A wood veneer hinged door looks effortless once it is hung and closed. Everything that makes it sit flush with the wall, match the joinery beside it and open in the right direction has already been decided on paper. When those decisions arrive late, the door becomes a snag item: a re-made leaf, an out-of-square opening, or a veneer band that reads differently from the panelling next to it. This guide walks through what we need from your drawings and what we need to know about the site, so Santerson Wood Veneer Hinged Doors are produced against information that will still be true on installation day.
Where the coordination normally breaks down
Interior doors are a small line item, which is exactly why they are often specified last and confirmed least. In villa and hospitality fit-outs we see the same handful of problems repeat:
- Door sizes taken from a schedule that was drawn before the wall build-up was finalised, so the finished opening differs from the schedule by several millimetres.
- Opening direction and hinge side marked on one drawing set and revised on another, with no single version treated as the issuing document.
- Veneer species quoted for the door but not for the adjacent Wood Veneer Panels, wardrobe fronts or cabinetry, leaving the grain and tone to be matched by chance.
- Thresholds, floor finishes and under-door clearances left undecided until after the leaves are manufactured.
- No allowance made for site conditions that change opening geometry — screed heights, plaster thickness, or structural movement in a new build.
None of these are difficult to solve. They simply need to be solved before production starts rather than during installation.
What your drawings should tell us
We work from architectural and joinery drawings, and a door enquiry is easiest to price and produce when the following is legible on them. If a sheet does not carry this information, send it as a schedule alongside the plan.
| Item | Why it matters |
|---|---|
| Finished opening size — width, height and wall thickness | Leaves, frames and linings are made to measure. Wall thickness decides the lining projection, so a wrong figure shows up as a gap at the reveal. |
| Clear floor level and finish build-up | Determines the undercut and the clearance under the leaf, especially where carpet, tile or threshold strips are involved. |
| Opening direction and hinge hand, per opening | Hinge mortising and lock preparation cannot be reversed after the leaf is finished. |
| Leaf construction and core, where specified | Affects acoustic expectation, hardware loading and how the edge detail is finished. |
| Veneer species, cut, grain direction and finish | Crown-cut and quarter-cut veneer read differently in the same species. Grain direction matters when doors sit next to wall panelling. |
| Hardware schedule — lock body, hinges, closers, pulls | Preparation is machined to the selected ironmongery, including backset and faceplate where applicable. |
| Wall and lining interface detail | Tells us whether the door is flush with the wall face, set back, or aligned with a panelling line. |
Where your project uses a coordinated interior scheme, it helps to send the door schedule together with the panelling and cabinetry schedules. We then see the veneer requirement as one package rather than as separate trades, which is how Standard Interior Hinged Doors and veneer doors are kept consistent across a floor.
What the site conditions add on top
Drawings describe an intended building. Site requirements describe the building that will actually receive the doors, and both are needed before we confirm dimensions for production.
Confirm from site, not from schedule
- Taken-off openings. For refurbishment and renovation work, we ask for a site survey of each opening after the wall build-up and floor finishes are in place. Old buildings rarely hold their drawn dimensions.
- Moisture and environment. Bathroom, spa, laundry and poolside-adjacent openings need to be identified early, because material and finish selection changes with the exposure.
- Sequence of works. Doors should follow the wet trades and the floor finishes. Tell us the intended installation window so production is timed to arrive when the openings are ready, not months earlier in store.
- Access and storage. Full-height leaves need a route to the opening that is wide enough, and dry storage on site. Stair-only villas and upper-floor hotel rooms are worth flagging at the ordering stage.
- Local fixing detail. Frame fixings and lining details should follow what your site supervisor and local installer require; we produce to the detail you confirm rather than assuming a house standard.
Interface items that are usually forgotten
Thresholds, expansion allowance at the head, skirting returns, architrave or no architrave, and the treatment of the reveal where a door meets panelling. Each one is a small decision, but each one has to exist on the drawing before the leaf is pressed and finished.
Matching veneer across doors, panelling and joinery
A veneered door rarely stands alone. In the projects we supply, it sits in a wall that also carries panelling, concealed storage and fitted cabinetry. To keep the timber reading as one scheme:
- Specify species, cut, grain orientation and finish once, and apply that single description to every veneered element on the schedule.
- Keep the door leaf, wall panel and cabinet front finishes inside one production package where possible, so they come from the same material batch and finishing run.
- Approve a physical sample before volume production. A veneer swatch photographed on a screen is not a substitute for a board signed off under site lighting.
- Note any deliberate contrast. If a door is meant to read as a separate object against a panelled wall, say so — otherwise we assume continuity.
The same logic applies when doors are part of a wider made-to-measure package. Wood Veneer Pocket Doors and Wood Veneer Folding Doors share the finish specification with hinged leaves but need their pocket casings, tracks and wall build-up resolved much earlier, because the wall itself has to be built around the mechanism.
A practical five-step coordination sequence
- Schedule first, sizes second. Issue one door schedule with an opening number per door. Every later revision is marked against that number, so nobody argues about which version governs.
- Survey or verify the openings. New build: verify after the wall and floor build-up. Renovation: survey each opening.
- Fix the finish and hardware choices. Veneer sample signed off, ironmongery selected, interface details drawn.
- Confirm and produce. We manufacture to the confirmed dimensions and specification, with custom and OEM service covering bespoke sizes, finishes and preparation where your scheme calls for it.
- Deliver against the installation window. Doors arrive when the openings are ready. Our logistics and door-to-door delivery covers freight and paperwork; your site team should have storage and access arranged for arrival day.
Documents worth exchanging before production
| From you | From us |
|---|---|
| Door schedule with opening numbers, hands and sizes | Confirmed shop drawing per opening for your sign-off |
| Plan and elevation references to the issuing revision | Veneer and finish samples for physical approval |
| Hardware schedule with model references | Packing list marked with the same opening numbers you use on site |
| Site survey record where openings are taken off existing walls | Interface and fixing details for your installer to review |
| Installation programme and delivery address access notes | Delivery schedule aligned with that programme |
Marking every document with the same opening numbers sounds bureaucratic until a crate is opened on the wrong floor. One shared numbering system removes most of the confusion between order, delivery and installation.
Checklist before you place the door order
- Opening numbers assigned to every door on the floor or unit.
- Finished opening sizes recorded after wall build-up and floor levels are set.
- Handing and opening direction confirmed against the current revision of the plan.
- Veneer species, cut, grain direction and finish approved from a physical sample.
- Adjacent panelling and cabinetry finishes specified with the same description.
- Ironmongery selected, with lock body, hinges and any closer identified per opening.
- Undercut and threshold treatment decided for each door type.
- Interface detail resolved where the door meets a panelled or lined wall.
- Installation window agreed, with on-site storage and access route confirmed.
If you have a drawing set and an opening schedule ready, send them with your enquiry and we will return shop drawings and a quotation against what your site actually needs. For projects that also need panelling, wardrobes and cabinetry in the same timber, ask for the door package to be quoted alongside those elements so the veneer is handled as one specification.