Open display niches look simple on a drawing. A recess in a wall, a few shelves, something to display books and objects against. Then the joinery arrives on site, the reveal is out of square, the shelf depth does not suit the books, and the lighting that was meant to sit inside the niche has no cable route behind it. The difference between those two outcomes is almost never the design intent — it is whether the buyer specified everything before production started.

This checklist covers what to settle, in writing, before you place a Santerson Open Display Niches order for a villa or hospitality project. The niches sit inside the Integrated Storage Walls collection, alongside Mixed Open & Closed Storage and Integrated Media Storage, which means they are usually ordered as part of a larger wall build rather than as a stand-alone item. That has consequences for the checklist, and we will come to them.

1. What you are actually buying, and what is fixed later

Santerson describes this product line as made-to-measure: sizing, material, finish and layout are specified per project rather than chosen from a fixed catalogue size. That flexibility is the point of going to a China-based furniture and building materials manufacturer for built-ins, but it also moves responsibility onto you. Nothing is decided for you by a standard module.

Before anything else, confirm in writing which decisions are locked at order and which can still move after production begins. Shelf depths, overall niche heights and the position of a fixed vertical divider cannot be changed cheaply once panels are cut. Lighting cable routes, door schedules and finish samples are usually more forgiving — but only if they are still open when the factory asks for them.

2. The dimensional sheet: measure the wall, not the drawing

  • Floor-to-ceiling height at several points, not one. Villa and renovated walls are rarely level, and a storage wall that runs to the ceiling will show every millimetre of that.
  • Out-of-plumb and out-of-square readings along the run, so the manufacturer knows where to scribe, pack or trim.
  • The finished floor level, clearly marked, plus whether skirting is being removed or the joinery sits over it.
  • Obstructions: downlights, switched live points, air-conditioning grilles, radiators, downpipes, structural columns and any beam that reduces the depth of the run.
  • Adjacent finishes — plasterboard, stone cladding, timber panelling or wallpaper — and who is responsible for the junction between them and the joinery.

Where a niche is set into a wall rather than built out from it, add the existing build-up: stud spacing, cavity depth, and whether the wall is load-bearing. A reveal cut into a structural wall is a different trade, on a different programme, and it should not be discovered after the joinery is manufactured.

3. Proportions: what goes in each niche before you size it

Work backwards from the objects. A shelf sized for paperbacks at 240–280 mm depth is wrong for a row of hardbacks, and far too deep for a single decorative object that will look lost in the void. Decide the contents first: books, ceramics, glassware, artwork, plant, project merchandise in a hotel lobby, or a mix.

Then set the proportions deliberately rather than evenly. A run of identical square bays reads as a grid and flattens a room; varying heights across the wall, with taller bays for larger objects and shallower ones for stacked items, is what makes an open display unit look designed rather than fitted. Note that a run of open bays without any closed storage also shows everything, dust included — which is why many projects pair open niches with mixed open and closed storage in the same wall.

4. Materials, finish and edge detail

  • Substrate and core for carcass, shelves and back panels — and whether shelf spans of the chosen depth need support at the stated load.
  • Surface finish: laminate, lacquer, veneer or wood effect, and which side of each panel is finished. Open niches show both faces and the return edge.
  • Edge treatment — matching edge banding, a mitred return, or a shadow gap. Specify it; do not assume the factory will pick one.
  • Back panel: recessed, flush, or omitted entirely, and whether it is a contrasting finish.
  • Certificate and specification sheet for the board and finish actually being supplied, kept in the project file.

Order the finish sample physically. A veneer or lacquer chosen from a screen rendering is not the same decision as one made against the fabric, stone and flooring samples on your board, under the site's own light.

5. Lighting inside the niche — settle this before panels are cut

Lighting is the item most often left too late, because it looks like an accessory and behaves like structure. Recessed or surface-mounted fittings inside a niche need a cable route behind the panels, a driver location with access for maintenance, and a switch or control point that makes sense from the doorway. If Santerson's Integrated Cabinet Lighting is being specified with the joinery rather than added later by a local electrician, confirm the electrical specification and compatibility for the cabinet design, then agree in writing which party supplies the fittings, which supplies the wiring to the first connection point, and which commissions the circuit.

Also decide colour temperature and where the fitting sits relative to glass. A fitting placed too low in a tall bay throws glare into the eye at seated height; one placed high and recessed lights the objects without lighting the viewer.

6. Interface with other trades: who does what, and when

InterfaceSettle before order
ElectricalConduit routes, driver position, fitting cut-outs, circuit testing date
Plastering / drywallWho makes good around the reveal, and whether the joinery is installed before or after decoration
FlooringFinished floor level confirmed; joinery installed over or up to the floor finish
Stone / wall panellingJunction detail at abutting finishes, and who supplies the trim
Site accessLift size, corridor width, stair turns — a one-piece wall section may not fit through either

For a project ordering several built-in elements together — wardrobes, media walls, vanities, kitchen cabinetry — the same interfaces repeat across every element. Fixing them once, in a single coordination document, saves the same conversation happening five times.

7. Procurement and delivery: what to confirm with the supplier

Santerson's stated scope runs from design consultation and space planning through material selection, manufacturing, project management, door-to-door logistics and installation support, with a custom and OEM route for bespoke dimensions and finishes. Those services are only useful if you use them in the right order. A buyer who sends a marked-up drawing gets a quotation; a buyer who sends a dimension survey, a finish schedule, an object list and an electrical layout gets a build that arrives ready to install.

  • Incoterms and delivery address — delivered to site or to port, and who handles customs clearance and duty.
  • Packaging specification for open niches: shelf panels and glass are the parts that travel badly.
  • Container loading plan and how sections are numbered against the installation drawings.
  • Inspection point before dispatch, if you want one.
  • Spare parts and replacement terms, and what happens if a panel is damaged on site.

Freight, duty and transit arrangements are project-specific. Get them quoted for your own address and country rather than relying on general marketing statements, and put the agreed terms in the purchase order.

8. Installation, snagging and sign-off

  • Confirm who installs: local joiner against manufacturer drawings, or a team arranged through the supplier's installation support.
  • Check that installation drawings show every niche dimension, fitting position and finish side — not just an elevation.
  • Snag list at handover: reveal alignment, edge condition, door and shelf operation, lighting function, finish damage in transit.
  • Record the finish codes and board specification used, so a future matching panel can be ordered.

Quick pre-order checklist

  • Dimensional survey with level, plumb and finished-floor readings — signed off
  • Object list per bay, and shelf depths set from it
  • Material, finish, edge band and back-panel decision, sample approved
  • Electrical layout: fittings, drivers, cable routes, control point, responsibility split
  • Interface responsibilities for plastering, flooring, panelling and site access
  • Incoterms, delivery address, packaging and inspection point in the purchase order
  • Installer identified, drawings issued, snag list prepared for handover
One practical note on ordering. Open display niches are usually one element of a larger wall, not a separate purchase. If the same wall also carries closed storage, a media recess or integrated shelving, order them together and coordinate them as a single package — same survey, same finish schedule, same delivery window, one snag list. Splitting them across two orders is how a single wall ends up with two different edge details.

Frequently asked questions

Can I order open display niches on their own, without a full storage wall?

Yes. They can be specified as isolated recessed bays or as a shallow shelving run against a single wall. The survey and finish decisions below still apply; only the coordination with adjacent closed elements drops away.

Do bathroom niches use the same specification?

No. Recessed shelving in wet areas needs a substrate and finish suited to humidity, plus a junction detail with the tiling or tanking. Santerson's Niche Shelving and Custom Niche Paneling are separate product lines for residential bathroom projects, so ask about the wet-area specification rather than assuming a living-room build-up transfers.

How many niches should one wall have?

Enough to hold what you own and display what you want displayed — no more. Every open bay is a dusting surface and an object that has to stay tidy. Most rooms read better with a minority of open bays against closed panels than with a fully open wall.

What information speeds up the quotation most?

A dimension survey, a finish schedule with sample references, a per-bay object list and an electrical layout. Those four documents turn a rough enquiry into a firm price, because they remove the questions that would otherwise come back as several rounds of email.

Send your survey drawings, finish schedule and object list for a made-to-measure proposal on integrated storage walls and open display niches. SANTERSON manufactures to your dimensions, finish and layout, or browse the full Interior Fixtures range.