Open corner wardrobes sit at the awkward point of a bedroom plan. They use the dead corner that a straight run of cabinetry leaves empty, but because there are no doors to hide what is inside, every shelf height, hanging length and finish stays visible. That is exactly why an enquiry that only says “one corner wardrobe, made to measure” comes back with a rough price and a design nobody asked for. The brief you send decides whether the manufacturer can quote accurately or has to guess.

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, and our Open Corner Wardrobes are made to measure: dimensions, layout, material and finish are specified for each project rather than chosen from a fixed size range. Below is the information we need to turn your drawings into a quotation you can compare, and what comes back in return.

1. The room data before the furniture

Send the wall lines first. For an open corner unit we need the two clear wall lengths that form the corner, the actual angle between them (a built corner rarely measures a true 90 degrees), the floor-to-ceiling height on both legs, and everything that interrupts those faces: skirting depth, architraves, downlights, air-conditioning grilles, switch plates and door swings.

Then tell us what the surrounding build is. Substrate and wall tolerance decide how the carcass is packed and fixed, and where the site team needs setting-out lines before panels arrive. If the wardrobe returns into a wall reveal or meets wall panelling, say so at this stage. The junction detail changes, and it is far cheaper to resolve on paper than on site.

2. What has to live inside the corner

List the storage by category and, where you can, by quantity: long hanging for coats and dresses, short double hanging, folded shelving, open cubbies without drawers for daily wear, bags and cases, shoes, laundry. That mix drives shelf spans, rail positions, and whether the corner needs a rotating or pull-out arrangement or simply an open diagonal bay.

Give us the user height. Hanging rails and top shelves should be reachable by the people who will use the room, not set out from a generic drawing dimension. For a project with several bedroom types, note which room each layout belongs to. A villa master suite and a guest room rarely need the same internal split.

3. Layout options worth comparing

If the corner is doing real storage work rather than acting as a transition between two runs, compare an open corner against an L-shaped configuration before you commit. Our L Shaped Corner Wardrobes wrap both walls, so one leg can carry hanging while the other carries shelving — usually a better fit for a walk-in alcove than a single diagonal bay.

If doors were rejected because you want an open, dressing-room look, keep the open language but control what shows. The approach behind our Minimalist Open Wardrobes — closed lower carcasses, open upper bays, and a limited number of visible hanging runs — keeps an open corner readable in photographs and in daily use. Mixing open and closed storage is the usual answer when the same detail has to survive a serviced apartment or hotel handover.

4. Materials, finishes and hardware to name

Name the board, the surface and the edge treatment rather than a colour word alone. “Matte grey” means nothing to a production department; a substrate type with a finish reference and a grain direction does. Our custom and OEM work covers bespoke finishes, textures and veneers, so if you are matching an existing joinery package, send the sample reference, a photograph of the installed work, or a physical sample.

Specify hardware as part of the brief, not as an afterthought: rail type and load rating, drawer runners and soft close, hinge brand where the project already uses one, integrated lighting in open bays, and any anti-tip or fixing requirements for the market you are building for. Hardware is where a low quotation quietly turns into a variation.

5. Documents that make quotations comparable

  • Measured survey or architectural drawings, dimensions in one unit throughout, levels marked.
  • Elevations of both corner faces, plus a plan showing door swing and circulation clearance.
  • Internal layout schedule for each wardrobe: hanging lengths, shelf heights, drawer counts.
  • Finish schedule with substrate, surface, edge and hardware references.
  • Photographs of site condition, including floor build-up height.
  • Quantity of identical units, delivery address, and the installation sequence with other trades.

With those six items two manufacturers quote the same building work, which is how you compare prices honestly. Without them you are comparing guesses.

6. What we send back

A complete brief lets us return a specification review before a number: layout conflicts flagged, shelf spans and rail loads checked, finish and hardware schedule confirmed, and only then a quotation built on the agreed detail. Where the project needs it, design consultation, prototyping and production coordination sit inside our custom and OEM service, and the same factory can carry other joinery and finishes for the project — cabinetry, doors, wall and ceiling systems, flooring — so the fit-out is specified consistently instead of in three dialects.

Freight and site handover belong in the same conversation. We arrange door-to-door delivery with the shipping paperwork handled, and installation and after-sales support follow the agreed scope. Confirm the delivery address, access conditions and fixing details before order confirmation, so the sequence on site is realistic when the panels land.

7. Three questions to settle before you send drawings

  1. Is the corner carrying storage or marking a transition? The answer decides between an open bay, an L-shaped wrap, or closed carcasses with open upper shelves.
  2. What has to be hidden and what can be seen? Open wardrobes reward discipline: daily-wear items in reach, seasonal storage above, nothing on the top shelf that you need weekly.
  3. Who fixes it, and when? Panel weights, floor build-up and the sequence with flooring and decorating are settled at quotation stage, not at handover.

If you are specifying open corner wardrobes for a villa, apartment or hospitality project, send the survey drawings and finish schedule to our team through the contact page. We review the layout with you before production starts, so the detail you approve is the detail that ships.