A made-to-measure sliding door leaves the factory only once. If the panels arrive with a chipped edge, a bent track or a missing hardware set, the replacement round trip costs weeks that no villa or hotel programme can spare. Before you place an order for Santerson Flush Sliding Doors, treat packaging as a specification item and confirm it in writing, panel by panel.

Why flush sliding doors need more than standard furniture packing

Flush sliding doors are specified so the leaf finishes close to the wall surface, which means the visible face and the top edge both matter. The product page for these doors describes project-specific dimensions, layout and finish options, with made-to-measure sizing and material or finish choices listed in the configuration. That configurability is exactly what creates packing risk: every order is different, so a generic carton cannot be assumed to fit your opening, your glass choice or your hardware set.

Two failure modes cause most of the damage on site. First, the panel face is scratched or the corner is knocked, and a door ordered to a specific finish can no longer be handed over as approved. Second, the running gear arrives incomplete or bent — track, hangers, floor guide, wall channel — and even an undamaged leaf cannot be installed. Your packaging confirmation should cover both.

What to confirm before production starts

  • Panel protection. Ask how each leaf is protected on both faces and on all four edges, and what separates stacked or side-by-side leaves. Confirm the edge protection stays in place through handling inside the factory and at the destination.
  • Track and profile packing. Aluminium and steel tracks, frames and decorative profiles bend at a corner. Ask whether long lengths are packed flat, supported along their full length, and kept separate from panel weights.
  • Hardware set per opening. Confirm that the ironmongery for each opening is assembled as one labelled set — hangers or rollers, floor guide, door stop, adjustment tools — rather than loose in a shared box. Ask for a spare-parts allowance on high-traffic guest-room jobs.
  • Finish-specific handling. Where the order uses wood veneer, lacquered surfaces or glass, ask how those finishes are handled differently: interleaving, corner boards, face-down or vertical packing, and whether moisture barrier is used for sea freight.
  • Glass handling, if applicable. If your specification includes glazed leaves, confirm the glazing standard used in transit racking and how the glass is restrained so it cannot shift against the frame.

Marking and documentation that make unloading possible

A site team cannot sort what it cannot read. Agree the marking system before shipment, and ask for each package to carry the same door or opening number used on your drawings, so a fitter knows which leaf belongs to which room without opening anything.

Item on the labelWhy it matters on site
Door / opening number matching the shop drawingsPackages go straight to the right floor and room instead of being opened and sorted
Panel weight and package count per openingTells the receiving team how many handling steps and what equipment are needed
Glass or fragile marking where relevantDetermines stacking order and which packages come out of the container first
Hardware set marked as belonging to that openingPrevents one room's gear being fitted into another, especially on identical guest-room layouts
Packing list cross-referenced to the orderAny shortfall is found at unloading, while claims are still straightforward

SANTERSON's logistics service covers packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and door-to-door delivery by sea, air or rail. Ask your coordinator which documents will list packages by opening number, and confirm the import paperwork your country requires before the booking is made.

Loading plan and container choice

Ask for the loading plan in advance and check three things: whether tall door leaves are loaded upright or flat, whether the doors are loaded last so they are not buried under cabinetry and panels, and whether the track lengths fit the container you have booked. On mixed consignments — doors alongside other interior products such as wardrobes, wall panelling or wall panel systems — the loading sequence decides how much double handling your site team faces.

If your project takes part shipments, confirm that each consignment is self-sufficient: a phase of rooms should receive its doors and their hardware together, not split across two containers weeks apart.

Receiving, inspection and what to photograph

Write the inspection step into your own programme rather than leaving it to the installer. At unloading, check package count against the packing list, look for crushed corners and punctured wrapping, and open one hardware set at random to verify completeness. Photograph any damage on the package before the contents are moved, then again once opened, with the label visible. If your scope includes SANTERSON's installation and after-sales service — on-site installation, inspection and snags, spare parts and replacement — that record is what makes a snag or replacement request quick to settle.

A short confirmation checklist for your purchase order

  • Packaging method stated for panels, tracks and hardware, not left as "standard export packing"
  • Package marking agreed against drawing numbers, with a sample label approved before production
  • Hardware supplied as labelled sets per opening, plus an agreed spare-parts allowance
  • Loading plan reviewed before container stuffing; doors loaded for easy offloading
  • Packing list and customs documents listing packages by opening number
  • Inspection point at delivery defined, with a documented route for damage claims and replacements

Because these doors are made to measure, the details above are confirmed per order rather than published as fixed figures. Send your door schedule — openings, sizes, finishes, glass or solid panel choice, quantities — and ask for the packaging method, label sample and loading plan in the same reply, so you approve all three before production begins.

Practical note: dimensions, finish options and packing details for flush sliding doors are confirmed against your own order documents. Keep the approved door schedule, label sample and packing list together in one project file; they are the reference you will use at unloading and again during snagging.

SANTERSON supplies custom furniture and interior products for villa, hospitality and office projects, with custom/OEM manufacturing, freight by sea, air or rail and door-to-door delivery. Send your door schedule to start a packaging and quotation review.