A quotation for Walnut Solid Wood Wardrobes is rarely a single number. Two suppliers can quote the same bedroom wall at very different prices while the cabinets behind those prices are not comparable at all. Before you sign anything, work through the checklist below line by line, and ask the supplier to put each item in writing on the quotation itself.
1. What the unit price actually covers
Start with the scope of one quoted unit. A made-to-measure built-in wardrobe is normally priced as assembled modules delivered to a port or site, not as a finished, installed piece of joinery. Ask the supplier to state explicitly whether the unit price includes:
- Carcase and door panels only, or carcase, doors, back panels, edge banding and fixing hardware
- Internal fittings — hanging rails, shelves, drawers, soft-close slides, lighting provisions
- Toe kicks, scribes, filler panels and any ceiling-height extension pieces
- Packing materials, protective corner guards and the packing method (flat pack or pre-assembled modules)
- Delivery terms — FOB, CIF or door-to-door — and which costs fall to you after that point
If one quote looks cheaper, it is often because several of these lines sit outside the price. Rebuild every quotation on the same basis before comparing figures.
2. Timber specification and how it is written down
"Walnut" in a product title is not a full specification. For solid timber wardrobes, ask for the species designation, the grade, and whether the panels are solid timber throughout or solid timber frames with engineered cores. Panel construction matters for movement: solid timber responds to changes in humidity, so the quotation and drawing should show how the doors and wide panels are built to limit that movement.
Also confirm the finish system — clear lacquer, open-pore oil, stained and sealed — and whether the sample you approved is the reference for production. Keep the signed finish sample; it is the only practical basis for checking a delivery months later.
3. Solid timber or walnut veneer: check you are comparing like with like
Walnut appears in two different wardrobe families, and they should never be compared on price alone. Walnut Solid Wood Wardrobes sit in the solid wood wardrobe collection, while Walnut Veneer Wardrobes sit in the wood veneer wardrobe collection. Both are made to project dimensions with selectable finishes and layouts, but the panel make-up, edge detail, repairability and price behave differently.
A fair request to any supplier is simple: state, for every visible surface, whether it is solid timber, veneer over an engineered board, or a decorative laminate, and state the edge treatment for each. Once that table exists, quotations become comparable.
4. Dimensions, drawings and who signs them off
Made-to-measure wardrobes are manufactured from drawings, so the drawing package is part of the commercial document. Check that the quotation refers to a numbered, dated drawing set, and that the set shows overall height, width and depth per module; door layout and opening direction; internal zoning for hanging, shelving and drawers; and clearances around skirting, architraves, switches and ceiling lines.
Confirm in writing who measured the site, who prepares the shop drawings, and at what point the drawings are frozen. Changes requested after production starts are where most budget overruns appear.
5. Hardware, hinges and drawer systems
Hardware is often listed as "included" with no brand, model or load rating. Ask for hinge type and closing action, slide type and load capacity, handle specification or the handleless profile detail, and the make of any soft-close components. Then ask what happens if a component is unavailable in your market: can an equivalent be substituted, and who approves the substitution?
6. Freight, packaging and lead time
The quotation should show production lead time from confirmed drawings and deposit, plus estimated transit time by sea, air or rail, and the packing list logic — how many packages, their dimensions and total volume. Volume drives freight cost more than weight does for cabinetry. Ask whether cargo insurance is included or quoted separately, and which party handles customs documentation such as commercial invoices, packing lists and certificates of origin.
7. Installation, snags and after-sales terms
Decide before ordering who installs the wardrobes: your local joiner following supplier assembly drawings, or an installation service coordinated by the supplier. The quotation should say which fixing method is recommended for your wall construction, what tolerance the units are built to absorb, and how snags are handled after delivery — replacement panels, spare hardware, and the warranty period with its exclusions in writing.
8. Payment terms and price validity
Check the deposit percentage, the trigger for the balance (before shipment or on collection of documents), whether the currency and rate are fixed, and how long the quoted price remains valid. Also ask what is excluded — duties, port charges, local delivery beyond the agreed address — so that your landed-cost model matches the quotation rather than your assumption.
How a one-stop supplier changes the paperwork
When wardrobes are ordered as part of a wider fit-out, the same checklist applies across bedrooms, kitchens and bathrooms, but one coordinator can keep the drawing numbers, finish references and delivery windows aligned. SANTERSON works from a China-based factory on villa, hospitality and office projects, covering design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales service across the same package. Bedroom storage is specified as made-to-measure: sizing, internal layout, door style and surface finish are set per project, then confirmed against drawings before production.
If you want a second opinion on an existing quotation, send us the drawing set and the bill of materials and we will tell you what is missing, priced too high or specified ambiguously.
Checklist to attach to your next enquiry
- Scope per unit: panels, doors, hardware, internal fittings, packing
- Timber species, grade and panel construction for every visible surface
- Solid timber versus veneer versus laminate, with edge detail stated
- Numbered, dated shop drawings and the sign-off point
- Hardware brands, models and substitution rules
- Lead time, transit mode, package count, volume and insurance
- Installer responsibility, snag process, warranty period and exclusions
- Payment schedule, currency, price validity and stated exclusions
Contact SANTERSON to discuss wardrobe joinery for your project — phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.