A glass front shaker cabinet looks simple on a drawing: a recessed-panel frame with a glazed insert in the door. In production it is one of the more input-heavy items in a kitchen package, because the frame, the glass, the internal shelving and the appliance or lighting provisions all have to agree with each other. When we build these cabinets for villa, apartment and boutique hotel kitchens, the enquiries that come back with complete data are the ones that reach production without rework. The list below is the same one our team works from.

Start with the room, not the door

Shaker fronts are a style decision; cabinet sizing is a building decision. Before anyone discusses door profiles, we need the shell condition of the kitchen: finished wall lines, finished floor level, ceiling or bulkhead heights, and where doors and windows actually open. A run that measures 3,600 mm on a tiled site survey can read 3,570 mm once the plasterboard and floor finish are accounted for, and that difference decides whether the tall glazed unit lands flush with the wall or leaves an unsightly scribe.

Send us walls dimensioned to finished surfaces, not structural lines, and mark every fixed element: soil stacks, flues, risers, meter boxes, switch plates, sockets, and any beam or column that reduces depth. If the kitchen is a renovation, say what is being demolished and what stays.

Cabinet dimensions we need for each unit

For every cabinet in the run, confirm these figures. Where a number is still under discussion, send the range rather than leaving it blank — an approximate depth tells us more than silence.

InputWhat to specify
Case heightOverall unit height, plus toe-kick height and whether the unit runs to ceiling or stops below a bulkhead.
Case widthNominal module width per unit, and how end panels are handled at returns and appliances.
Case depthBase, wall and tall depths separately. Glass front doors add hardware thickness in front of the case, so door make-up affects reveal lines across the run.
Door make-upShaker rail and stile widths, panel or glazed insert area, and whether the glazed area is full-height or part-height.
Liners and fillersWhere a filler is acceptable and where a flush reveal is required, especially next to windows and appliances.

Our Glass Front Shaker Cabinets are made to measure, with material, finish and layout set per project, so none of the above is fixed to a standard module — but each decision needs to arrive in writing before cutting.

Glass and door details that change the build

The glazed insert is where most assumptions go wrong. Tell us:

  • Glass type and colour — clear, frosted, reeded or smoked. Tint changes how much of the interior content is legible, which matters if the unit is displaying glassware rather than hiding stores.
  • Glazing method and safety requirement — the fixing detail and the glass specification are set together; send the safety or impact requirement your project applies instead of leaving us to infer it.
  • Door orientation and opening — hinge side, and whether a wall cabinet door is top-hung, lift-up or side-hinged. Lift mechanisms sit inside the case and reduce usable internal volume.
  • Hardware finish and handle style — knobs, pulls or integrated edge pulls. A shaker frame with a knob reads differently from the same frame with a finger pull, and the fixing needs space behind the rail.
  • Interior visibility — back panel colour and shelf material inside glazed units. A glazed door shows the case interior, so the inside finish is part of the appearance specification.

If a glazed unit sits beside a tall pantry or an appliance tower, note that too; we design adjacent units in the same family with matching rail widths and reveals. For full-height glazed storage outside the kitchen line, see our Glass Front Tall Cabinets.

Internal layout, lighting and appliances

Glazed cabinets are usually display cabinets, so the internal grid matters as much as the exterior. Send us what will actually be stored: dishware heights, glassware, small appliances that stay on show, and whether adjustable or fixed shelving is preferred. Shelf spans need support where heavy ceramics sit, and shelf positions should avoid the light fitting.

If integrated lighting is wanted, confirm it early. Interior lights need a cable route into the case, a driver location that stays accessible for service, and a switching arrangement — door-activated, wall switch, or sensor. Lighting added after the case is built usually means visible surface conduit, which defeats the purpose of a display cabinet.

Appliances are part of the cabinet specification. Send appliance models with their cut-out dimensions, door swing direction, ventilation requirement and door-front type (integrated panel, own front, or framed). A wine cooler or oven inside a glazed run changes both the carcass structure and the reveal pattern around it.

Finish selection and how to communicate it

Shaker frames are commonly painted, lacquered or foil-wrapped, and the frame and centre panel can take different finishes on purpose. Send the finish by name and code where you have it — paint colour with brand and code, lacquer sheen level, or laminate/foil reference. Where a physical sample governs, say so and tell us which surface the sample applies to: frame only, or frame plus panel.

Two-tone schemes need an explicit rule about where the colour break happens: at a corner, at a tall unit, or along the whole wall. Our Light Grey Shaker Style Kitchen Cabinets combine a light grey frame with off-white panels and warm-lit glass display units — a useful reference for how a two-tone shaker scheme reads once it is lit on site.

Send the finish schedule as a table keyed to each unit type, not as one colour note against the whole elevation. A glazed wall cabinet and a solid base door in the same paint can read differently under warm interior lighting, and a per-unit schedule lets us flag that before production.

Project inputs beyond dimensions

Alongside measurements, these items determine how the package is quoted and produced:

  • Scope split — which rooms the shaker run covers, and whether wardrobes, vanity units or media walls in the same project use matching door styling.
  • Drawing status — concept, tender or construction stage. Construction drawings with elevations and sections are what we work from; a mood image alone is not enough to price joinery.
  • Quantities and phasing — unit counts per dwelling, number of dwellings or floors, and whether the order is split into lots. Phased deliveries need to be planned at the start, not after production begins.
  • Delivery destination and access — port or site address, container or consolidated shipment, and on-site access for tall glazed units. Glass-fronted modules are packed and handled differently from solid-door cases.
  • Site conditions — storage available before installation, other trades in the kitchen zone, and the intended installation sequence.

We produce cabinetry alongside the rest of the fit-out — flooring, wall panels, doors, lighting and bathroom fixtures — so a single package avoids duplicated measurements and conflicting finishes. If you are specifying several shaker variants for one project, our Grey Shaker Cabinets and White Shaker Cabinets pages show how the same door family is carried through different colour schemes.

A practical checklist before you send an enquiry

  • Measured survey to finished surfaces, with heights, depths and fixed services marked.
  • Elevations for each cabinet run, showing appliance positions and reveals.
  • Per-unit schedule: height, width, depth, door type, glazed or solid.
  • Glass specification and safety requirement per glazed unit.
  • Internal layout, shelf duty and lighting notes for display units.
  • Appliance schedule with cut-outs, ventilation and door-front type.
  • Finish schedule keyed to unit types, with codes or sample references.
  • Quantities, phasing, delivery address and site access notes.

An enquiry that carries these inputs can be quoted against a defined specification, and the drawings we return will match what your site expects. Send us the survey and the unit schedule first; where a decision is still open, mark it as open and we will propose options rather than guess.

To specify glass front shaker cabinets for a villa, apartment or hotel kitchen project, send your drawings and unit schedule to SANTERSON and we will return detailed production drawings.