A swim spa quotation is only as good as the brief behind it. Two buyers can both ask for Outdoor Swim Spa WS-S12 and receive prices that differ by a wide margin, because the model name fixes only part of the specification. The rest — site conditions, power supply, water treatment options, freight terms — arrives in the drawings, photos and answers to questions our engineering team sends back. This guide lists exactly what we need from architects, builders, villa owners and project procurement teams to quote WS-S12 accurately the first time.

Why the model number alone is not enough

WS-S12 belongs to our configurable outdoor swim and hydrotherapy range. The catalogue entry records a shell of 11740 × 2200 × 1470 mm, one control system, two water pumps, one filter pump, 73 jets in total, LED lighting with ozone as the shown features, and a total power figure of 7.65 kW. Those numbers describe the standard catalogue configuration. They do not describe your site.

The same shell can be ordered with or without a swim training system — that is the practical difference between WS-S12 and WS-S12-T in our catalogue. It can also carry optional heat pumps, UV sterilisation, sand filtration, additional insulation and steps, all of which appear on the product page as options rather than defaults. Because those choices change both the bill of materials and the electrical load, we quote from a confirmed configuration list, not from a model code.

1. Site and access information

The shell is a single large acrylic unit, so how it reaches its final position shapes the price as much as the equipment list does. Please send:

  • A site plan or a marked-up photograph showing where the spa is to sit — in-ground, semi-recessed, on a deck, or on a prepared slab.
  • The finished external dimensions available, including clearance for steps, plant access and any cover or pergola above.
  • Access route details: gate widths, turning radii, overhead cables, crane or forklift availability, and whether the delivery vehicle can reach the pad.
  • Structural information for the supporting slab or deck, together with who is responsible for that substructure.
  • For resort, hotel and clubhouse installations, the room-by-room layout so we can coordinate plant rooms, drainage runs and user circulation.

If the space does not suit a straight rectangular shell, tell us early. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved configurations for terraces, gardens and leisure areas, and we can compare that route against a standard WS-S12 before you commit.

2. Power, water and drainage

Electrical supply is the most common source of change orders on swim spa projects, so we ask for it in writing at quotation stage:

  • Supply voltage, phase and frequency at the intended connection point, plus the available distribution capacity.
  • Distance from the meter or switchboard to the spa, since cable length and containment are usually site-side works.
  • Whether a dedicated circuit, isolator and residual-current protection are already provided, and who supplies them.
  • Hot and cold water supply points, drain and overflow positions, and any rainwater or stormwater restrictions on the site.
  • Preferred water treatment route — ozone is shown as standard for this model, with UV sterilisation and sand filtration available as options.

The catalogue power figure covers the standard configuration. Add a heat pump for year-round water temperature, or add the swim training unit, and the connected load moves. We confirm the electrical schedule against the final equipment list rather than against the brochure.

3. Configuration choices we need confirmed

DecisionWhat to tell us
Swim training systemRequired or not; this is the main functional difference between WS-S12 and WS-S12-T.
HeatingHeat pump required, target water temperature, and whether the spa will run through winter.
Filtration and disinfectionOzone as listed, plus UV sterilisation or sand filtration if your specification calls for them.
InsulationStandard or upgraded insulation, which matters in hot days and cold nights at the same site.
Steps and accessStep type and position, plus any grab rail or accessibility requirement.
Lighting and finishesLED specification and exterior finish against the surrounding cladding or decking.
Control systemThe single control set listed in the catalogue, or an arrangement matched to a building management system on larger projects.

Send your project specification document if you have one. Where our catalogue wording and your specification use different terms for the same item, we mark the difference in the quotation instead of quietly substituting parts.

4. Quantity, programme and commercial terms

For multi-unit developments and hospitality projects, the following lets us price the package as a whole:

  • Quantity of units, and whether identical configurations or different models per building.
  • Required delivery date on site and any phasing between buildings or villas.
  • Destination port or site address, and the Incoterms you want quoted — ex works, FOB, CIF or delivered to the project.
  • Whether you need door-to-door logistics with customs paperwork handled for you, which our Logistics & Door-to-Door Delivery service covers, or whether your own freight forwarder will take the shipment.
  • Inspection arrangements before dispatch, and any third-party inspection you appoint.

Because a swim spa is a large single-piece item, container and stowage planning depends on the confirmed dimensions and options. We advise the loading method with the quotation so your site team can plan unloading in advance.

5. Installation, handover and support

Tell us who installs. Some clients have their own mechanical contractor work from our technical drawings; others want us involved through commissioning. Our Installation & After-sales Support service covers on-site installation, inspection and snag resolution, spare parts and ongoing maintenance, and we agree the scope in writing so responsibilities are not left ambiguous at handover.

If the spa sits inside a wider fit-out — decking, wall cladding, ceilings, lighting and bathroom fixtures for the same building — sending those drawings as a set helps us align the spa specification with the rest of the package. That coordination is the point of a one-stop solution: fewer interfaces between suppliers, and fewer gaps where nothing gets specified.

A short brief you can copy into your enquiry

  • Model of interest: Outdoor Swim Spa WS-S12 or WS-S12-T, or an alternative from the swim spa range.
  • Site type and location; installation method (in-ground, semi-recessed, deck-mounted, slab).
  • Available dimensions and access route, with drawings or photographs.
  • Supply voltage, phase, frequency and distance to the spa.
  • Options required: swim training system, heat pump, UV sterilisation, sand filtration, insulation, steps.
  • Quantity, required delivery date, destination, preferred Incoterms.
  • Installer of record and commissioning support required.
  • Any other trades or finishes the spa must coordinate with.
Send what you have, even if the drawings are early-stage. A quotation built on a rough site plan plus a confirmed option list is far more reliable than one built on a model number alone — and it usually saves a revision cycle.

Specifications quoted above follow the catalogue entries published for WS-S12; final figures are confirmed against your selected configuration. Contact our team with your enquiry and we will return a configuration sheet, a quotation and the technical drawings your engineers need to review.