A dining set and a sun lounger rarely fail on site because of the furniture itself. They fail because the clearances were never measured, the seat count was guessed, or the fabric and finish were chosen after production had already started. If you are specifying an aluminum & teak-look slat outdoor dining set with adjustable sun lounger for a resort pool deck, a villa terrace or a café patio, the following inputs are the ones our production team actually works from.
Start with the footprint, not the catalogue page
Send us the usable length and width of the area, measured along finished surfaces rather than structural shells. For the slat-top dining table we need the overall table size you want, plus the clear circulation left around it once chairs are pulled out — that clearance is what determines whether an eight-seat layout works or whether the set should be shortened. Table dimensions on this collection can be adjusted for a project, so tell us the target seat count and the maximum length the space will carry, and we will work back from there.
For the lounger, note the length of the run along the wall, fence or pool edge, and whether loungers sit in a row, at an angle, or free-standing. A lounger placed against a balustrade behaves differently from one that needs clearance on both sides for housekeeping access.
Chair layout and stacking behaviour
The dining chairs in this collection use a sled-style base with clean, straight lines. That detail matters operationally: tell us whether the chairs will be stacked or nested at the end of service, how many you need for peak cover versus daily cover, and where they are stored. A hotel pool terrace that runs forty covers at weekend peak but twelve on a weekday needs a different quantity and storage plan from a private villa.
Recline range and how the lounger will be used
The matching lounger offers multiple recline angles for sunbathing and rest. When you brief us, say who uses it and when: guests who sleep on a lounger for hours need a longer, flatter bed position than a terrace where the lounger is used for reading. If your project needs a wider range of frame styles across different zones, our aluminium sling sun lounger collection covers static sled base, wheeled and folding versions with adjustable backs, which is often the practical answer for high-use pool decks.
Finish, colour and the surrounding palette
The slats on this set carry a teak-look texture, so the wood tone reads warm without the oiling, cracking and fading that come with solid timber. To match it to your project, send the frame colour you want, the tone reference for the slats, and samples or photographs of adjacent finishes — decking, paving, pergola posts, louvred roofing. Frame colours and table dimensions are offered as custom options for hospitality projects, and matching pieces such as the aluminium outdoor dining and bar set with teak accents let you carry one design language from the terrace restaurant through to the pool bar.
Site exposure and drainage
Tell us whether the setting is coastal, poolside with chlorine splash, or inland. The slatted surfaces are designed to drain rainwater quickly and the set is intended for low-maintenance, high-traffic use, but knowing the exposure lets us confirm the finish specification and cleaning guidance rather than assume it. Also state where the pieces will sit in winter — under a cover, stacked in a store room, or left out.
Quantities, phasing and delivery
Send quantities per zone, not one lump figure: dining sets for the restaurant terrace, loungers for the pool deck, spare covers for housekeeping rotation. If your project opens in phases, say so at enquiry stage, because phased production and shipment are arranged through our logistics and door-to-door delivery service, together with the packaging and container loading plan.
The documents that speed up a quotation
- A dimensioned floor plan or a marked-up site photograph for each outdoor zone
- Seat count and lounger count per zone, with peak versus daily cover
- Frame colour and slat tone references, plus adjacent finish samples
- Stacking, storage and housekeeping access requirements
- Site exposure notes: coastal, poolside, shaded or fully exposed
- Required delivery location and any phasing schedule
With those inputs we can confirm the specification through our custom and OEM service, produce to the agreed dimensions, and coordinate the rest of the outdoor package — pergolas, daybeds, swing benches and dining sets — under one order. As a China-based furniture and building materials manufacturer supplying villa and hospitality projects, SANTERSON handles production, packing and shipment from the same brief, so the terrace, the pool deck and the interior joinery arrive as one coordinated set rather than five separate consignments.
Send your drawings and quantities to start a specification review, and we will come back with the configuration options that fit your dimensions and budget.