An eight-metre swim spa is not a catalogue item you simply order and drop onto a deck. Before a quotation for Outdoor Swim Spa WS-130AⅢ-U becomes a production order, the buyer and supplier need to agree on what is included in the shell, what sits in the plant room, how the unit reaches the site and who connects it. This article sets out the customisation topics that decide price, delivery sequence and finished performance, so procurement teams, villa owners and contractor buyers can walk into that conversation with a written list instead of assumptions.
Start With What the Base Model Already Fixes
The value of discussing customisation early is that some things cannot be changed later without cost. On this model the shell footprint is set: an 8000 mm length, 3000 mm width and 1400 mm water depth, which determines the structural deck opening, access route and lifting plan long before any equipment choice. Jet count is listed at 23 across four water pumps with one filter pump, and total installed power at 11.85 kW — a figure your electrician needs on day one, because an electrical supply sized for the standard build does not automatically absorb a heat pump or extra pumps added afterwards.
Note also that this variant is listed with water jets, LED lighting and ozone as its shown features, and the swim training system is not recorded in its captured specification. If your project assumes in-place swimming against a current, raise that at the enquiry stage rather than discovering it at handover.
Base specifications as catalogued
Model WS-130AⅢ-U · 8000 × 3000 × 1400 mm · control system 1 set · water pumps 4 pcs · filter pump 1 pc · jets total 23 pcs · LED lights 5 · total power 11.85 kW
Treat these as the transcribed catalogue figures for the standard build. Confirm them in writing against your own configuration sheet, since equipment lists move between production runs.
Equipment and Filtration Choices to Settle Before Order
The catalogued optional accessories for this range are the practical agenda for the conversation: control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one answers a different question, and each has knock-on effects.
- Heating source. A heat pump changes the running profile of the spa far more than any lighting option. Ask what heater or heat pump is quoted, what insulation package comes with it, and how the total power figure is recalculated once it is fitted.
- Filtration route. Sand filtration versus cartridge filtration changes where equipment sits on site, the plumbing runs, and what the owner has to maintain. Decide this alongside the plant room layout, not after.
- Water treatment. Ozone appears in the standard feature list; UV sterilisation is a separate option. Ask which combination is quoted and what dosing or consumables the owner is expected to keep buying.
- Pump count and jet layout. Four water pumps and 23 jets are listed for the base build. If you want a different massage zoning pattern, ask how many pumps that needs and what it does to power draw.
- Control system. One control set is standard. Specify the interface style, mounting position and whether remote or app control is part of the quoted unit or a later addition.
- Access and steps. Steps are an option in the catalogue and they affect the deck edge detail and the safe entry point. Confirm their position against your deck design.
Where a project needs something outside that list, SANTERSON’s Custom & OEM Service covers bespoke design, prototyping and material or finish choices. For shaped hydrotherapy basins rather than a rectangular spa shell, the site also lists a customisable shape outdoor spa in square, round, oval and curved forms — useful to know when the architecture, not the equipment list, is driving the geometry.
Site, Services and Delivery: The Questions That Decide Programme
A spa of this size arrives as a manufactured shell that must be transported, lifted and set before the deck is finished. Buyers should ask, in writing: what is the delivered weight and lifting arrangement; can the site accept it by road; is a crane booked by the supplier or the client; and where do power, drainage and overflow connect. SANTERSON’s logistics service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and door-to-door delivery, so the transport question can be settled with one counterparty rather than several.
Import terms, duties and Incoterms still need confirming for each destination, and local electrical and building requirements are the client’s or their local contractor’s responsibility. Ask what documentation comes with the unit — wiring diagram, plumbing layout, equipment schedule — so the local trades can price their work from drawings instead of guesswork.
Finishes, Surrounds and Coordination With the Rest of the Project
The spa rarely stands alone. Poolside lounging, shade and the hard landscape around the shell usually come from the same supplier on a villa or resort project, which is why this product sits inside the wider swimming pools and swim spas range alongside hot tubs and long hydrotherapy pools, and within the project services that run from consultation and design through production, logistics, installation and after-sales.
Worth specifying at the same time as the spa: cabinet finish and cladding colour against the exterior palette; LED lighting output and colour against landscape lighting; seating, loungers and pergolas for the surrounding deck; and the insulation package for the climate the unit will actually sit in. Ordering these together avoids two deliveries, two lifting operations and a mismatch between the spa shell and the deck built around it.
A Short Checklist to Put in Your Enquiry
Send these ten items with your enquiry
- Site photos, access route and deck dimensions for an 8000 × 3000 mm shell.
- Available electrical supply: phase, breaker size and where the isolator will sit.
- Heating choice and target water temperature, with the resulting total power figure confirmed in writing.
- Filtration type (sand or cartridge) and plant room location.
- Water treatment: ozone as standard, UV if required.
- Jet zoning pattern and pump count for that pattern.
- Control interface type and mounting position.
- Steps style and entry position relative to the deck.
- Cabinet finish, cladding colour and LED lighting specification.
- Delivery address, lifting method required, and who books the crane.
A supplier quotation that answers all ten is directly comparable between projects. One that answers six leaves you to discover the rest on site, which is where swim spa budgets usually slip.
Common Buyer Questions
Can the specification be changed after production starts? Anything that alters the shell, jet positions or plumbing is difficult once fabrication begins. Equipment such as sterilisation, steps and finishes can usually still be adjusted, but confirm the cut-off with the factory before the order is placed.
Why does total power matter so early? The 11.85 kW figure applies to the catalogued build. Heating and additional pumps raise it, and the electrical supply must be sized for the finished configuration — not the brochure version.
Who handles installation? On-site installation, inspection and after-sales support are listed services, with local requirements handled per project. Confirm who installs at your site and what warranty terms apply to that work before the unit ships.
Customisation on a model of this size is less about adding features and more about fixing decisions in the right order: shell and access first, plant and power second, finishes and surrounds last. Put the ten-item list in your enquiry and the conversation with the factory becomes a comparison of configurations rather than a negotiation over what was assumed to be included.