A full height media wall is one of the few built-in elements in a home that has to work as joinery, as a television enclosure and as a piece of interior design at the same time. Because Santerson Full Height Media Walls are made to measure rather than ordered off a shelf, the quality of your enquiry decides how quickly you receive a usable price and drawings. This guide sets out exactly what to prepare before you write to us, and what happens after we reply.
Why a full height media wall is quoted, not priced
The listing for this product sits in our Media & TV Walls collection and describes a configurable system: finish, layout and dimensions are specified to suit each space. There is no single price because there is no single wall. A three-metre living room elevation with a concealed television bay, open display niches and closed lower storage is a different order from a five-metre villa wall that also carries shelving, integrated lighting and a decorative panel surround.
The same logic applies across the collection. Santerson Integrated TV Panels resolve the television and its cabling into a flush panel elevation, while Santerson Sliding Panel TV Systems hide the screen behind sliding fronts when it is not in use. If your wall has to look like panelling most of the time, that choice alone changes the hardware and therefore the cost.
What to send before you ask for a price
You do not need finished drawings. A phone photograph of the wall and a tape measure are enough to start. What matters is that the following points are answered in your first message, because each one changes what we manufacture.
- Wall dimensions. Overall width and the floor-to-ceiling height, measured at more than one point along the wall. Note ceilings that are out of level, skirting boards you intend to keep, and any pipe, downpipe or switch plate in the way.
- Television details. Screen size and whether it will be wall-mounted or sit on a shelf, plus the depth you can allow. This determines the recess, the structure behind the panels and how much service space is needed.
- Connections. Where the power outlets, aerial, network points and any speaker cable currently sit, and where you want them after installation. Tell us if you plan to reposition them. That is an electrical trade decision, and we will leave the openings accordingly.
- Storage balance. Roughly how much you want open for display and how much behind doors. A family living room usually needs closed storage for games consoles, board games and paperwork; a formal lounge can carry more open shelving. If you have not decided, say so and we will show you both layouts.
- Finish direction. Send the floor, door or kitchen finish you want the wall to sit alongside. A photo of the room tells us more than a colour name.
- Delivery location and access. City and country, the floor the property sits on, stair width or lift size, and whether there is a service entrance. A full height wall arrives as made-to-measure joinery in sections, and site access decides how those sections are divided.
Deciding the layout before the quote is worthwhile
Most of the discussion at enquiry stage is about proportion. A wall that runs floor to ceiling reads taller and calmer than a low sideboard, but it also puts heavier items higher up, so we keep deeper closed storage at the base and lighter display shelving above. Where you want objects shown rather than stored, Santerson Storage & Display Combo is the layout to look at first; where the priority is hiding clutter completely, Santerson Integrated Media Storage keeps everything behind fronts.
If the wall also has to carry books or a home office, it is worth comparing the media wall with our floor-to-ceiling shelving before you commit. And if the television is not the real focus of the room, Santerson Wall Mounted Media Walls in the TV Cabinets and Media Units collection gives you a lighter, partial-height arrangement on the same finish palette.
How our quotation process runs
Our Interior Design Services team works in a fixed order, and your media wall follows the same path. First a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up.
- Brief and proposal. We read your measurements and photographs, ask what is missing, and propose a layout with dimensions marked. At this stage we will flag anything that needs another trade on site, such as relocating electrical points, making good the wall surface, or providing a fixing for a heavy screen.
- Quotation and detail confirmation. The price follows the confirmed layout, materials and hardware. Nothing is cut until you sign off the drawings, so change your mind before this point and not after.
- Production and shipment. The wall is built to the approved drawings as made-to-measure joinery, packed for transport, and shipped to your address. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, export paperwork, container loading and shipment tracking.
- Installation and after-sales. On-site installation, inspection with a snag list, warranty cover, spare parts and ongoing maintenance are arranged through our installation and after-sales support. Confirm the scope for your address when you approve the order.
Finishes you can specify on a media wall
Because the wall is manufactured rather than bought in, we can match it to the rest of the joinery in the property. Wood veneer fronts from our Wood Veneer Panels sit well alongside timber flooring; matte lacquer fronts from Santerson Matte Lacquer Panels read flatter and more contemporary; and a stone or marble panel surround from Santerson Stone & Marble Panels gives the television bay a harder, more formal frame. Tell us which two or three directions you are weighing and we will quote those rather than every possibility.
Where a project needs something outside the standard catalogue, such as a curved end, a niche set into the panelling, a specific handle detail, or your own brand marking on packaging for a development, our custom and OEM service covers bespoke design, prototyping and material choices including wood, metals, engineered stone and laminates.
Combining the media wall with the rest of the project
If you are fitting out more than one room, mention it in the same enquiry. As a one-stop furniture and building materials supplier, we produce cabinetry, wall panelling, flooring, lighting and bathroom fixtures in the same finishes, so a media wall, the wardrobes along the corridor and the kitchen can be made from one matched specification instead of three separate orders arriving on different dates. For whole-property work our turnkey interior project solutions cover villas, hospitality and office projects from design through handover.
Questions buyers ask us most often
Can you quote from a photograph alone?
Yes, as an estimate. Send the photo with overall width and height, and we will come back with a layout proposal and an indicative figure. The firm price follows once dimensions and configuration are confirmed.
Do I need an electrician before you build the panels?
No, but the decision has to be made before production starts. Tell us where sockets, aerial and network points will sit once the wall is installed, and we build the openings and cable routes to match. Any cable relocation itself is carried out by your local tradesperson.
Will a full height wall fit through my stairwell?
That is why we ask about access at enquiry stage. A full height wall arrives as made-to-measure joinery in sections and is assembled on site, so stair width, lift size and door openings are part of the specification rather than a problem discovered on delivery day.
What if my ceiling is not level?
Measure the height at both ends and at the middle of the wall and give us all three figures. We work to the actual dimensions and detail the top trim accordingly, which is one reason a tape measure taken properly at the start saves a site visit later.
Sending your enquiry
Send your measurements, photographs and the six points above to us directly on WhatsApp at +86-13928214007 (PHILLIP) or by email to santerson@qq.com, quoting the wall you are enquiring about. The more of the specification you give us in the first message, the closer our first reply will be to a final price.
Dimensions, materials, hardware and lighting options for a made-to-measure wall system are confirmed per project. The configuration shown on the product page is indicative; your approved drawings are the reference for manufacture.