A swim spa submittal is the package a buyer, contractor or designer reviews before an order is approved: it is where model identity, dimensions, equipment list and responsibilities get locked down. For the Outdoor Swim Spa WS-S07B-T, that package has to be precise, because this is a configurable unit from our swim and hydrotherapy range — the equipment actually supplied depends on the configuration chosen. Below is the checklist we work to when preparing submittals for this model, so your review team can sign off without chasing missing pages.
1. Model identification and catalogue dimensions
Start with a cover page that repeats the exact model code, WS-S07B-T, together with the product link and the revision date of the document set. Swim spa ranges carry closely related codes, and a submittal naming the wrong one is the most common cause of disputes later over what was included.
The catalogue lists this model at 7000 × 2200 × 1365 mm. Show those dimensions on a dimensioned drawing with the shell, cabinet footprint and access side marked, and state which faces are serviceable. Note that the closely related Outdoor Swim Spa WS-S07B shares the same length and width but a different depth; if your drawings came from a sibling model, ask for them to be reissued before the package is approved.
2. Equipment schedule as configured, not as marketed
Attach an itemised equipment schedule with quantities taken from the confirmed configuration. For this model the catalogue specifications list:
- Control system — 1 set
- Swim training system — 1 set
- Water pump — 1 pc
- Filter pump — 1 pc
- Jet total — 44 pcs
- LED lights — 3, plus 26 small LED lights
- Total power — 8.75 kW
- Features shown — water jets, LED lighting, ozone, swim training system
Two details matter in review. First, the total power figure is a configuration-level number: it changes when options are added or removed, so the submittal should state which combination it applies to. Second, jet counts and pump quantities across our swim spa models differ even where the cabinet length looks identical — compare the schedule line by line instead of assuming continuity between models.
3. Options and accessories, marked included or excluded
Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one should appear in the submittal as either supplied, supplied by others, or not applicable — with a reason where it is excluded. Insulation and heat pump affect running cost and sitework, so an option cell left blank later reads as a promise.
Where a project needs a shape or layout outside the standard catalogue shell, our Customizable Shape Outdoor Spa covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement. Custom geometry means custom drawings, so flag it in the submittal early enough that shop drawings are not assumed to be standard.
4. Site conditions, power and access
The submittal should carry the electrical requirement for the selected configuration — supply, circuit sizing and protection to be confirmed with us before order placement — plus a note on who supplies the dedicated circuit and where the isolator sits. Include drainage, slab or pedestal loading, clearance for filter and pump access, and the delivery route from the truck to the final position: a 7-metre shell is more often lost on site over an access gate than over a specification.
Keep local approvals out of our package and in yours. Import conditions, electrical licensing and any permit requirements for your site sit with your consultant; we supply the product data, drawings and packing information those submissions need.
5. Commercial documents that complete the package
A submittal that survives procurement carries more than technical pages: the signed specification sheet, the configuration summary, packing list and container loading plan, and shipping documentation for the agreed delivery terms. Our Furniture Logistics and Door-to-door Delivery service covers freight arrangements, packaging and container loading, shipment tracking and paperwork support; name the Incoterms and delivery point in force inside the submittal so nobody reconciles two different sets of terms at the port.
Close the package with an approval sheet listing each reviewer comment, the response made, and the date the configuration was frozen. That single page protects both sides when equipment questions surface during installation.
6. Where to send it for review
If you are assembling a submittal for this model, send your drawings and configuration notes to us and we return the schedule, dimensioned data and option status in one set. Our Swimming Pools and Swim Spas range page lists the models available for project specification, including configurations with hydrotherapy jets, LED lighting and water features.
The figures above are catalogue values for the standard configuration of WS-S07B-T. Confirm them against your approved configuration before construction documents are issued.