Folding doors rarely fail on site because of the door itself. They fail because an opening was measured from a drawing instead of the finished floor, because the number of leaves was decided without checking how the stack sits when open, or because the frame was ordered before the wall build-up and floor finish were fixed. If you are specifying Classic Folding Doors for a villa, apartment or hospitality fit-out, the quantity schedule and the coordination drawings matter more than the catalogue page. The checklist below is how we build that schedule on projects we supply.

Start with openings, not with a door count

A folding door is sold as an assembly: leaves, track, hardware, frame and finishing detail. Counting “doors” on a plan underestimates what you actually order. For each opening, record the clear span, the finished floor level on both sides, the head height available after ceilings and services, and the wall thickness the frame has to sit in.

Then confirm which face the door folds to and how much stack space it needs when open. A four-leaf configuration stacked one side needs visibly more pocket or wall recess than a two-leaf pair split across the opening. Where the stack must disappear, compare the folding option with Classic Pocket Doors before you lock the schedule; pockets change the wall build-up and need coordination with framing, skirting and architraves.

Build a quantity schedule that carries real information

A usable door schedule is one a site team can work from without calling you back. For each item include:

  • An opening reference that matches the architectural drawing number, so nobody reconciles two numbering systems on site.
  • Clear opening width and height, plus the finished floor level difference across the threshold if there is one.
  • Leaf count and folding direction, with the open-stack dimension stated rather than implied.
  • Frame type and wall build-up it is fixed into, including whether linings are supplied or formed on site.
  • Finish, glazing or panel choice, and handle or hardware selection per opening.
  • Quantity as complete sets, with spares for wear parts listed separately.

Where several openings repeat the same configuration, group them in one line but keep the individual drawing references. Repeats are what make made-to-measure production efficient, and grouping is what keeps a batch consistent in colour and grain.

Coordinate the products that touch the door

Folding doors sit at the junction of several trades, so coordination means matching your schedule against the items around it. Track, floor guide and threshold depend on the floor finish and its build-up; a screed or tile thickness settled late changes the clear height you have already sized tightly. Paneling and skirting return to the frame line, so decide whether the architrave stops at the frame or wraps it. Where a door is part of a larger joinery wall, order it with that joinery package instead of as a separate purchase.

Our Windows and Doors range covers hinged, sliding, pocket and concealed options in the same project, which is useful when one apartment needs three different opening types with one consistent finish. The same logic applies across a whole villa: doors, wardrobes and kitchen cabinetry share materials and finishes, so specifying them together reduces visible mismatch between rooms.

Confirm made-to-measure details before production

Classic Folding Doors are made to measure, with material, finish and layout set per project. That flexibility only pays off if the confirming information is complete: dimensions taken on site after the wet trades have finished, a signed-off opening schedule, and a written record of which side each door folds to. We ask for that before manufacturing starts, because a corrected leaf arrives later than a corrected drawing.

For projects where doors are one part of a wider package, Turnkey Interior Project Solutions covers design coordination, production, packing and delivery as one scope, so openings, joinery and finishes are checked against the same drawing set rather than three separate orders.

Plan packing, sequence and handover

Folding leaves and tracks are long, and hardware is small enough to disappear in a shared container. Ask for each set packed and labelled with its opening reference, keep hinges, wheels and tracks in a marked box per opening, and store the sets flat in a dry area rather than leaning them against a wall. Deliver in installation order: openings that trades must use during construction come last, so they are installed when clean.

At handover, work through the schedule line by line — every opening checked for smooth travel, alignment and latching, with any adjustment recorded on the same document. That single list becomes your snag record, your spare-parts reference and your warranty paperwork in one place.

Send us your opening schedule

If you have a door schedule or a set of drawings, send it over with the project location and target programme. We will come back with leaf configurations, stack dimensions, finish options and a priced schedule for review before anything goes into production.