A door schedule is where a project plan quietly falls apart. By the time the joinery, wall finishes and ironmongery have all been tendered separately, the flush hinged doors arrive as an afterthought — different supplier, different finish code, different opening allowance. This article walks through how we place Santerson Flush Hinged Doors inside a whole-project materials schedule, so the doors are specified once, produced with the rest of the package and delivered on the same container as everything else.
Why flush hinged doors belong in the main schedule, not a side list
Flush hinged doors sit close to the plane of the finished wall, which is why they read as part of the surface rather than as a piece of joinery dropped into it. Their appearance depends on what happens around them: the wall build-up, the reveal depth, and the paint or veneer that carries over the leaf. When they are ordered late, problems follow — the wall finish is fixed before the door face is chosen, the frame allowance no longer matches the built-out partition, and the ironmongery is bought to a standard the leaf was never prepared for.
Our approach is the opposite. Santerson Flush Hinged Doors are part of the Hinged Doors collection and are made to measure for each project, with material and finish options specified per opening. That means they can be scheduled at the same moment as the Wall Panel Systems and the built-in cabinetry, so the door face, the panelling and the joinery are drawn from one finish list rather than three.
Step 1 — Fix the door schedule at design stage
Before anything is quoted, we build a per-opening schedule. For each door position we record:
- the room and elevation the opening sits on, so the door can be matched to the adjacent finish;
- clear opening size and finished floor level, because made-to-measure sizing is only as good as the level it is measured against;
- the swing direction and whether the leaf is required to sit flush on one side or both;
- the finish — painted, lacquered, veneered or laminated — with the same reference used for the surrounding wall.
We ask you to confirm dimensions and selected specifications for each project at this stage rather than at production release. Doors are the one item in a villa or apartment package that cannot be trimmed on site without changing the result, so the sign-off happens on paper first.
Step 2 — Group the doors with the other interior joinery
A whole-project materials schedule works when it is grouped by trade interface rather than by catalogue. Our usual grouping for a residential or hospitality fit-out runs like this:
| Package | Typical items | Interface to watch |
|---|---|---|
| Doors and frames | Flush hinged doors, Santerson Flush Interior Doors, Santerson Wood Veneer Hinged Doors | Wall build-up, reveal depth, ironmongery cut-outs |
| Built-in furniture | Wardrobes, tall cabinets, media walls | Door swing clearance, skirting returns |
| Interior fixtures | Custom Built-in Kitchen Cabinets, vanities, worktops | Service runs, appliance recesses |
| Surface finishes | Panelling, flooring, decorative screens | Colour and grain match to door faces |
Grouping matters because the doors are the visual seam between packages. A veneered leaf ordered against a different board reference than the panelling beside it will read as a mistake even when both products are of the same standard. Where a project uses Classic Panel Hinged Doors in some rooms and flush leaves in others, we keep one schedule with both types so the finish codes stay aligned across the whole floor.
Step 3 — Specify what is included and what stays local
Every line in a materials schedule needs an owner. For doors we set out clearly, before quotation:
- Supplied by us: made-to-measure leaves and frames, selected material and finish, packaging for export.
- Confirmed with you: ironmongery standard, access control or privacy requirements, fire or acoustic performance where the project specifies it. These are project-by-project requirements and are not assumed.
- Agreed at handover: who sets the frames on site and to what level, since that determines the final leaf gap.
Writing this into the schedule removes the most common commercial dispute in door procurement: two suppliers each believing the other was supplying the frame.
Step 4 — Produce, pack and ship as one consignment
Because the doors are inside the same order as the cabinetry and panelling, they move through one production window and one quality check. Packing follows the schedule, not the pallet: each leaf and frame is marked to its room and elevation, so the site team can work floor by floor instead of sorting a mixed delivery. As part of our turnkey service, we handle freight arrangements and door-to-door delivery for villa, hospitality and office projects, which keeps the doors, joinery and finishes arriving on one date rather than three.
For projects outside China, this is where a single supplier earns its place. One packing list, one set of shipping documents and one inspection point is easier to administer than four separate consignments with four sets of discrepancies.
Step 5 — Site sequence and the snag list
On site, flush doors are handled last but judged first. The sequence we work to:
- Frames set and aligned to finished floor level, checked against the schedule.
- Wall finish carried over to the frame reveal, not up to an assumed line.
- Leaves hung, ironmongery fitted, gaps checked opening by opening.
- Snag list taken against the original schedule, room by room, with each opening signed off individually.
We support installation and after-sales on these packages, so the same document that specified the doors is the one used to close them out at handover.
A practical checklist before you release the door schedule
- Every opening has a number that matches the drawing set.
- Finished floor levels are stated, not implied.
- Finish references for doors match the panelling and joinery schedule.
- Ironmongery and any performance requirements are named on each line.
- One party is named as responsible for frames, setting and final adjustment.
Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, working on villa, hospitality and office projects from design and production through to delivery and installation support. If you are assembling a materials schedule for a current project, send us the door list with your joinery and finish schedules and we will price the flush hinged doors as part of the same package.