steps and for whoever will be using the water side of the unit. A useful habit is to mark the outline on the terrace or garden drawing at full scale and check it against the pool deck circulation, the outdoor furniture layout and any pergola, lounger or planting that sits next to the spa.
Two details decide whether the base is right: the finished level of the surrounding deck, and how the unit is set. Recessed, semi-recessed and fully above-ground arrangements each change the excavation, drainage and edge detailing that the civil or landscape contractor must complete. Send those setting arrangements to the local builder before the slab is poured, not at handover.
Confirm the power supply against the quoted configuration
The catalogue figure for this model is a total power of 8.05 kW. That number belongs to the standard configuration shown on the product page, and it moves once options are added. A heat pump, an additional water pump or a different filtration route all draw differently, and the supply available at the site may be single-phase or three-phase depending on the region and the distribution board already installed.
Before approval, ask the supplier for the power figure that matches exactly what is being quoted, then have the local electrical contractor confirm cable size, protection device, earthing and the location of the isolator. The same conversation covers bonding and the position of control equipment relative to splash zones. Local rules are set by the site's authority and installer; they are not something a product catalogue can settle.
Read the inclusion list line by line
The specification shown for WS-115FⅬ lists one control system, one swim training system, one water pump, one filter pump, 24 jets in total and four LED lights. Features shown on the page are water jets, LED lighting, ozone and a swim training system. That is the standard build. The catalogue also lists options such as additional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — and availability and compatibility vary by model.
Catalogue specification for WS-115FⅬ
Model: WS-115FⅬ · Catalogue dimensions: 5000 × 2200 × 1250 mm
Control system: 1 set · Swim training system: 1 set · Water pump: 1 pc · Filter pump: 1 pc
Jet total: 24 pcs · LED lights: 4 pcs · Total power: 8.05 kW
Features shown: water jets, LED lighting, ozone, swim training system
What causes disputes is not the list itself but the gap between the list and the purchase order. Match every line of the quotation to the drawing and to the tender scope: if steps, insulation or a heat pump were assumed by the design team but never priced, that becomes a variation on site. If an item is excluded from this model, ask for it in writing at the same time, because a specification sheet for one model does not transfer to another.
Set out delivery, setting and commissioning responsibilities
A swim spa arrives as a heavy unit on a finished landscape, so the logistics plan matters as much as the product. Confirm the delivery address access, the vehicle size that can reach it, crane or forklift needs, and who lifts the unit onto the prepared base. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery — but the last hundred metres on site is a local arrangement that should be named in the programme.
- Site readiness date. Agree when the base, power feed and drainage will actually be complete, and tie it to the production and shipping dates rather than assuming they overlap.
- Scope split. State in writing which party supplies the power cable, isolator, bonding, steps and any platform, and which party carries out setting and commissioning.
- Water treatment routine. Confirm what the supplied filtration and ozone arrangement does, and what the owner's operating routine will be once the spa is handed over.
- Spare parts and service contact. Agree who holds spares for pumps, jets and lighting, and how a fault is reported after handover, alongside the installation and after-sales support already named in the package.
- Packaging and storage. Confirm where the crated unit will be stored between delivery and installation, and who inspects it on arrival.
Fit the swim spa into the wider package
On most villa and hospitality projects the spa is one line in a larger outdoor scope: loungers, dining sets, pergolas and screens around it, plus interior fixtures inside. Ordering it through the turnkey furniture and building materials package means one team coordinates drawings, production and shipment across those categories instead of each supplier working to a separate schedule. That is also where custom and OEM service helps: finishes, materials and detailing for the surrounding furniture can be matched to the spa deck rather than chosen after the fact.
Approval checklist before you sign
- Footprint checked at full scale against the deck layout, with clearance for access and maintenance.
- Setting arrangement (recessed, semi-recessed or above ground) issued to the local builder with levels.
- Power figure reconfirmed for the exact quoted configuration, including any heat pump or extra pumps.
- Electrical design signed off by the local contractor: supply type, cable, protection, isolator and bonding.
- Included versus optional items reconciled line by line with the purchase order.
- Delivery route, lifting method, storage point and setting responsibility named in the programme.
- Commissioning, handover documents and spare-parts contact confirmed before practical completion.
None of these checks are complicated on their own. They fail only when they are left until after the order is placed. Run them while the swim spa is still a line item under review, and WS-115FⅬ lands on site into a prepared base with power already agreed.
Send us the deck drawing, the configuration you are quoting and the site's supply details, and we will confirm the specification sheet, power figures and delivery plan for Outdoor Swim Spa WS-115FⅬ against your project scope. Contact: SANTERSON contact page.