A laser cut metal screen is one of the quickest ways to give a hotel reception an identity. It divides space without blocking light, and its hollow pattern turns ceiling lighting into a shadow display across the floor. It is also one of the easiest fit-out items to get wrong, because the drawing that looks good on a mood board has to survive a real wall, a real doorway and a real installation crew.

Before production starts on a custom laser cut metal screen for a reception or lobby, the following items should be confirmed in writing. Each one is cheaper to settle on paper than to fix on site.

1. The job the screen has to do

Say plainly what the partition is for. Screening the check-in desk from the lounge, hiding a back-of-house corridor, framing a photo wall behind the front desk and standing up to guests brushing past in a lobby are four different briefs. The function decides where the panel is fixed, whether it needs a floor track or a ceiling bracket, how much of the width stays open for circulation, and whether the pattern density matters for privacy at all.

Write down the finished dimensions of the opening, the fixing surfaces you have (concrete, plasterboard, tiled wall, glazed frontage), and any obstruction such as skirting, trunking, sprinkler heads, signage or door swings. Screens ordered to a rough measured width are the most common cause of a site gap.

2. Pattern, cut direction and how it reads at eye level

Ask for the pattern drawn at full scale on the actual panel size before any steel is cut. A motif that looks elegant as a small repeat can become noisy when it runs across a four-metre wall, and an open pattern may show straight through to what you wanted hidden. Check three things on that drawing: where the pattern starts relative to the finished floor line, how it is cropped at the edges, and whether the repeat lands neatly around any opening.

Send a reference photo or your own artwork if you already have a design in mind. Screens are fabricated from your drawing, photograph or reference rather than chosen from a fixed catalogue. If the pattern has to match an existing motif elsewhere in the project, supply the original file and confirm the scale with a physical sample.

3. Material, finish and thickness

Confirm the base material and the surface treatment as separate decisions. Stainless steel panels are supplied with finishes such as brushed gold, matte black and antique bronze, and mirror finishes can carry applied decorative accents. Each finish behaves differently under lobby lighting and under a hand: a mirror surface shows fingerprints along a busy front desk, while a brushed or matte surface is far more forgiving.

Agree the panel thickness and whether the sheet is framed. Thickness affects how delicate the fine detail of a cut looks, how rigid a tall free-standing panel feels, and what edge treatment you see from both sides. For multi-panel feature walls, confirm the number of panels and the width of each. Panel joints are visible design lines, not something to hide on site.

4. Fire, safety and local approval

A reception screen sits in a public area, so the requirements that apply to your building apply to it. Confirm with the project's fire consultant or local authority whether the assembly needs a declared fire performance rating, whether it may obstruct an escape route or a smoke barrier, and whether a free-standing panel must be anchored to structure. Edge detailing matters too: cut edges in a guest-facing position should be deburred and finished, and glass-adjacent fixings need to suit the substrate they bite into.

Put the approval requirement in the purchase description so the supplier knows what evidence you need alongside the goods. Do not assume a finish or grade offered on a product page has been tested for your jurisdiction. Ask, and get the answer from your own consultant.

5. Packaging, delivery and who installs it

Large cut panels are awkward freight. Confirm how the screens are packed and braced, how many panels go in each crate, the crate dimensions against your lift and service-door openings, and the delivery terms to site: port, door-to-door, or up to the floor. If the project is outside the country of manufacture, agree the paperwork (commercial invoice, packing list, certificates of origin) before the goods are made, not after.

Then decide who fits it. Confirm whether panels arrive ready for your own joiner to fix, or whether installation guidance and site coordination come with them, and confirm the sequence: screens should be fitted after wet trades and floor finishes are complete, but before final styling and signage.

6. Samples, approvals and a realistic lead time

Before releasing full production, request a cut sample of the pattern in the agreed material and finish, signed off by the designer or client with a date on it. Record what was approved: pattern file version, finish name, panel size, edge detail. Then work backwards from your opening date through production, freight and customs, and leave float for one round of corrections.

How a supplier who fabricates to your drawing reduces the risk

Because these screens are made to order, the difference between a smooth job and a difficult one is usually how much was specified up front. As a China-based furniture and building materials manufacturer, SANTERSON fabricates laser cut stainless steel partitions to the client's own dimensions and pattern, including gold finish, antique bronze and mirror panels with applied decorative accents, and coordinates the production, packing and door-to-door delivery of the screens within a single project package.

If you are specifying screens as part of a wider reception or guest-room fit-out, sending the layout drawing together with the wall finish schedule lets the screen be coordinated with panelling, lighting and joinery from the same package instead of arriving as an unrelated trade.

Send your drawing, photograph or reference image with the finished opening dimensions and the fixing condition, and ask for a cut sample in the proposed finish before production is released.