Open storage is one of the easiest items in a joinery package to get wrong, because there is no door to hide behind. Shelf heights, exposed edges, fixing details and what sits inside each bay all show up in the finished room. If you are specifying Santerson Open Storage for a bathroom, bedroom or living wall, the quality of your brief to the factory matters more than the catalogue page does. Below is the information a manufacturer needs before it can quote, and how to send it so that fewer things come back as questions.
Start with the room, not the unit
Send the room context first: which space the unit serves, who uses it, and what needs to stay on show versus out of sight. Open storage in a bathroom behaves differently from an open wardrobe bay in a bedroom or a display niche in a living room, and that difference drives material choice, shelf depth and how the back panel is finished.
Details worth stating in your first message:
- The wall or recess the unit sits in, with overall width, height and available depth measured to the nearest millimetre.
- Floor and wall finishes already installed or planned, including tile set-out and skirting, because they change how a carcass is scribed and fixed.
- Nearby services: basins, taps, showers, towel rails, power points, downlights, and any existing pipework the unit must clear or wrap around.
- What goes in each bay — towels, linen, toiletries, glassware, books — since load and exposure set shelf spacing and board thickness.
Give dimensions you can trace, then confirm on drawings
These products are made to measure: finish, layout and dimensions are specified per project rather than chosen from fixed sizes. That flexibility only helps if the numbers you send are traceable. Send a dimensioned sketch or a marked-up plan, and ask for shop drawings before production starts.
| Item to specify | What the factory needs from you |
| Overall envelope | Width, height and depth of the opening or wall run, plus clearance for doors, skirting and reveals. |
| Internal bays | Number of open bays, target shelf heights, and which shelves are fixed rather than adjustable. |
| Open versus closed split | How much stays open for display and how much is enclosed. Where one run combines both, Santerson Mixed Open & Closed Storage is the reference layout to work from. |
| Fixing method | Wall-mounted or freestanding, the wall substrate behind it (stud, brick or tiled masonry), and any load the unit has to carry. |
| Edge and back finish | Whether edges are exposed on all sides, and whether the back panel is visible in the room. |
Specify finish and material against real conditions
State the environment each unit faces. A storage unit beside a shower or bath sees humidity and splash; a bedroom bay does not. Say so plainly, then ask which board, edge treatment and finish the factory recommends for that condition instead of assuming a decorative panel will perform anywhere in the house.
Points to lock down at this stage:
- The finish reference you want, ideally matched to cabinetry already on the project so doors, carcasses and open shelves read as one set.
- Surface sheen and texture, since a matte and a high-gloss panel in the same colour look very different once installed under site lighting.
- Hardware: handles or integrated pulls, soft-close fittings on any closed section, and whether lighting is built into the open shelving.
- How much variation you accept in wood-look and veneer surfaces — agreed before a batch is cut, not after delivery.
Name the product family you want
The catalogue separates open storage by where it lives and how it is built. Naming the family speeds up quoting, because the factory then knows which construction detail to price.
- Freestanding Open Wardrobes for bedroom runs that stand on their own and may need to move during a fit-out.
- Wall Mounted Open Wardrobes where the run is fixed to the wall and you want a floating, built-in look.
- Metal Frame Open Wardrobes for slim open bays where a metal frame carries the structure.
- Wall Mounted Cabinets and Santerson Drawer Units when the same wall also needs closed volume beside the open bays.
Set out the process and who signs off what
Santerson describes a workflow running from design consultation and space planning through material selection, product specification, manufacturing and quality control, project management and site coordination, to installation and handover. Custom and OEM work follows the same route, including bespoke finishes and prototyping. Treat those stages as checkpoints in your own programme.
Then agree the delivery and installation boundary in writing. The company offers logistics and door-to-door delivery as well as installation and after-sales support; on an overseas project, pin down who handles customs clearance, where the goods land, how they are packed for transit, and who fixes the units on site. Freight terms, lead times and warranty scope should be confirmed per project rather than taken from marketing copy.
Send one consolidated brief, not three emails
The pattern that produces clean results is simple: one document containing room drawings, a dimension schedule, finish references, the open-versus-closed split, and the delivery terms you expect. As a furniture and building materials manufacturer working on villa and hospitality projects, Santerson coordinates joinery alongside other fit-out elements, so a single consolidated brief also keeps open storage consistent with the wardrobes, vanities and cabinetry around it.
If you are early in a project and unsure how open storage should sit within the wider package, start from the open storage product page, note the bays and finishes you want, and send that list with your drawings for a quotation.
Clear dimensions, an honest description of the environment, and one signed-off drawing set before cutting — that is what turns custom open storage from a snag list into a finished detail.