A classic wooden hinged wardrobe looks simple from the outside: doors on hinges, a timber-look finish, a run of shelving behind them. That apparent simplicity is exactly why buyers get burned. Two quotations can look identical on a drawing and still differ in door construction, carcass make-up, interior layout and hardware quality — differences you only discover once the doors start to sag or the doors no longer line up. A proper buying checklist is what turns an attractive picture into a specification you can actually hold a supplier to.

1. Door type and panel construction

Start with what the doors are, not how they look. Hinged-door wardrobes sit within our wider built-in furniture range, and within that family you will see flat-panel, paneled and mirrored hinged options. For a classic scheme, ask specifically which of these you are being quoted:

  • A flat door with a moulded or applied frame, or a true framed panel construction — the two age differently and cost differently.
  • Panel profile: raised, recessed or shaker-style. The depth of the rebate changes how much dust shows and how the edge is cleaned.
  • Finish build-up: paint, lacquer or wood veneer, and whether the edges are finished to the same standard as the faces.
  • Door height and width per leaf, because a tall single leaf behaves differently from two narrower leaves on the same opening.

Our Classic Wooden Hinged Wardrobes are made to measure, so the panel detail and finish are chosen per project rather than picked from a fixed catalogue size. If a supplier will not tell you which construction they are quoting, treat that as an open item on your checklist, not a detail to settle later.

2. Carcass and case make-up

The visible doors get all the attention; the case decides how long the wardrobe stands up. Confirm on paper:

  • Case material and board thickness, and whether the back panel is fixed into grooves or simply nailed on.
  • How the unit meets the floor and ceiling — scribe pieces, pelmet or a flush finish — and who supplies that detail.
  • Whether the carcass and doors are supplied as one matched set from the same production run, so colour and grain line up across the whole run.
  • How the units are levelled and fixed on site, especially on uneven solid floors common in older villas and apartments.

3. Interior layout planned around what you actually store

A checklist that stops at the doors is half a checklist. Draw the interior before anything is cut, and match it to real use:

  • Hanging zones split by garment length — long coats and dresses need full drop; shirts and folded items do not.
  • Drawer count and depth, including whether shallow jewellery or accessory trays are needed. If drawers dominate the layout, compare against our drawer-focused modular wardrobe arrangement.
  • Shelf spacing at the heights you asked for, not a default grid repeated through every bay.
  • Lighting provisions: where fittings sit, where the switch lands, and how cabling is concealed.
  • End bays and corners — open shelving at the ends reads lighter in a bedroom; closed doors keep the run looking like furniture.

For bedrooms with limited floor area, it is worth pricing the hinged option against a walk-in layout before you commit. Our boutique style walk-in wardrobes solve some rooms that hinged doors cannot, and the comparison belongs on the checklist rather than being decided after the fact.

4. Hardware, hinges and clearances

Hardware is where a budget quotation quietly saves money at your expense. Write down:

  • Hinge type, brand and whether soft-close is included on every leaf.
  • Handle or knob choice, and whether fixings are concealed.
  • Swing clearance: hinged doors need room to open fully. Check the swing against beds, doors, radiators and skirting before approving the layout.
  • Internal fittings — rails, baskets, trouser pulls — with load ratings stated rather than assumed.

Ask for hardware to be listed as line items in the quotation. If it is bundled into a single price, you cannot compare two quotations honestly.

5. Measurement, drawings and sign-off

A made-to-measure wardrobe is only as good as the dimensions behind it. Your checklist should include a site survey that records out-of-plumb walls, floor level differences, skirting depths, architraves, switches and any services running through the wall. Then require a set of drawings you sign off before production: elevations showing door split and panel profile, interior elevations with every shelf and rail dimensioned, and a finish schedule naming each material. Anything not drawn is something that will be decided without you.

6. Delivery, installation and after-sales terms

Finally, close the commercial gaps. Confirm packaging and container loading arrangements, who handles customs clearance and door-to-door delivery, whether on-site installation is included, how snags are inspected at handover, and what warranty and spare-parts support cover. For whole-project buyers, wardrobes rarely stand alone — coordinating them with custom built-in kitchen cabinets and other joinery in one production run keeps finishes consistent and reduces the number of trades on site.

Checklist rule of thumb: every item should be answerable in writing before you place an order. If a supplier cannot answer it, the item stays open — do not let a friendly quotation close it for you.

SANTERSON has manufactured furniture and building materials since 2008 and supplies made-to-measure hinged wardrobes for villas, apartments and hospitality projects, with design coordination, production, door-to-door delivery and installation support. Send us your floor plan and required finish, and we will return a specification you can put straight onto your checklist.