A swim spa looks simple on a specification sheet: one shell, a set of jets, a pump or two, some lighting. On site it is one of the most coordination-heavy items in a villa or resort package, because it sits at the meeting point of civil works, power distribution, waterproofing, landscaping and delivery access. This guide uses the Outdoor Swim Spa WS-130BⅢ to walk through how we build a bill of quantities for one unit and what has to be coordinated around it before the shell arrives.

In short: one WS-130BⅢ is not one line on a purchase order. It is the shell, its confirmed options, the power and civil works around it, and the outdoor furniture that shares the same delivery window. This article walks through each of those groups.

Start with the configuration, not the quantity

Quantity planning only becomes reliable once the specification is frozen. For WS-130BⅢ the catalogue lists a shell of 9950 × 3000 × 1430 mm, one control system, one swim training system, one water pump, one filter pump, twenty jets, seven LED lights and a total power figure of 10.85 kW. Those numbers are the starting point for coordination, and they are what we compare against when a project asks for an alternative in the same footprint.

The closest comparison is Outdoor Swim Spa WS-130BⅢ-U. It carries the same 9950 × 3000 × 1430 mm envelope, so the civil works, crane path and surround are identical. Inside that envelope the water system differs: four water pumps instead of one, twenty-three jets instead of twenty, five LED lights instead of seven, a total power figure of 11.85 kW, and no swim training system listed in the captured specification for that variant.

That difference matters to quantity planning in three practical ways:

  • Electrical load. The two configurations sit at different total power figures, so the supply sizing, protection and any dedicated circuit must follow whichever model is on the final order — not a generic allowance carried over from an earlier drawing.
  • Programme intent. A unit specified for lap swimming needs the swim training system; a unit specified mainly for hydrotherapy carries more jets and pumps. Choose per location by how the space will actually be used.
  • Line items, not one line. The shell, the control system, the swim training system, the pumps and the lighting are separate order lines with separate lead times. A single "1 × swim spa" line on a purchase order is where most coordination problems begin.

A bill of quantities for one WS-130BⅢ installation

For each unit we split the quantity sheet into four groups. Grouping this way keeps the spa, its options and the works around it on the same document, so nothing gets assumed by somebody else.

1. The spa itself

  • Shell and cabinet in the selected configuration — 9950 × 3000 × 1430 mm for WS-130BⅢ.
  • Control system: 1 set per unit.
  • Swim training system: 1 set per unit where the selected configuration includes it.
  • Water pump, filter pump, jets and LED lights as listed for the selected model; count them line by line so a later substitution is visible.

2. Options confirmed per unit

The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so each option is confirmed against the specific unit rather than applied across a whole order. Heat pump and insulation are the two we see most often decided late — and they change both the electrical schedule and the delivery date.

3. Site works around the spa

  • Foundation or plinth sized to the shell footprint, with an access allowance for the equipment side.
  • Power supply, protection and any dedicated circuit matching the confirmed total power figure.
  • Drainage, overflow and any plant-room or equipment-storage allowance near the unit.
  • Deck, coping and landscaping interface — fixed after the shell dimensions are confirmed, not before.

4. Access and handling

A nearly ten-metre shell needs a delivery route, a lifting path and a final position that all agree with each other. On constrained villa sites we check the truck access, the turning space and the crane or forklift reach before the unit is manufactured, because re-routing after production starts is expensive.

Coordinating the spa with the rest of the outdoor package

A swim spa is rarely ordered alone. On a poolside or terrace scheme it usually travels with loungers, a shaded structure and a dining set, and those items should be specified together so materials, finishes and delivery dates line up.

The point of specifying these together is practical: one delivery window, one set of access arrangements, one inspection at handover. As a one-stop furniture and building materials supplier, SANTERSON supplies outdoor collections alongside the water features and the interior fixtures of the same project, which removes several handovers between separate vendors.

A short coordination checklist before you place the order

  • Confirm the exact model code per location — WS-130BⅢ and WS-130BⅢ-U share a footprint but not a water system.
  • Confirm which options are included on each unit, and get the revised total power figure for the electrical schedule.
  • Confirm what is supplied by SANTERSON and what is done locally: foundation, power supply, drainage, deck finishes.
  • Agree packing, container loading and the delivery address for each unit, especially where several villas or blocks are involved. Our logistics and door-to-door delivery service covers freight, customs paperwork and shipment tracking.
  • Set the sequence: shell in place first, then deck and coping, then commissioning of the water system and lighting.
  • Book the inspection and handover records for each unit at the start, so snagging on a multi-unit order is handled unit by unit.

Getting an exact quantity sheet for your project

Send us the plan or the pool-deck layout and we will return a per-unit breakdown: model code, included equipment, options, power figure, packing list and the site works expected on your side. For projects that need several units across villas or resort cabins, quantities are prepared location by location so each unit matches its own access and power conditions.

Contact SANTERSON to discuss Outdoor Swim Spa WS-130BⅢ or the wider swim spa range, and we will confirm the specification, options and delivery arrangements for your site.