A swim spa usually enters a project drawing set long before anyone talks to a supplier. It appears as a shaded rectangle on a terrace plan, a note in the landscape specification, or a line in a villa budget that somebody has already priced. The trouble starts when that rectangle has to become a real shell with pumps, jets, controls and a power supply that a local electrician can actually wire. This article walks through what we do at SANTERSON when an architect or project manager sends us a design brief and asks for a Outdoor Swim Spa WS-S06B quotation — and what you should have ready before you send yours.

Start with the envelope, not the jet package

The most useful thing a brief can tell us is the space the spa has to fit into. The WS-S06B is listed at 5800 × 2200 × 1250 mm, which puts it in the mid-length bracket of our swim spa range — long enough for lap swimming against a current and for a seated hydrotherapy zone, narrow enough to sit on a deck or a paved terrace rather than requiring a full pool house. Send us the internal dimensions of your prepared area, plus three measurements that people usually forget: the width of the gate or side passage the shell has to pass through on delivery day, the clear height under any pergola, roof overhang or tree canopy above it, and whether the unit will sit fully on a slab or partly cantilevered.

Those three numbers decide far more than people expect. A spa that fits the drawing but cannot fit through the side gate becomes a crane lift, and a crane lift changes the budget of a villa project on its own. If your site has restricted access, say so in the first message; we will tell you straight away whether the standard shell can be delivered that way or whether the configuration needs to change.

Match the specification to how the spa will actually be used

Our product page for this model lists 48 jets, three water pumps and one filter pump, LED lighting (three fixtures plus 26 small LEDs), ozone sanitisation and a waterfall feature, with total power shown at 13.35 kW. Treat that as the reference build, not a fixed order form. What matters in a brief is which of those functions your client will use every week and which are decorative.

  • Daily lap swimming. Length and water flow matter more than jet count. If the brief says "swim training", tell us — some models in the range carry a dedicated swim training system, and where that equipment is not part of the build we will flag it rather than let you assume it is included.
  • Hydrotherapy and massage. This is where jet layout matters. Tell us whether users are mostly tall or short, whether the seating zone needs a specific pressure group for shoulders or lower back, and how many people sit in the water at once.
  • Year-round outdoor use. Insulation, heating and cover options change the running profile of the unit. Our catalogue lists heat pumps, insulation and control systems as options across the range; availability differs by model, so we confirm each one against your chosen build instead of quoting from a generic list.
  • Visual features. A waterfall reads beautifully in a rendered elevation but adds splash-out, noise and a wear surface near the coping. If the waterfall is there for a photograph, we would rather hear that now than after the render has been signed off.

One point worth stating plainly: an equipment list copied from a product page is not a purchase order. Included equipment and electrical requirements vary with the configuration you select, so the quotation we return restates exactly what is supplied and what is optional, line by line.

Give us the electrical reality of the site

Power is where a swim spa enquiry most often stalls in project coordination. A figure such as 13.35 kW total power tells your electrician the scale of the supply, the cable size and the protection device to plan for — but it is written against a particular configuration and a particular supply standard. Before we can confirm anything usable, send us the available supply at the property (single or three phase, voltage, and where the meter and distribution board sit relative to the spa), plus any local rules your electrical inspector applies to outdoor equipment. We work to the information your consultants give us; we do not certify compliance on their behalf, and no supplier should imply otherwise.

If you are coordinating a villa or hospitality project, this is also the moment to settle drainage, an equipment access panel, and how the spa room or plant area will be reached for servicing. A spa installed flush into a deck with no access hatch is a maintenance problem waiting two years to happen.

Bundle it with the rest of the outdoor package

Swim spas rarely travel alone on our order books. The same terrace that carries the shell usually needs loungers, a shaded pergola or hardtop gazebo, an outdoor dining set and storage for cushions and chemicals. Because we manufacture furniture and building materials as well as water features, a single brief can cover the swimming pools and swim spas line together with the patio furniture and the wall or ceiling finishes around it. That matters commercially: one consolidated container, one packing list, one set of shipping documents and one point of contact is easier to administer than five separate supplier relationships arguing over who was responsible for the coping detail.

Our turnkey solutions service covers design consultation, material selection and product specification, production and quality control, project management with site coordination, and installation handover. For projects that need something outside the standard catalogue — a different cabinet finish to match the façade cladding, a bespoke dimension because the terrace is 5.4 m instead of 5.8 m, private labelling for a developer's own brand — our custom and OEM service handles design and prototyping, material and finish selection, and branding such as engraving or logos.

What to put in your first enquiry

Send these seven items and we can come back with a real quotation instead of a list of questions:

  1. Model reference (WS-S06B, or the closest model if you are still comparing) and the quantity.
  2. A dimensioned plan or sketch of the installation area, including access route from the street.
  3. Intended use: lap swimming, hydrotherapy, children's play, guest-facing hospitality, or a mix.
  4. Options you want quoted — heat pump, insulation, automatic cover, UV sterilisation, sand filtration, steps, spare control system.
  5. Electrical supply details and who is responsible for the connection on site.
  6. Delivery address, preferred Incoterms, and your target installation month.
  7. The other items in the same package — outdoor furniture, pergolas, wall panels, flooring — if you want them consolidated.

Once a brief arrives with that information, the sequence is short: we confirm the specification and what is optional, issue a quotation with lead time and packing details, then move to production, freight and delivery. Our logistics and door-to-door delivery service handles sea, air and rail freight forwarding, packaging and container loading, customs paperwork and shipment tracking to the site address you give us. Import duties, local permits and on-site connections remain your consultants' scope, and we say so in writing rather than leaving it ambiguous.

A practical note on comparing models

If the brief is open to alternatives, compare within one family rather than across the whole catalogue. In the same series you will find shorter shells for tight courtyards and units over 11 m for a long garden run, with variations in depth, jet count, waterfall or swim-current arrangements and whether temperature control is part of the build. Send us your constraints and we will shortlist two or three configurations and explain the difference in plain terms — including where a cheaper listed model needs options added to do what your drawing shows.

Bring us the drawing, the measurements and the electrical facts, and the enquiry turns into a quotation you can price against your budget. Contact our team with your project brief and we will confirm the specification, options and delivery plan for your site.

Product dimensions, equipment counts and power figures quoted here are transcribed from the SANTERSON product listing for the model referenced. Included equipment, optional accessories and electrical requirements vary by configuration and are confirmed on the quotation for each order.