A customizable shape outdoor spa is not a catalogue item you simply order by model number. Square, round, oval and curved shells are built to fit a specific terrace, garden or resort deck, so the buyer has to confirm the geometry, structure and water system before production starts. That makes the product submittal the decisive document: it is where the consultant, contractor and supplier agree on what will actually be delivered, installed and maintained. Below is the package we ask project teams to review line by line when specifying our Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool or any unit from our Swimming Pools and Swim Spas range — including the personalized hydrotherapy pool options that turn a standard shell into a spa built around your site.
1. Shell Geometry, Dimensions and Fit to the Site
Start with drawings, not photographs. The submittal should show the proposed shape — square, round, oval or a curved layout — drawn to scale against your deck plan, with overall outer dimensions, internal water depth, seating bench heights and the position of steps and coping. For a custom shape we need the finished level of the surrounding surface, because the shell rim, the cabinet cladding and the deck edge all meet at that line.
- Plan and section drawings of the selected shell, with dimensions in millimetres
- Access route from the factory gate to the installation position: door widths, lift capacity, crane or forklift access, overhead clearance
- Structural support detail for the base — full bearing slab, reinforced deck frame or plinth — and the assumed loaded weight of a filled shell with occupants
- Clearance to walls, glazing and services for pump, filter and control access, not just the visible footprint
A shape that looks right on a mood board can fail on site if the delivery route or the slab cannot take it. Put both questions in writing at submittal stage.
2. Materials and Structural Reinforcement
Our outdoor spas are built with an acrylic shell and balanced structural reinforcement, which is what allows non-standard shapes without a loss of rigidity. The submittal should state the shell material and thickness system, the reinforcement method behind the shell, the cabinet or cladding finish that will be exposed outdoors, and how the rim is finished against stone, tile or timber decking.
- Acrylic shell specification and colour, with a physical or printed sample reference for approval
- Reinforcement layout for custom shapes, since curved panels carry loads differently from straight ones
- External cabinet finish: wood-look, painted or cladded, and the maintenance expected for that finish in a wet outdoor setting
- Edge and coping detail matched to the selected deck material
3. Water System, Jets and Treatment Equipment
Hydrotherapy performance is defined by equipment, not marketing adjectives. For each configuration the submittal lists pumps, jet count and jet types, water features, lighting and the sanitation route. The table below uses our Outdoor Swim Spa WS-S06 as a worked example of the level of detail we expect to see confirmed — figures vary by model and by selected options, so treat them as a format reference rather than your specification.
| Item shown on the catalogue page | What to confirm in the submittal |
|---|---|
| Catalogue dimensions 5820 × 2220 × 1110 mm | Whether these are outer or inner dimensions, and how your chosen shape changes them |
| Jet total 56 pcs; water jets, waterfall, 4 water columns | Jet layout drawing, jet types, which seats they serve and which features are optional |
| Water pump 2 pcs, filter pump 1 pc, control system 1 set | Pump duty, filtration cycle time and where the plant is located relative to the shell |
| LED lights 2 plus 18 small LED lights | Fixture positions, colour mode and the low-voltage supply arrangement |
| Ozone | Whether ozone is the primary sanitation or a supplement, and what routine dosing remains necessary |
| Total power 6.35 kW | Your local supply voltage and phase, circuit sizing, protection device and who supplies the final connection |
Catalogue-listed options such as UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps should appear in the submittal only if you have selected them — and any option that is not listed for your model should be queried before it is assumed.
4. Controls, Electrical Interface and Commissioning Data
Electrical interface is the most common source of delay on site, because the spa supplier and the local electrical contractor each assume the other will handle it. The submittal should carry the control system description, total connected power for the confirmed configuration, the required supply characteristics, and a clear split of responsibility between our equipment and your electrician's final connection. Ask for commissioning guidance too: filling, priming, first heat-up, sanitation start-up and the settings to record at handover.
5. Commercial and Logistics Pages of the Submittal
A spa ordered as part of a villa or hospitality fit-out travels with everything else in the package, so the submittal should match the way the rest of your order is handled. As a one-stop furniture and building materials supplier, we place the spa alongside the poolside loungers, cabanas, pergolas, bathroom ceramics and lighting for the same project so that finishes, delivery windows and site coordination are managed together rather than by four separate vendors.
- Proforma invoice with the confirmed configuration listed option by option, so substitutions are visible
- Packing list and container loading plan, plus sea, air or rail routing and door-to-door delivery scope
- Customs documents: commercial invoice, packing list and certificates of origin for the shipment
- Production schedule tied to the site programme, with the point at which drawings are frozen
- Spares list, warranty terms and maintenance guidance for the shell, jets and controls
Where a project needs an unusual form — a curved spa built around a pool edge, or a shape matched to a bespoke deck — our Custom & OEM Service covers design and prototyping, material and finish selection and brand marking, which is exactly how these non-standard shells reach production.
6. How the Submittal Moves Through Approval
For a spa inside a larger project we work through our Turnkey Solutions sequence: consultation, design and planning, production, logistics, installation and after-sales. In submittal terms that means the drawing set is issued for comment, comments are consolidated into one revision, the client signs off the frozen version, and only then does tooling and shell forming begin. Keep every change request inside that revision cycle — a shape change after sign-off changes moulds, jet layout and power figures at once, and each of those has to be re-approved.
If your project also needs layout planning and 3D renderings for the outdoor area before the spa is fixed in place, our Interior Design Services cover space planning and whole-space indoor and outdoor furnishing schemes, so the spa, the seating group and the hard landscaping are resolved as one drawing set instead of three.
Submittal Checklist at a Glance
- Shape, dimensions and deck interface drawings — approved, signed and dated
- Shell material, reinforcement method and external finish confirmed with samples
- Equipment schedule: pumps, jets, water features, lighting, sanitation, options selected
- Power figures, supply requirements and the electrical responsibility split
- Delivery route, rigging plan and structural support for a filled shell
- Commercial terms, packing list, customs documents and production freeze date
- Spares, warranty and maintenance documentation in the handover pack
Send us your deck plan, target shape and the features you want, and we will return a submittal set with drawings and an itemised equipment schedule for review — including Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features and Round Outdoor Hot Tub Spa with Hydrotherapy Jets & Underwater LED Lights if a standard shell suits your space better than a custom one. Enquiries reach us through the Contact page.