Outdoor dining orders rarely go wrong because of one bad chair. They go wrong on arithmetic: too few seats for the service layout, two chair profiles that look different once they are on site, table tops specified zone by zone, and spare parts that cannot be matched a year later. The Synthetic Wicker Outdoor Dining Sets family was built around exactly that problem, and it is a useful yardstick to plan against. One open lattice wicker dining chair carries two table options — a round teak-look slat table and a square sintered stone table — so the quantity question and the coordination question can be settled with one product code instead of four.

Count Seats First, Tables Second

Work the quantity plan up from the seat count. For plated al fresco service, allow roughly 60–70 cm of table front per diner and keep about 90 cm of circulation behind a pulled-out chair; on a covered terrace with a fixed balustrade, that clearance is usually what forces a set down by two covers. Buffet and shared-plate layouts can carry more seats in the same footprint, because chairs are not pulled back as far. Fix the number per zone before choosing any table shape:

  • Dining zones — count covers, then convert to sets. A six-seat round group and a six-seat square group need the same chair quantity but different floor areas.
  • Adjacency — mark which zones sit in one sightline. Those should share a single chair profile; zones behind a screen or on another level may differ deliberately.
  • Night storage and turnover — rooftop and poolside settings cleared each evening need chairs light enough to move daily, which is where an aluminium frame wrapped in all-weather rattan earns its place.
  • Spares — order cushion fills and covers with the original batch. Wicker shade and cushion fabric are matched at production, so reordering months later risks a visible mismatch.

One Chair Profile, Two Table Tops: Where The Saving Sits

In this collection the round version uses a teak-look slat tabletop for a natural, casual dining atmosphere, while the square version adopts a sintered stone top suited to high-use commercial environments that need simple daily upkeep. Both sit on aluminium frames, and the chairs share the same lattice wicker weave with thick cushions — a breathable woven structure that stays comfortable in hot climates.

The practical benefit is procurement rather than looks. When every dining zone uses one chair profile, stock can move between zones during a fit-out, a damaged chair can be replaced without changing the look of the terrace, and production receives one order instead of several. Table tops are then chosen per zone by how they will actually be used:

Table optionBest fitPlanning note
Round teak-look slat topVilla terraces, garden dining and casual resort restaurants after a warm timber lookSlatted surfaces let rainwater drain through; the round footprint seats conversation evenly but needs clearance on all four sides
Square sintered stone topHigh-turnover commercial dining, poolside and coastal settings cleaned dailyChosen where wiping down after every service is part of the routine; square tables also line up against walls and planters

Table dimensions, wicker shades and cushion colours can be customised for hospitality projects, so a zone that falls between standard sizes should be raised at drawing stage rather than solved on site.

Coordinating The Rest Of The Outdoor Floor

A dining set never arrives alone. Lounge seating, loungers and bar stools on the same outdoor floor need to read as one scheme even when they are different product families. Two rules keep that reading consistent.

Match the material cue, not the model name. Wicker, rope weave, aluminium slat and teak-look accents sit together well if frame colour, weave tone and cushion palette are held constant. The All-Weather Wicker Outdoor Conversation Sofa Set with Round Coffee Tables works as the lounge extension of a wicker dining terrace, because it repeats the same woven cue at a lower seat height.

Repeat one accent across zones. Teak-look surfaces tie an outdoor floor together. The Aluminum & Teak-Look Slat Outdoor Dining Set & Adjustable Sun Lounger carries that same warm slat tone onto the pool deck, so dining terrace and sunbathing deck look related without duplicating furniture. Where a project wants one more textural step, the Thick Rope Woven Outdoor Dining Set with Multi Tabletop Options applies the same logic in reverse: one braided rope chair matched to sintered stone or teak-effect slat tops, round or square.

The Quantity Sheet To Send With Your Enquiry

Most rework in outdoor furnishing starts with an enquiry that says only "16 dining chairs and 3 tables". A sheet answering the questions below lets production quote once and ship complete:

  • Zone map with cover counts — every outdoor dining zone, its seat count, and whether it is covered, open to weather or salt-exposed.
  • Table top per zone — teak-look slat or sintered stone, round or square, at the dimension your clearance check allows.
  • Finish schedule — wicker shade, frame colour and cushion fabric, defined once and repeated across all related families.
  • Cushion maintenance plan — whether covers must be removable for washing, and how many spare sets the housekeeping rota assumes.
  • Delivery split — which zones are handed over first, so the shipment sequence follows site access rather than production convenience.

As a one-stop furniture and building materials supplier, SANTERSON produces outdoor collections alongside the fixtures and finishes that surround them, with custom/OEM service, door-to-door logistics, installation support and after-sales cover under one agreement. That single scope is what matters here: chair profile, cushion fabric and spare parts all leave the same production run, which is how a terrace still looks consistent in year three.

Three Checks Before You Confirm

Run these against your drawing before releasing production. Seat count against clearance: can every chair be pulled out without meeting a balustrade, planter or neighbouring set? Table top against cleaning routine: does the housekeeping rota genuinely support a stone top in that zone, or is the slat top the honest answer? Spares: have cushion fills and covers been ordered with the batch?

Send your zone map, seat counts and finish schedule through our contact page, and we will confirm quantities, table dimensions and wicker or cushion shades for each zone before production begins.