A swim spa is one of the few outdoor purchases where the number on the specification sheet tells you very little on its own. Two cabinets of similar length can differ by hundreds of millimetres in depth, by a dozen jets, and by several kilowatts of connected load — and those differences change the foundation, the electrical supply and the running cost. The checklist below is built around Outdoor Swim Spa WS-S06B, one of the more feature-dense models in our swimming pool range, so every item can be checked against real catalog figures rather than general advice.
1. Site dimensions and clearance, not just cabinet size
The catalog lists WS-S06B at 5800 × 2200 × 1250 mm (length × width × height). Measure the intended position against that footprint and then add working space: access to the control system and filter pump, room for a cover to fold or roll back, and clearance for anyone stepping in or out. Depth matters as much as length — within the same 5800 mm shell family we also list WS-S06B-T at 5800 × 2200 × 1420 mm, so a shallow and a deeper variant share the plan area but sit differently on a deck or in a sunken pit.
- ✓Confirmed cabinet footprint, plus clearance on every side you will ever need to reach
- ✓A level, structurally adequate supporting base sized for a full, water-filled shell
- ✓Decided above-ground on a terrace or deck, semi-recessed, or fully recessed — this changes access and insulation needs
- ✓A route from the delivery vehicle to the final position that fits the longest dimension
2. Which features are actually in the configuration you are quoting
WS-S06B is shown with water jets, LED lighting, ozone and a waterfall. Those four items drive most of the rest of the checklist: jets need pumps, ozone is a water-treatment choice that sits alongside or instead of other sanitisation, and a waterfall needs its own outlet and spillway detail. If your design brief calls for swimming against a current rather than hydrotherapy, note that the swim training system is not listed in the captured specification for WS-S06B, while it is listed as included equipment on WS-S06B-T. That single difference decides whether you are buying a lap-current spa or a jet-and-waterfall spa.
- ✓Feature list written out in the order: jets / lighting / water treatment / water features
- ✓Swim training system either requested and confirmed, or explicitly marked as not included
- ✓Waterfall, water columns and similar features checked against the model page, since they vary between variants
3. Pump and jet count — read them as a set
The published specification for WS-S06B lists 48 jets in total, three water pumps and one filter pump, with one control system. Jet count on its own is a weak comparison point: what matters is how many jets each pump serves and whether the filter pump is sized to turn the full water volume over at an acceptable rate. When you compare two models side by side, put pump count and jet count in the same column. For context, WS-S06 is listed with 56 jets, two water pumps and one filter pump — a higher jet total on fewer water pumps is a different hydraulic arrangement, not simply "more jets".
- ✓Total jet count and the number of water pumps recorded together
- ✓Filter pump quantity and duty confirmed for your water volume and usage pattern
- ✓Jet layout reviewed against how the spa will be used — seating positions versus standing hydrotherapy zones
4. Electrical supply and connected load
WS-S06B is listed with a total power figure of 13.35 kW. Treat that as the number to hand your electrician, not as an assumption you can absorb into an existing circuit. Confirm the supply available at the site — phase, voltage and available capacity — before you commit to a configuration, because heat pumps, water pumps and lighting all draw from the same board. If the electrical situation is tight, that is the moment to compare configurations rather than models: WS-S06B-T is listed at 8.75 kW total power, which is a materially different supply conversation.
- ✓Total connected power for the exact configuration, in writing
- ✓Site supply checked (phase, voltage, spare capacity) before the order is placed
- ✓Dedicated circuit, protection device and cable run specified by a qualified electrician
- ✓Local electrical installation requirements confirmed with your own installer or engineer for the site in question
5. Lighting, water treatment and control
The specification records three LED lights plus 26 small LED lights on WS-S06B, one control system, and ozone as the treatment feature shown. These are easy items to overlook in a quote comparison because they read as decoration — until you compare two quotes where one includes additional lighting circuits or an optional UV unit and the other does not.
- ✓Main LED count and accent LED count stated separately in the quote
- ✓Treatment approach named (ozone is listed for this model; UV sterilisation appears as an option in our catalogue)
- ✓Control system quantity and location confirmed, with access maintained after installation
6. Options and accessories — decide them before production, not after delivery
Catalog-listed options across our swim spa range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option you assume is interchangeable between two models may not be. Ordering them at the quotation stage keeps them inside one production run and one container; adding them later usually means a second shipment and rework on site.
- ✓Heat pump included or declined, with the resulting power figure checked
- ✓Insulation level chosen for the climate and how often the spa will actually be used
- ✓Steps, sand filtration and UV sterilisation priced in the quote or explicitly removed
- ✓Every option confirmed as compatible with the selected model before production starts
7. Logistics, installation and after-sales scope
A swim spa arrives as a heavy, complete shell, so delivery terms belong on the checklist alongside the product itself. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, shipment documentation and tracking through to door-to-door delivery; confirm the exact delivery address terms, unloading arrangements and who provides lifting equipment for your site. After installation, our installation and after-sales support page describes on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance — ask which of those apply to your order in writing.
- ✓Delivery terms, unloading method and lifting equipment assigned to a named party
- ✓Inspection and snag list agreed before handover, with the same list used at installation
- ✓Warranty scope, spare-parts availability and maintenance contact recorded with the order file
8. Where the spa sits in a wider outdoor package
Swim spas are rarely bought alone on a project. On villa and resort work they arrive together with outdoor furniture for villas and resorts — loungers, dining sets, cabana daybeds — and often a shelter such as our motorized louvered aluminum pergola with LED strip and zip screens, which gives the poolside a controllable roof and removes the need for separate lighting runs. Coordinating those items in one order keeps frame colours, finishes and lighting consistent, and puts everything on one production schedule. Our one-stop furniture and building materials supply covers that kind of combined procurement for villa, hospitality and office projects.
- ✓Poolside furniture, shelter and lighting specified in the same colour and finish schedule
- ✓One production and shipping plan rather than several disconnected orders
Reading the WS-S06B specification before you tick the boxes
For reference, the figures published for this model on our site are:
- Catalog dimensions: 5800 × 2200 × 1250 mm
- Control system: 1 set
- Water pumps: 3 pcs; filter pump: 1 pc
- Jet total: 48 pcs
- LED lights: 3, plus 26 small LED lights
- Total power: 13.35 kW
- Features shown: water jets, LED lighting, ozone, waterfall
These are catalog figures for the standard configuration. Confirm included equipment and electrical requirements for the configuration you actually select — that single sentence is the difference between a clean installation and an expensive variation order.
Common questions
Is WS-S06B suitable for swimming laps?
The captured specification for WS-S06B does not list a swim training system; it lists water jets, LED lighting, ozone and a waterfall. If a swim current is essential to your brief, review the variants that list a swim training system as included equipment, such as WS-S06B-T, and confirm it in the quotation.
Why do two spas of the same length have different power figures?
Pump count, jet arrangement, heating and lighting all contribute. WS-S06B is listed at 13.35 kW with three water pumps and 48 jets, while WS-S06B-T shares the 5800 mm length but is listed at 8.75 kW with one water pump and 40 jets, plus a swim training system. Same footprint, different systems, different supply requirements.
Can I order the spa separately from pergola and poolside furniture?
Yes, but combining them is usually better for projects: one specification, one production schedule and one shipment keeps finishes matched. See our turnkey interior project solutions for how combined outdoor and interior packages are coordinated.
Work through the eight sections above against the model page for WS-S06B, and you will end up with a quotation that states dimensions, feature list, pump and jet arrangement, connected power, selected options and delivery terms — the six things that decide whether a swim spa installation goes to plan. Send us your site dimensions, available supply and intended use, and we will confirm the configuration against those figures before production.