Integrated lighting inside cabinets looks simple on a rendering and complicated on site. A strip that arrives without a driver, a recess that was never cut for a profile, or a switch placed behind a door are the reasons cabinet lighting fails more often than the light source itself. An installation plan is the document that prevents this: it fixes what lights where, how it is powered, who cuts the rebate and who connects the wiring, before any panel is manufactured.

What the plan has to settle before production starts

Cabinet lighting is one of the few finishes in a fit-out that depends on joinery, electrical work and the site schedule at the same time. Because our Santerson Integrated Cabinet Lighting is made to project-specific layout, dimensions and finish rather than as a fixed catalogue item, the specification has to be closed out at the drawing stage. Late changes mean re-machining carcasses or re-ordering profiles.

Write the plan against the same room-by-room schedule you use for cabinetry, so lighting is not carried as a separate document that nobody cross-checks.

The eight items to include

  • Fixture schedule by location. List each run with its position: under a wall unit, inside a glazed display cabinet, along a toe kick, in a wardrobe hanging rail. State length of run and how many runs per room.
  • Cut-out and rebate detail. Note whether the profile is surface mounted, recessed into a shelf underside or built into a rail, and give the section drawing the workshop needs to machine it. This is where most site surprises come from.
  • Driver and transformer location. Every driver needs an accessible point that can be opened for service. Decide now whether it sits in a ceiling void, a cabinet cupboard or a switch box, and make sure the access panel is not blocked by another trade.
  • Switching and control. Door-linked switches for wardrobes and display cabinets, motion sensors for toe-kick and vanity runs, wall plates for general task light. Say which circuit each sensor belongs to.
  • Feeding and connection points. Mark where the run is fed from, cable route between carcasses, and whether connectors are supplied loose or pre-terminated.
  • Finish and colour consistency. Record the profile finish so it matches handles and frames, and confirm that fixtures ordered at different times for the same room carry the same specification.
  • Electrical verification record. Voltage, load per circuit and compatibility between driver and fixture must be confirmed for each configuration. Do not assume one driver suits every run length.
  • Responsibility split. Name who machines the rebate, who supplies first fix cable, who terminates on site and who commissions the circuits at handover.

Who does what, written down

ItemTypically joinery / supplierTypically site electrical contractor
Profile selection and run lengthsConfirmed with drawings before productionReviews cable routes and circuit loads
Rebate or cut-out machiningDone in factory per section drawingNot a site task unless field-adjusted
Drivers, sensors, connectorsSupplied with the unit scheduleMounts and connects to the circuit
First fix cable and conduitPositions marked on elevationsRuns and terminates
Commissioning and snag listAttends for joinery-related defectsTests circuits, records results

Where a project is delivered through our Turnkey Interior Project Solutions, this split is agreed during the design and planning stage rather than in the last week on site, which is when lighting variations usually stall handover.

Bathroom and wardrobe specifics

In bathrooms, cabinet lighting overlaps with mirror lighting and vanity electrics. A Santerson LED Mirror Cabinet ordered for the same wall needs its supply point coordinated with the under-cabinet run, otherwise two drivers compete for one junction box in a wet area. Confirm the electrical specification and mounting requirement for each configuration before the countertop is templated.

In wardrobes, decide the switching logic early. Door-activated strips read well but need a cable path that survives sliding hardware; motion sensors avoid that route but sit lower on the carcass. Both are configurable with Santerson Integrated Lighting Systems in wall and shelving runs, provided the feed position is drawn before the panel is cut.

Sequence it with the delivery schedule

  • At specification: fixture schedule, control logic and elevations signed off together with cabinet drawings.
  • Before production: section details for rebates, driver locations and cable positions released to the workshop and to the electrical contractor at the same time.
  • During logistics: lighting components packed and labelled by room so they do not travel separately from the carcasses they belong to. Our Furniture Logistics and Door-to-door Delivery service covers this kind of consolidated shipment.
  • At installation: joinery set first, then termination and commissioning, then a joint inspection with the snag list closed before handover. Details are on our Furniture Installation and After-sales Support page.
Before you sign the drawings: confirm voltage, load per circuit and driver compatibility for each run length; confirm that every driver has a reachable access point; and confirm the same finish code across all lighting components ordered for one room. These three checks account for most cabinet lighting defects we are asked to resolve after installation.

Send us the room schedule and elevations, and we will return a lighting layout matched to the cabinetry, with cut-out details and a component list by room, so the electrical contractor has one document to work from instead of three.