A storage wall is one of the most detailed items in a joinery package to approve. It spans an entire elevation, combines open and closed storage, and its finish has to sit quietly alongside the paint, stone and flooring already specified for the room. A product submittal is how that approval happens: instead of trading questions back and forth by email, the manufacturer puts everything on paper, and the design team signs off once.

If you are specifying Santerson Full Height Storage Walls for a villa, apartment or hospitality fit-out, the submittal below is the set of documents we normally prepare. Bring it to your next coordination meeting and most of the open questions answer themselves.

1. Shop drawings at the scale your site crew will use

Full-height storage walls are made to measure, so the drawings must be based on field dimensions rather than a catalogue module. A usable submittal pack includes:

  • a plan view showing where the wall sits in the room and how it relates to doors, skirting and any adjacent joinery;
  • front elevations at a legible scale, with overall width and height marked, plus each bay dimension;
  • section drawings through the carcass, showing depth, shelf spacing and clearance for handles or push-open hardware;
  • a setting-out drawing that records finished floor level, ceiling level and the position of any sockets, switches or downlights that fall behind the unit.

Where the wall meets an uneven floor, a sloping ceiling or a structural column, ask for those conditions to be drawn rather than absorbed into a tolerance note. That single detail is where most site rework starts.

2. A layout schedule that states what each bay does

Storage walls work when the internal layout matches how the space will actually be used. The submittal should carry a numbered bay schedule that names the function of every compartment: hanging rail, deep drawer, shelf for books, appliance housing, display niche or concealed cupboard. Related pieces from the same collection help you describe what you need — Santerson Open Display Niches for the open parts of an elevation, and Santerson Sliding Storage Panels where doors must travel rather than swing.

Include the drawer and shelf count per bay, plus load expectations for anything heavy, such as books or appliances. It keeps hardware selection from being decided at the last minute.

3. Materials, finishes and the physical samples behind them

A colour code on a drawing is not an approval. The material section of the submittal should list the substrate, the surface material, the finish, the edge treatment and the hardware, each tied to a sample reference you can hold. Under Custom & OEM Service, materials, wood colour, sizes and storage layouts are specified per project, so this is the part of the document that protects your design intent.

ItemWhat the submittal must state
Panel substrateBoard type and thickness for carcass, doors and shelves
Surface finishVeneer, lacquer, laminate or other surface, with grain direction and sheen level
EdgesEdge banding material and colour, or mitred wrap on visible edges
HardwareHinges, slides, handles or push-open mechanism, plus any integrated lighting
Sample referencePhysical sample number sent to site, with the party holding the master sample

Confirm the specification for your chosen configuration before production starts. Finish names used on a website are starting points, not fixed grades.

4. Interface and site-condition notes

Storage walls rarely stand alone. The submittal should record how the unit meets the rest of the build:

  • fixings to wall and floor, including what substrate is behind the finish lining and whether additional blocking is needed;
  • clearance for skirting, architrave and any reveal you want kept around the perimeter;
  • co-ordination with lighting circuits, sockets and any media equipment housed inside the unit;
  • protection requirements once the unit is installed but before handover.

If your project also includes cabinetry in the kitchen or wardrobes elsewhere on the same floor, ask for these to be submitted as one joinery package. One drawing set, one finish schedule and one approval round keeps the timber tone consistent from room to room — the approach we used on a whole-house custom cabinetry project where the bay-window desk, staircase shelving and kitchen all had to read as one family of work.

5. Sequence, logistics and sign-off

The final pages should set out the order of work and who signs what: approved drawings returned for signature, a sample approval sheet, the production window, packing and container loading details, delivery to site, installation and the snag inspection at handover. Turnkey Interior Project Solutions covers this path from design through on-site guidance, which is why a single submittal pack can serve both the designer and the builder.

Practical check before you submit: every dimension should be traceable to a survey, every finish to a numbered sample, and every opening to a named function. Anything left as an assumption in the submittal will become a decision on site under time pressure.

Send us your elevation, room dimensions and the finish you are working towards, and we will prepare the shop drawings, material schedule and quotation as one pack for your review.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact us