A door schedule can look complete on paper and still leave a project exposed at handover. Quantities are listed, finishes are named, and the price per set appears reasonable — yet the opening sizes were never verified on site, the ironmongery was never assigned to a line item, and the drawing that came back is a rendering rather than something a fabricator can build from. Before you sign anything for classic panel hinged doors, it is worth reading the proposal as a set of commitments rather than a quotation.
The checks below are the ones that separate a workable door package from an expensive argument on site. They apply whether you are fitting out a villa in Sydney or Melbourne, or specifying bedroom and bathroom doors across a hospitality project.
1. Confirm what is actually being quoted
Door pricing varies enormously depending on where the boundary of supply sits. Ask the manufacturer to state, line by line, exactly what each price covers:
- The leaf or slab itself — and whether it is a solid core, a honeycomb core or a hollow construction.
- The frame, architrave and any lining, and whether these are included or charged as extras.
- Ironmongery: hinges, handle set, lock body, strike plate, door closer and any acoustic seal.
- Glazing where a panel is glazed, including glass type, thickness and safety grade.
- Finishing: primer only, or a full factory finish in the specified colour or veneer.
- Packaging, protective crating and whether doors travel flat or assembled.
If any of these are missing from the written proposal, they will surface later as a variation. A supplier comfortable listing them item by item is usually a supplier used to project work.
2. Check how sizing was established
Classic panel hinged doors are usually made to measure, which makes the source of the dimensions the single most important technical detail in the file. A good proposal states whether the sizes came from architectural drawings, from a site survey, or from a schedule you supplied and the manufacturer simply copied.
Push for three things in writing:
- Clear opening size versus finished leaf size, with tolerance allowance stated.
- Floor finish build-up — the thickness of screed, adhesive and final floor covering — because a threshold error of 15 mm can render a door unusable.
- Handing and swing direction for every opening, plus whether any door is specified to sit in double reveal or pocket.
Where the manufacturer offers site measurement or on-site guidance as part of a turnkey scope, ask how that is arranged in your country and who signs off the final dimensions before production starts.
3. Read the drawings, not the renders
A photorealistic image tells you the panel proportions look right. It does not tell a fabricator anything. Ask for production drawings showing stile and rail widths, panel thickness, the moulding profile on each face, frame profiles, and hinge positions. Then check that:
- The panel configuration matches the sample or reference image you approved.
- Veneer direction and grain match across a run of doors in one corridor or room set.
- Cut-outs for locks, hinges and hardware are dimensioned, not assumed.
- The drawing is signed off by your designer or site representative before tooling begins.
A proposal that includes a shop-drawing stage with a named approval step is materially lower risk than one that moves straight from an order form to production.
4. Verify the material and finish description against your specification
Marketing language such as “solid wood” or “natural veneer” covers a wide range of constructions. Match each phrase in the proposal to a specific build-up, and where the proposal is vague, ask for it in writing before you place the order. Useful clarifications include:
| Proposal wording | What to ask for instead |
| Wood veneer finish | Species, cut (crown, quarter, rotary), thickness, and whether the grain pattern is matched across the set. |
| Painted / lacquered panel | Colour reference (RAL or manufacturer swatch), number of coats, sheen level, and primer versus full finish. |
| Glass panel option | Glass type and thickness, edge treatment, whether toughened glass is used, and the glazing bead detail. |
| Hardware included | Brand or model, finish, cycle rating, and whether hinges are supplied loose or pre-mounted. |
5. Test the supplier’s project workflow
Doors rarely fail on their own; they fail because they arrive at the wrong stage of the programme or without the components that make them work. Ask how the manufacturer sequences a door package alongside other joinery and finishes. A structured process — consultation, design and planning, production, logistics, installation and after-sales — is what you want to see described, with responsibilities named at each stage.
Specific questions worth asking:
- What is the production lead time measured from drawing approval, not from enquiry?
- Which freight mode is proposed, and what paperwork (commercial invoice, packing list, certificate of origin) will be provided?
- Does delivery go to port or door-to-door, and who handles customs clearance?
- How are snags, replacement panels and spare hardware handled after handover?
Get dates in the contract as milestones tied to drawing approval. “Approximately six weeks” is not a commitment.
6. Compare like for like across suppliers
The cheapest door quotation is often the one that excludes the most. Build a simple comparison sheet with the same columns for every bidder: leaf construction, frame and architrave, ironmongery, finish, drawing stage, lead time from approval, delivery terms, and after-sales scope. Suppliers such as SANTERSON that quote doors as part of a wider joinery and fit-out package can simplify coordination — one factory handling standard interior hinged doors, wardrobes, cabinetry and wall panelling means fewer trades arguing over tolerances at the interface.
That convenience only holds if the interfaces are documented. Ask who is responsible for the reveal between door frame and wall panel, and who sets out the line before either is manufactured.
7. Check references and sample quality
Before committing to a full schedule, request a sample leaf or at minimum a sample panel with the actual moulding and finish. Panel doors show their quality in the details: the crispness of the moulding line, the alignment of the panel within the frame, the flatness of the finish, and how the stiles meet at the corners. Then ask for two or three completed projects where similar doors were supplied and installed, and follow up with the project contact rather than relying on photographs.
A practical next step
Send every bidder the same door schedule, the same finish specification and the same delivery terms, then compare what comes back. The differences will be instructive: one supplier will produce drawings and a detailed bill of inclusions, another will send a price and a rendering. That contrast usually tells you more than the numbers do.
If your project needs doors coordinated with cabinetry, panelling and other built-in work, review the windows and doors range alongside the wider joinery offer, then request a made-to-measure proposal for one opening type as a trial before releasing the full schedule.
A well-assessed proposal costs you an extra week of scrutiny before order. A poorly assessed one costs you a re-order, a delay and a site programme that never recovers.