A floating TV unit looks simple on a drawing: a horizontal cabinet fixed to the wall, some open niches, a screen above it. On site it is one of the harder built-in items to get right, because it combines wall structure, cable routes, screen geometry and joinery tolerances in one small elevation. Our Floating TV Units in the TV Cabinets / Media Units collection are supplied made to measure, so the specification conversation happens before production rather than after delivery. Below is the list of questions we settle with the buyer on each project, and what every decision changes on site.

Why a floating TV unit needs more discussion than it looks

Catalogue listings for these units state three things: made-to-measure sizing, material and finish options, and a layout tailored to the project. That is accurate but incomplete as a brief. A buyer who sends only "wall hung, about 3 m wide" will get a quotation that has to be reissued when the electrical contractor, the screen supplier and the plasterer each have their own opinion about the same wall. The eight sections below are the points we ask you to answer up front.

1. Dimensions and wall structure first

Send us the finished floor level, the ceiling height and a dimensioned wall elevation before talking about finishes. We need to know the wall build-up (timber stud, steel stud, masonry or a framed substrate) because a wall-mounted unit transfers its load and its full hanging weight into that structure. Where the wall cannot carry the fixings on its own, we add backing, a concealed frame or a floor-supported return early in the design so the reinforcement is not discovered during installation.

For floating units we settle three measurements with you: the height of the unit off the finished floor, the depth of the carcass, and the projection of any shelf or top panel. Those numbers drive cable drops, skirting returns and whether the plinth shadow line reads cleanly under site lighting.

2. Layout: open, closed, or both

Tell us what actually lives in the unit. Media components, consoles and routers need ventilation and access to rear ports. Books and objects want open shelving. Blankets, board games and cleaning items want doors. A typical residential layout mixes both, and we build that mix into the carcass rather than asking the site team to adapt it later. See Santerson Open & Closed Combo Units for the format we most often quote.

If the unit also has to carry glass-fronted display, the shelf loading and the door hardware change together. Santerson Glass Front Media Units use the same made-to-measure approach, so we confirm glass type, storage layout and hardware selections per project instead of applying a default.

3. Materials, substrate and finish

Material and finish options are specified per project. What matters commercially is that you tell us the finish system your other joinery uses (veneer, lacquer, acrylic, laminate or a textured panel) so the media wall matches the custom built-in kitchen cabinets and wardrobes in the same dwelling instead of sitting beside them. Where a project runs several units across villas or apartment types, we produce one approved finish sample and repeat that reference on every unit.

Edge treatment, handle style or handleless routing, and the visible shadow gap are part of this decision, not extras added later. If your detail drawings call for a 10 mm reveal or a mitred edge, send the drawing; we build to it.

4. Lighting and electrical coordination

Integrated lighting is a specification item, not decoration. For lit display niches we use Santerson Integrated LED Media Units, and we confirm the lighting and electrical details for the selected design before production: driver location, switching or dimming control, cable route to the niche, and whether the transformer sits in an accessible service zone.

The wall behind the screen usually needs more than one outlet. We ask for the final screen size and mount type so the bracket zone, socket positions and any trunking stay hidden behind the panel while remaining reachable for service. Where a project uses a flush wall-mounted arrangement, we coordinate with your electrical contractor so first-fix and joinery openings are cut once.

5. Screen geometry and viewing height

The floating unit sets the screen height, so we confirm the seating layout before fixing the unit level. Send the screen size and mount depth, and we set the carcass top line, any recess, and the clearance behind the panel accordingly. This is also where we decide whether a full-height media wall is required instead. Santerson Storage & Display Combo covers the floor-to-ceiling format, and a wider wall treatment can be extended with Floating Shelves.

6. Hardware, doors and access

Specify door type and opening direction for every bay, because hinge choice affects carcass depth and the clearance needed in front of the unit. Tell us whether you want soft-close hardware, push-to-open, or a visible handle, and which bays must give rear access to equipment. Anything that needs servicing, such as a router, a decoder or a media player, should be behind an accessible opening, not a fixed panel.

7. Installation method and site sequence

We agree the fixing method with your site team in writing: the substrate preparation, the setting-out line, the load path, and who supplies the wall fixings for the specific build-up. We also confirm where the unit must arrive in the sequence, typically after painting and floor finishes and before final snagging, so the fixing holes do not damage completed decoration.

For whole-apartment packages we treat the media unit as part of a set with Santerson Wall Mounted Sideboards and the bedroom joinery, so one setting-out drawing governs all of them and the reveal lines match from room to room.

8. Packaging, delivery and after handover

Tell us the delivery address type: an apartment tower with a lift limit, a villa with a gate, or a hotel floor under fit-out. Panel length and packaging follow from it. Packing and container loading are handled as part of the order, and shipment is arranged through our logistics and door-to-door delivery service, with installation and after-sales support arranged separately where the project requires it.

We also settle in advance what happens if a unit is damaged on site or a dimension changes late. Spare panels and replacement parts are quoted per project, and the reference number used at production appears on the packing list so the site team can identify the correct item.

What to send us to start

  • A dimensioned wall elevation with finished floor level and ceiling height, plus the wall build-up.
  • Screen size, mount type and required viewing height.
  • Layout preference: open shelving, closed storage, glass fronts, or a combination.
  • The finish system used by the project's other joinery, with a sample reference where available.
  • Electrical layout: socket positions, lighting requirement, control type and driver location.
  • Hardware preference, door opening directions and which bays need rear access.
  • Delivery address type, quantity per unit type, and the installation sequence on site.