A shortlist of wardrobe doors that look good in the showroom is not a purchase decision. Before you confirm a joinery package, the checklist has to cover the finish itself, the board underneath it, how the unit is engineered to your opening, what the interior is organised around, and who signs off each stage from drawing to handover. Below is the buying checklist we work to on matte lacquer wardrobe projects for apartments, villas and hotel guest rooms, written so you can use it with any supplier and spot the gaps quickly.
1. Confirm what "matte" means on the actual door
Matte is a family of surfaces, not one specification. Two doors described as matte can differ in sheen level, tactile feel and how they handle fingerprints, and that difference shows up in daily use rather than in a brochure.
- Ask for a physical sample board of the exact door colour, not a colour code or a rendered image on screen.
- Check the sample under both daylight and warm artificial light in the room where the wardrobe will stand; low-sheen surfaces shift noticeably between the two.
- Decide how reflective you want the surface to be. Our Matte Lacquer Wardrobes sit at the soft, low-sheen end of the range, while High Gloss Lacquer Wardrobes are specified when a room needs light bounce and a mirror-like surface.
- If you want matte but with a different hand-feel, compare the lacquer option with Matte Acrylic Wardrobes and note which surface suits your household or guest traffic.
- Get the cleaning instruction for the chosen surface in writing, including what to avoid. Low-sheen coatings are easy to maintain when you know the method from day one.
2. Ask which substrate carries the lacquer
The lacquer is a finish system applied to a board, and the board determines rigidity, edge behaviour and how the door holds up over years of opening and closing. A complete checklist names both.
- Request the substrate type and thickness for doors, carcase and shelves on the same quotation.
- Ask how edges are finished on tall doors. Wrapped or coated edges matter most at the top and bottom of full-height panels.
- Confirm what is specified for areas exposed to moisture, such as an ensuite opening off the bedroom.
- If your project mixes finishes across rooms, ask whether the same board can carry a matte lacquer door and a wood-look option, so doors and panels stay consistent through the build.
3. Verify the unit is engineered to your opening, not to a standard module
Wardrobe failures rarely start with the finish; they start with an out-of-square wall, a ceiling that drops a few millimetres across the run, or a door that fouls the skirting. This is where made-to-measure work earns its place on the checklist.
- Confirm who takes the site measurement and at what stage of the build, after plaster, flooring and ceiling levels are fixed.
- Ask how scribes and filler panels are handled against uneven walls and ceilings.
- Check clearance for handles or a handleless profile, plus the swing or slide path against beds, doors and light switches.
- In tighter bedrooms, compare hinged layouts with Matte Sliding Door Wardrobes, which remove the door swing from the circulation calculation.
- For a run that turns a corner or wraps a whole wall, ask how the carcasses join and whether an Shaker Panel Wardrobe or paneled variant is offered in the same finish family.
Our wardrobe and Matte Lacquer Panels are specified per project, with dimensions, layout and finish set against the drawings, so wall panelling and doors can be coordinated in one specification rather than matched by eye later.
4. Specify the interior around how you actually store things
A beautiful door over an unusable interior is still a failed purchase. Write down what goes where before the layout is fixed.
- Count hanging needs separately: long garments, everyday hanging, and short-hang double rails.
- Decide how many drawer zones you need, and whether they sit at a usable height rather than being buried at floor level.
- Fix shelf spacing by item type, including bedding, bags and folded stacks, so shelves are not left too deep or too shallow.
- Name the extras now, not on site: lighting inside the carcass, mirrors, trouser and jewellery trays, safes in guest rooms, and provisions for a vacuum or ironing storage.
- For a bedroom fit-out built around clean lines and capacity, our Custom Minimalist Bedroom Wardrobe work covers sizes, internal layouts, door styles and surface finishes as one package.
5. Check the hardware schedule
Hardware is the part of a wardrobe that gets the most cycles, and it is the line item most often left vague on a quotation.
- Ask for brands or model references for hinges, slides, handles and any sliding door system, with loading ratings for drawers and hanging rails.
- Decide where soft-close is needed and where it is not worth the cost.
- Confirm spare-part availability, so a hinge or slide can be replaced without rebuilding a door.
- For handleless fronts, ask how the profile is opened and how the edge is protected on high-use doors.
6. Put the paperwork sequence in order before production
Most avoidable wardrobe problems are decided on paper. This is the part of the checklist that protects the budget.
- Approve shop drawings with dimensions, door direction, and interior layout marked up before anything is cut.
- Sign off a physical finish sample, kept on site as the reference for the delivered doors.
- Agree what is included in the price: delivery to floor, protection, installation, making good, and removal of packaging.
- Get the snag list process and the warranty terms in writing, including what is covered for the finish system as well as the hardware.
On projects we deliver, this sequence follows the same path the site describes: brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up, with project services covering design coordination, custom/OEM manufacturing, logistics and installation support.
7. If the wardrobes are shipping overseas, add a logistics block
For villa and apartment projects sourced from China, the checklist needs a transport section that domestic buyers never write.
- Confirm packaging for doors and panels, including edge protection and how panels are separated in the container.
- Agree Incoterms and who handles customs paperwork, so freight and clearance responsibilities are not assumed by both sides.
- Sequence the wardrobe delivery against flooring, painting and ceiling completion, so joinery does not arrive into an unfinished room.
- Plan who installs on site, and whether guidance from the factory team is available for the first rooms as a benchmark.
Our logistics and door-to-door delivery service covers freight arrangements, documentation and shipment tracking for project consignments; terms are confirmed per project rather than quoted as a fixed promise.
How to compare two quotations on the same basis
Once both suppliers answer the same seven blocks, differences become visible instead of buried. Use this as a quick comparison grid.
| Checklist block | What a complete answer contains | Warning sign |
|---|---|---|
| Finish | Physical sample of the exact door colour and sheen, plus cleaning method | Only a colour name or screen render supplied |
| Substrate | Board type and thickness for doors, carcase, shelves; edge treatment stated | Finish described, board left unnamed |
| Fit to opening | Site measurement after wet trades, scribes and clearances resolved on drawings | Standard module sizes quoted against an unfinished room |
| Interior | Hanging, drawer and shelf zones set from your storage list | Generic shelving grid with no drawer or long-hang provision |
| Hardware | Model references, load ratings, soft-close scope, spare parts route | "Premium hardware" with no model named |
| Paperwork | Approved shop drawings, signed sample, inclusions list, snag and warranty terms | Production starts before drawings are returned to you |
| Logistics | Packaging detail, Incoterms, clearance responsibility, install sequence | Freight quoted as a single round figure with no scope |
A simple way to run the checklist
Work through it in two passes. The first pass is a written enquiry: send your room dimensions, a photo of the wall, and your storage list, and ask for the seven blocks answered in one document. The second pass happens before production: hold the shop drawings and the physical sample side by side with the quotation and tick each line. Anything still vague at that point is cheaper to fix on paper than after the doors are cut.
If you want a wardrobe package specified against your drawings — finish, board, interior layout, hardware and delivery in one proposal — send us the plans and we will price it as a complete specification.